New Age Metals Inc · TSXV:NAM
New Age Metals — Investor Presentation (May 2017)
9 slides from New Age Metals's investor presentation, May 2017
Slide 1: Corporate Profile
TSXV: NAM OTCQB: PAWEF FSE: P7J.F Corporate Profile Spring, 2017 AT THE FOREFRONT OF PGM AND Li EXPLORATION
Slide 2: NAM Management and Technical Team/Overview
NAM Management and Technical Team/Overview Trevor Richardson, President & COO Harry Barr, Chairman & CEO Colin Bird, Director Robert Guanzon, CFO Mike Neumann, Director Carey Galeschuk, Principal Consulting Geologist John Londry, Director Charlotte Brown, Corporate Secretary • New Age Metals Inc. (N
Slide 3: Overview
Overview • NAM owns 100% of the River Valley PGM Project, the Largest Undeveloped Primary PGM Resource in Canada, with 2.5 Moz PGM, in Measured plus Indicated mineral resources at River Valley, Ontario Ontario • Resources Near-Surface and Road Accessible; Gogama Power and Rail infrastructure nearby
Slide 4: River Valley Project: New Discovery – Pine Zone
River Valley Project: New Discovery – Pine Zone In 2015-16 seven drill holes at Pine Zone intersected Higher- Grade PGM mineralization: • Hole 2015-DN002 intersected 9 m grading 3.909 g/t Pd-Pt, 0.121 g/t Au, 0.264% Cu from 145 m downhole • Hole 2015-DN001 intersected 16 m grading 2.054 g/t Pd- Pt,
Slide 5: Additional Footwall PGM Targets and NAMS Extension
Additional Footwall PGM Targets and NAMS Extension • Pine Zone: The most advanced of 9priority structural PGM targets based on geophysics in the north part of the River Valley deposit: open to the east along strike • Target T3: large overlapping geological & surface IP chargeability anomaly in footw
Slide 6: Mineral Resource Estimate
Mineral Resource Estimate NI43-101 Compliant Mineral Resource Estimation at Cut-Off Grade of 0.8 gpt PdEq – Effective May 1, 20 Notes Pd Pt Rh Au Ag Cu Ni Co PdEq • Mineral resources are not mineral reserves and do Class TONNES not have demonstrated economic viability. There is (g/t) (g/t) (g/t) (g/
Slide 7: Winnipeg River Pegmatite Field in SE Manitoba
Winnipeg River Pegmatite Field in SE Manitoba Winnipeg River Pegmatite Field in SE Manitoba Hudson Bay Lithium Two Project Manitoba Ontario Winnipeg River Pegmatite Field Lithman North Winnipeg River Pegmatite Field Winnipeg Tanco Lithman West Tanco Mine Site • The Winnipeg River-Cat Lake Pegmatite
Slide 8: Pegmatites in Manitoba
Pegmatites in Manitoba Lithium Two Project Drill Ready Lithium Targets • Field work in 2016 outlined and sampled the Eagle and FD5 Pegmatite • Both pegmatites contained significant surface Lithium One Project spodumene • Field work in 2016 outlined • Best surface sampling from the Eagle and sampled
Slide 9: Investor Relations
Investor Relations Rockport Office: 613-659-2773 paulp@newagemetals.com hbarr@newagemetals.com trichardson@newagemetals.com info@newagemetals.com For more details, please visit: www.newagemetals.com Green Metals for the Future Palladium Platinum Lithium Disclaimers Safe Harbour Statement This report