  1. Slide 1: Thunder Mountain Gold, Inc. 2017 Annual Shareholder Meeting

    Thunder Mountain Gold, Inc. 2017 Annual Shareholder Meeting

  2. Slide 2: Thunder Mountain Gold, Inc. 2017 Annual Shareholder Meeting

    Thunder Mountain Gold, Inc. 2017 Annual Shareholder Meeting Thunder Mountain Gold, Inc. U.S. -OTCQB: THMG Mm 11770 W. President Dr., Ste. F Canada — TSX-V: THM Boise, Idaho 83713

  3. Slide 3: Thunder Mountain Gold Inc.

    Thunder Mountain Gold Inc. Thunder Mountain Gold is a 80-year old U.S. — based publicly traded exploration company, and historic gold producer, focused on discovering and defining the best high-grade, high-quality precious and base metal resources in the western United States.

  4. Slide 4: Thunder Mountain Gold Inc

    Thunder Mountain Gold Inc Seasoned Board and Management - >150 years of mining experience Publicly traded in U.S.(THMG) and Canada (THM.V) 55 million shares issued and outstanding; 4.9 million options; No Warrants Market Cap - $5 million — Less than $0.20 per silver equivalent ounce at South Mountai

  5. Slide 5: Board of Directors and Management

    Board of Directors and Management O) Eric T. Jones — President and CEO, Director O) Jim Collord— Vice President and COO, Director O) Joseph Baird — Corporate Counsel, Director O) Paul Beckman — Independent Director * O) Doug Glaspey — Independent Director, Audit Committee Member O) Larry Kornze, B.S

  6. Slide 6: South Mountain Laxey Adit

    South Mountain Laxey Adit Williams Creek 7801’ Exploration Camp Drainage

  7. Slide 7: South Mountain Project

    South Mountain Project Located in southern Owyhee County, Idaho Approximately 70 air miles SW of Boise, Idaho and approximately 24 miles SE of Jordan Valley, Oregon Project is on private and patented land, and permitted : i 3 OVER MOUNTAIN 3 PROJECT THUNDER MOUNTAIN — RESOURCES: SOUTH MOUNTAIN PROJE

  8. Slide 8: Property Details

    Property Details QO) 17 patented claims equaling 326 acres QO) 21 unpatented claims equaling 290 acres 545 acres of private leased land 360 acres of private land adjacent to the mine property purchased in 2013 for mill and concentrate transfer facility Project is permitted for development (<< W\S xf

  9. Slide 9: South Mountain District History

    V & out IVieUNTaIn:DistrictiAistory | 3 %& 4 hates yl ~~, 3 14S Tce re a ef : 1868: Gold and Silver Quartz Veins Discovered 1874: South Mountain Consolidated Mining and Smelting 1875: Bullion City had 3,000 Residents 1930’s: Development of the Laxey and Sonneman Levels 1940’s: Anaconda Direct Ships

  10. Slide 10: South Mountain Project

    South Mountain Project 3-D Model 22 leapfrog

  11. Slide 11: South Mountain Project Overview

    South Mountain Project Overview High-grade polymetallic — historic underground mine zinc, silver, copper, gold, and lead carbonate hosted replacement — Gross Value of $600 per ton at current metal prices. The resource remains open at depth. 43-101 compliant resource (updated) with tremendous explora

  12. Slide 12: South Mountain Project (Cont.)

    South Mountain Project (Cont.) e Initial Metallurgical testing shows high recoveries by conventional differential floatation milling e Low estimated capital cost of $45 million to get into production. e Project carries a great deal of support from the locals and the State of Idaho

  13. Slide 13: Long Section Through South Mountain Mine

    Long Section Through South Mountain Mine Showing Levels and Ore Zones Surface Drilling: 4,777 Feet Underground Drilling: 10,237 Feet Underground Workings: 8,000 Feet Laxey Level Sonneman \ el #7 1-544 Level LO-7 Drill Intercept (RVCe Hole - 2010) DMEA 2 Drill Intercept (Core Hole - 2009) LO-6 Drill

  14. Slide 14: South Mountain Mine Capital Expenditures by Owner

    South Mountain Mine Capital Expenditures by Owner Capital Expenditures to Date: > November 2016 — THMG negotiated the $12M below into a NRR; Paid at 5% NPI on South Mountain; capped @ $5M; includes $500K in equipment. No money down. $5K / yr. mtce. >» Approximately $12M expended from August 2012 - P

  15. Slide 15: South Mountain Project: Intrusive Breccia Au Target

    South Mountain Project: Intrusive Breccia Au Target Intrusive Breccia Zone (5,000’x 1,500’): 0.49 ppm — 5.8 ppm Au Rock chips 1,000’x 800’ Orientation Soil Anomaly (0.31 ppm Au) i ow " alize? J Rs laxey marble \2 me ¢ ; xD xf al preferred skarn host B' ee mixed metaseds: schist, quartzite, carbonate

  16. Slide 16: Rib Sample results on the DMEA

    O Rib Sample results on the DMEA 2 - 90 feet of: O 21.9% Zine O 134.94 g/t Silver Q 4.17 g/t Gold O 0.38% Copper O 0.51% Lead ‘ =e [arom sa tm THUNDER MOUNTAIN GOLD

  17. Slide 17: South Mountain Resource

    Q 2012-2014 pre- development work confirms that the direct ship ore grades reported by Anaconda continue to trend into the DMEA zone Current internal mine/resource model is a base case; Tonnage and grade expected to increase substantially once the Texas zone is drilled and developed Thunder Mountain

  18. Slide 18: South Mountain Mine Project Metrics

    South Mountain Mine Project Metrics Anticipated Project Metrics after Feasibility Study: e 2M ton polymetallic resource potential (current modeling by third party Company), with potential for 500 tod startup to 1,000 tod underground mining operation with a associated mill e 150 direct Mining employe

  19. Slide 19: South Mountain Mine Path Forward

    South Mountain Mine Path Forward > Company has engaged Headwaters MB for Financial Consultant >» Complete Economic Analysis >» SRK Consulting » Additional Drilling » Additional Met Testing > Complete Mill Design, and >» Develop Detailed Mine Plan and Schedule >» 7 months to Complete Economic Analysi

  20. Slide 20: South Mountain Mine Development Plan - SRK

    South Mountain Mine Development Plan - SRK Pre — Construction Development ($5.0M) — Est. 7 - 12 Months to Complete Mine Construction & Development ($40.0 - $45.0M) Est. 18 $1.185M - Drift Rehabilitation Months to Complete 355,000 - Metallurgical testin $ a 2 Completion of mine & mill engineering $1.

  21. Slide 21: Zinc: A Metal with Growing Demand

    ZINC A METAL WITH GROWING DEMAND Demand is Exceeding Supply AND A LOOMING SUPPLY CRISIS China Zinc Demand 2014 Infrastructure 30% Galvanized Steel as % of Crude Production +21. million tonnes of zinc a China 6% D0 OL 02 GS 04 05 06 G7 OB O9 10 11 12 13 14 100% OF CARS PRODUCED IN NORTH AMERICA NEED

  22. Slide 22: Zinc Supply Projected to Decline

    Zinc Supply Projected to Decline and we are Facing a Looming Shortage WOO D MAC K E N Z | pearenites mine production GE possible mine life extensions base case production capacity Kt Zn 22000 17000 12000 7000 2000

  23. Slide 23: Zinc Market Outlook

    Zinc Market Outlook Zinc Supply/Demand Balance O Zinc was the best performing LME metal in 2016 and price outlook remains strong for 2013 2014-2015 _—-2016E_—-2017E_—2018E_—-2019E_— 2020 Supply "000 tonne: 13,018 13,498 13,896 15,873 14,393 14,980 15,404 15,493 foreseeable future DLA Sales 000 tonne

  24. Slide 24: South Mountain Mine Support

    South Mountain Mine Support daho Governor ~ Butch Otter studying an ore sample with Thunder Mountain __ Gold President/CEO Eric Jones

  25. Slide 25: South Mountain Mine Support - Letter of Support

    yuth Mountain Mine Support — Letter of Support State of Ida dune 22, 2015 ‘On behaif of the State of Idaho, | would like to extend my support for Thunder ‘Mountain Gold's South Mountain Mine Project. ‘Thunder Mountain Gold's long tradition of mining and environmental stewardship in Idaho is an asset

  26. Slide 26: Slide 26

  27. Slide 27: Slide 27

  28. Slide 28: ~ © i S oa > © x ©. eT iS = © =

    ~ © i S oa > © x ©. eT iS 3 = © = @)

  29. Slide 29: Texas Shaft Collar

    of Texas Shaft Colar

  30. Slide 30: Slide 30

  31. Slide 31: Sonneman Portal

    : (ple Se ~_Sonnéman Portal Wo

  32. Slide 32: Sonneman Portal

    Sonneman Portal — 1

  33. Slide 33: Sonneman Drift Rehab

    onnemari Drift Rehab 3 r & i