Orica Limited · ASX:ORI
Orica — Corporate Update (August 2013)
29 slides from Orica's corporate update, Aug 26, 2013
Slide 1: Community Reference Group Meeting
Community Reference Group Meeting Orica Kooragang Island 26 August 2013 © Orica Limited Group CRG Meeting 26 August 2013
Slide 2: Contents
Contents Welcome and introduction 5.00pm Previous meeting notes 5.05pm Site status 5.10pm Presentation topics 5.15pm Briefing paper 6.00pm Other business 6.20pm Actions 6.45pm Meeting close 7.00pm CONFIDENTIAL: Information contained in this document is strictly confidential. 2
Slide 3: Welcome and introduction
Welcome and introduction • Orica – Greg Holmes, General Manager – Sherree Woodroffe, Sustainability Manager – Nigel Convey, Business Manager South East Australia – Paul Hastie, Safety Lead – Antony Taylor, Major Projects Project Statutory Manager – Kane Millard, Environmental Advisor – Nicole Masson
Slide 4: Apologies
Apologies • Fiona Britten, Stockton resident and Portside Local • Tracey Frazer, Stockton Public School • Jak Haines, Stockton resident • Mark Howe, Stockton resident • Kane Millard, Orica • John Nella, CAKA and SCAG • Richard Sheehan, Orica • Michele Sutherland, Stockton RSL 4
Slide 5: Previous meeting notes
Previous meeting notes • Sent 26 July 2013 5
Slide 6: Site status
Site status • Emergency Management Plan drills x 2 • One actual activation of the Emergency Management Plan • Plant operating availability • EBA Negotiations continue • Hunter Valley demand for product ex KI 6
Slide 7: CRG nominated presentation topic: History of Orica KI
CRG nominated presentation topic History of Orica KI Sherree Woodroffe – Safety, Health, Environment and Community Manager 7
Slide 8: Orica Kooragang Island History
Orica Kooragang Island History • Construction at the Eastern Nitrogen site commenced in 1967 8
Slide 9: Orica Kooragang Island History
Orica Kooragang Island History • No. 1 Nitric Acid Plant and No. 1 Ammonium Nitrate Plant commenced operation in February 1969 using imported ammonia • Fertiliser grade (higher density) ammonium nitrate was produced for use in agriculture • Ammonia Plant commenced operation in November 1969, with a
Slide 10: Orica Kooragang Island History
Orica Kooragang Island History • No. 1 Ammonium Nitrate Plant upgraded in 1972 to enable production of both industrial grade and fertiliser grade ammonium nitrate • No. 1 Nitric Acid Plant NOx Abater installed in 1981 to reduce NOx emissions • No. 2 Nitric Acid Plant and No. 2 Ammonium Nitrate Plant
Slide 11: CRG nominated presentation topic: Orica in the Hunter Valley (and beyond)
CRG nominated presentation topic Orica in the Hunter Valley (and beyond) Nigel Convey – SER Business Manager 11
Slide 12: CRG nominated presentation topic: Safety instrumented systems
CRG nominated presentation topic Safety instrumented systems Paul Hastie – Safety Lead 12
Slide 13: Contents
Contents What is a SIS (Safety Instrumented System)? What is SIL (Safety Integrity Level)? Layers of Protection KI Site Safety Instrumented Systems 13
Slide 14: What is a SIS (Safety Instrumented System)?
What is a SIS (Safety Instrumented System)? A Safety Instrumented System (SIS) is an Instrumented Control System that detects process conditions in the plant which are outside normal operating conditions and automatically returns the process to a safe state 14
Slide 15: What is (SIL) – Safety Integrity Level?
What is (SIL) – Safety Integrity Level? Safety Instrumented Systems (SIS) are designed at different Safety Integrity Levels (SIL) based on the risk Safety posed by the process hazard Integrity Level The higher the Safety Integrity Level (SIL) rating, the SIL 4 higher the number of independent compon
Slide 16: Layers of Protection
Layers of Protection Emergency M Response Emergency response layer I T I Passive protection layer Bund G A T I Relief Valve Active protection layer O N Safety Shut Down Instrumented Isolated protection layer System Action P Trip level alarm R E Operator Varying Process V Process control layer E Inte
Slide 17: KI Site Safety Instrumented Systems
KI Site Safety Instrumented Systems KI site has been through a process to: • review process related hazards and the associated Safety Instrumented Systems (SIS) • undertake Layer of Protection Analysis (LOPA) and Safety Integrity Level (SIL) analysis on critical instrumentation • review maintenance
Slide 18: Briefing Paper
Briefing Paper 18
Slide 19: Other business
Other business 19
Slide 20: Site projects
Site projects 1. Recycled Water project 2. Ammonia Management Improvement program of work Slide
Slide 21: Recycle Water Project Overview
Recycle Water Project Overview Recycled Water Project • Associated with the expansion project approval, Orica committed to investigating the feasibility of using recycled water in preference to potable water (Condition 37). • 9 ML/Day of recycled water usage opportunities have been identified. • The
Slide 22: Ammonia Management Improvement (AMI) objectives
Ammonia Management Improvement (AMI) objectives Program of works with the objective of reducing ammonia related risks on KI • Multi-layer risk-based prioritisation approach that will reduce the site’s ammonia based risk profile through: 1. Elimination / Simplification of ammonia handling systems 2.
Slide 23: Ammonia Management Improvement (AMI) Overview
Ammonia Management Improvement (AMI) Overview 1. Shipping 2. Upgraded 3. Storage vent/reliefs arm pumping & captured via existing upgraded compression scrubber + flare. systems Instruments upgraded 10. Existing Nitrates Scrubber NH3 cold accepting routine storage venting 11. Nitrates Flare accepting
Slide 24: Questions
Questions Slide 24
Slide 25: Arsenic project update
Arsenic project update & orIc
Slide 26: Ammonia measurements at Stockton Air Quality Monitoring Station
Ammonia measurements at Stockton Air Quality Monitoring Station (Keith Craig) 26
Slide 27: Actions from previous meetings
Actions from previous meetings 27
Slide 28: Actions from previous meetings
Actions from previous meetings ACTION STATUS Orica to prepare a targets This will be available in and timeframe document coming months A Gilligan to invite DEMO to Ongoing CRG meeting when sub plan is close to finalisation Orica to present via email the Ongoing CVs of two possible technical experts
Slide 29: Actions from previous meetings
Actions from previous meetings ACTION STATUS R Banyard to provide Ongoing information on community complaints which were reported to have been logged with Orica, if available, to K Cooper to enable investigation of the issue November CRG meeting It has been scheduled for should discuss the arsenic d