Elementos Limited · ASX:ELT

Elementos — IMARC 2023

23 slides from Elementos's conference presentation, Nov 2, 2023

  1. Slide 1: Tin for an Electric Tomorrow

    TIN FOR AN ELECTRIC TOMORROW For personal use only IMARC 2023 - Investor Conference Presentation November 2023

  2. Slide 2: Cautionary statement

    Cautionary statement This Presentation provides general background information about Elementos Limited’s (“Company’s”) activities. That information is current at the date of Of the Mineral Resources scheduled for extraction in the Study mine production plan, approximately 21% are classified as Measu

  3. Slide 3: Tomorrow's tin

    Tomorrow’s tin Emerging tin developer on the cusp of defining and funding projects. For personal use only Elementos Limited (ASX:ELT) owns two world class tin projects with large resource bases and significant exploration potential in mining-friendly jurisdictions. • One of only a handful of listed

  4. Slide 4: Tin is the metal most impacted by electrification and new green technologies

    Tin is the metal most impacted by electrification and new green technologies. For personal use only Did you know? Others • Tin is a key electrical contact in electric vehicles advanced robotics renewable energy computers & IT energy storage electronic circuits (solder), printed circuit boards and se

  5. Slide 5: Tin price holding firm during a soft 2023

    Tin price holding held firm during a soft 2023 Muted demand currently balanced out by weak supply For personal use only US$37.5k Fundamental supply tightness has resulted in the tin price trading in a ~US$25-30k/t price band. However, demand SHFE US$29,060/t appears to be picking up with SHFE stockp

  6. Slide 6: Current tin market supply is struggling to maintain production levels

    Current tin market supply is struggling to maintain production levels 3 Source: ITA (International Tin Association) December 2022 For personal use only Limited Security of Supply for Europe, Aus & USA Major producers struggling to maintain production levels Major global tin concentrate producers (20

  7. Slide 7: Tin market in deficit

    Tin market in deficit Global tin stockpiles sit at around ~13.6kt with tin concentrate hard to secure For personal use only Despite the recent weakness - global tin demand is forecast to increase 3-4%pa to service the technology revolution. • ~3%pa growth (vs. historic 1.8%pa) is forecast to cause t

  8. Slide 8: Oropesa Tin Project, Spain

    Oropesa Tin Project, Spain Poised to be Europe’s first new significant tin mine For personal use only Greenfield, Open-pit tin project in EU • Open-cut tin mining and processing operation producing tin concentrates for smelters in Europe, North America or Asia. • Responsible approach to mining, with

  9. Slide 9: Optimisation Study (2022)

    Optimisation Study (2022) High level layout and production target summary For personal use only Based on JORC Resources (November 2021) Mineral Resource (Nov 2021) Production Target (2022) 18.86Mt 0.40% Sn [75.4kt Sn] 82% conversion US$30,000/t Pit Shell 15.50Mt 0.37% Sn [56.8kt Sn] Included Dilutio

  10. Slide 10: Optimisation Study (2022) Summary

    Optimisation Study (2022) Summary NPV = A$342m, 2.5yr payback For personal use only Life of mine Tonnage averages Annual ore mined Annual ore sorter feed Annual processing plant feed Annual tin concentrate (62%) Annual tin metal production 1,250,000t 1,250,000t 1,000,000t 5,400t 3,350t Annual waste

  11. Slide 11: Optimisation Study Snapshot

    Optimisation Study Snapshot C1, C2, C3 & All-In-Sustaining-Cost For personal use only Key Results Key Costs Outputs (AISC) Summary US$/tonne US$/tonne Cost Area Construction Capital Sn Conc. Sn Metal Low capital cost US$86m Clearing, Topsoil & Mining Preparation $113 $180 Mining $4,599 $7,369 Annual

  12. Slide 12: 2023 Mineral Resource Estimate Update

    Oropesa Tin Project, Spain 2023 Mineral Resource Estimate Update9 For personal use only 95% of 2023 MRE is classified either Measured or Indicated Resources, totaling 18.5Mt at 0.39% Sn • 38% of 2023 MRE is classified as Measured Resources, increasing by 3.1Mt (+73%) • 100% of 2023 MRE tonnes locate

  13. Slide 13: Zinc potential as Mineral Resource and by-product concentrate credit

    Oropesa Tin Project, Spain Zinc potential as Mineral Resource and by-product concentrate credit Substantial zinc mineralisation intersections (11,446 assays) have For personal use only been confirmed from within Oropesa Tin Mineral Resource area. Including some significant high-grade zones as shown

  14. Slide 14: Strong partners delivering DFS

    Strong partners delivering DFS The project has partnered with over 50 experienced and qualified local companies For personal use only Study & Project Leads Technical Partnerships Engineering Partners Site & Laboratory Contractors Environmental, Survey and Local Partners University & Corporate Relati

  15. Slide 15: Project materially de-risked, DFS substantially completed

    Project materially de-risked, DFS substantially completed For personal use only Elementos has confirmed all the key data for the project, with engineering of key elements 01 Mineral Resource defined - 95% Measure & Indicated categories markedly matured, significantly de-risking the 02 XRT Ore sortin

  16. Slide 16: Modern and responsible mine design

    Modern and responsible mine design For personal use only Elementos has designed a simple, compact and modern open-pit mining and processing operation design for efficiency and to minimise total project disturbance footprints and avoid sensitive habitats. 16

  17. Slide 17: Oropesa has government support

    Oropesa has government support For personal use only On 9 March 2022, the Junta de Andalucia Approvals Update (Andalucían Government) publicly On 20 June - MESPA received correspondence We are now confident following these meetings, announced high profile support for the from the local department co

  18. Slide 18: Cleveland Tin Project

    Cleveland Tin Project 18 Tasmania Tin & copper JORC Resources1 Indicated Inferred Total • Cleveland Tin Project (100%-owned) located in mineral rich north-west Tasmania. 6.23Mt 1.24Mt 7.47Mt Burnie 0.75% Sn | 0.30% Cu 0.76% Sn | 0.28% Cu 0.75% Sn | 0.30% Cu For personal use only 1 All resources calc

  19. Slide 19: Cleveland Tin Project

    Cleveland Tin Project Tin, Copper and Tungsten CLEVELAND – Operational History Development & Mineralisation For personal use only • Operated as an underground mine for 27years in two phases in 1900s: • 9-years: through WW1: 1908 – 1917; and Cleveland historical • 18-years: 1968 – 1986 (by Aberfoyle

  20. Slide 20: Focussed and experienced leadership

    Focussed and experienced leadership For personal use only Our team has extensive experience in the mining and resources sector, including project acquisition, development and construction. Andy Greig Joe David Calvin Treacy Corey Nolan Non-Exec Chairman Managing Director Non-Exec Director Non-Exec D

  21. Slide 21: Corporate overview

    Corporate overview Shareholder distribution (October 2023) For personal use only Share price Market capitalisation $A0.12c A$23.4m 1 Nov 2023 01 Nov 2023 52 week high $0.42, low $0.10 DIRECTORS, 14.6% JM FINANCIAL, 7.4% Shares on issue Cash 194.7m A$2.2m MCCUSKER HOLDINGS, 5.2% 12 Sept 2023 30 Sep 2

  22. Slide 22: Disclaimer

    Disclaimer Forward-looking statements Competent Person Statement For personal use only This document may contain certain forward-looking statements. Such statements are only predictions, based on certain The information in the report to which this statement is attached that relates to mining and the

  23. Slide 23: Get in touch

    Get in touch Joe David For personal use only Elementos Limited Level 7, 167 Eagle Street Managing Director Brisbane Queensland 4000 +61 (0)7 2111 1110 Phone: +61 7 3212 6299 jd@elementos.com.au elementos.com.au

Elementos — IMARC 2023 on 6ix