Prosafe — Q3 2017 Earnings Presentation
29 slides from Prosafe's earnings presentation, Nov 2, 2017

Slide 1: Q3 2017 results and market update
2 November 2017 Q3 2017 results and market update

Slide 2: Disclaimer
Disclaimer All statements in this presentation other than statements of historical fact are forward-looking statements, which are subject to a number of risks, uncertainties, and assumptions that are difficult to predict and are based upon assumptions as to future events that may not prove accurate.

Slide 3: Agenda
Agenda Highlights Financial results and guidance Plan the work – work the plan Status and outlook Summary 3

Slide 4: Highlights
Highlights Good operating performance Utilisation of 38.9 per cent in the quarter (52%) Impairment of goodwill, older vessels and Safe Scandinavia Safe Boreas commenced firm 13-month contract early-August for Statoil at Mariner in the UK Delivering on cost and capex reductions. Focus on co

Slide 5: Agenda
Agenda Highlights Financial results and guidance Plan the work – work the plan Status and outlook Summary 5

Slide 6: Income statement
Income statement (Unaudited figures in USD million) Q3 17 Q2 17 Q3 16 9M 17 9M 16 2016 Operating revenues 68.9 61.7 129.8 206.3 348.2 474.0 Operating expenses (41.3) (37.3) (61.5) (123.5) (173.0) (220.8) EBITDA 27.6 24.4 68.3 82.8 175.2 253.2 Depreciation (34.8) (33.8) (29.1) (102.0) (81.6) (115.7)

Slide 7: Balance sheet
Balance sheet (Unaudited figures in USD million) 30.09.17 30.06.17 31.12.16 30.09.16 Goodwill 0.0 226.7 226.7 226.7 Vessels 1 555.0 1 967.0 2 029.3 1 887.3 New builds 124.9 124.9 122.2 318.8 Other non-current assets 11.2 12.3 13.9 4.1 Total non-current assets 1 691.1 2 330.9 2 392.1 2 436.9 Cash and

Slide 8: Impairment of goodwill, older vessels and Scandinavia
Impairment of goodwill, older vessels and Scandinavia Due to an anticipated deferred improvement of market conditions, an impairment charge of USD 609 million has been made in Q3 2017 • USD 226.7 million relates to goodwill which has been fully impaired. The goodwill was related to the acquisition

Slide 9: EBITDA 2017 and capex guidance 2017
EBITDA 2017 and capex guidance 2017 Guidance 2017 EBITDA Ca. MUSD 120 Average capex per year Ca. MUSD 10-15 1) 1) Incl. SPS for the Safe Caledonia and OTG 13/14 works on Boreas in 2017 and without any new build deliveries 9

Slide 10: Significant cost and capex reductions achieved
Significant cost and capex reductions achieved 2011-2015 annual average Revised current levels levels Offshore opex1) USD 180m USD 125-140m Onshore opex USD 40m USD 21-22 m Onshore headcount reduction 50 percent achieved (in %) 1) Will be affected by activity level

Slide 11: Protecting the runway - financial and strategic flexibility
Protecting the runway - financial and strategic flexibility 250 Reduced cost and capex Cash actual Q3 2017 Cash neutral at EBITDA of approx. 200 ~ Cash neutral EBITDA level USD 100 million 150 100 50 0 11

Slide 12: Agenda
Agenda Highlights Financial results and guidance Plan the work – work the plan Status and outlook Summary 12

Slide 13: TSV Safe Scandinavia – Westcon dispute
TSV Safe Scandinavia – Westcon dispute Court proceedings commenced 22 August 2017 The yard’s budget for the work matured to approx. NOK 1.07 billion after several revisions Total cost claimed by yard approx. NOK 2.4 billion • Prosafe has already paid approx. NOK 2.1 billion • Yard has claimed

Slide 14: Fleet renewal – controlling 3 new builds at COSCO
Fleet renewal – controlling 3 new builds at COSCO Negotiations with COSCO regarding Safe Nova, Safe Vega and Safe Eurus ongoing • The standstill agreement between Prosafe and COSCO related to Safe Nova and Safe Vega has been extended until December 2017 Looking for optionality and value creation

Slide 15: Exploring various opportunities for strategic optionality
Exploring various opportunities for strategic optionality High End Mid Water Drilling Support Opportunities Further strategic opportunities at different levels: Zephyrus (‘16) Notos (‘16) Boreas (‘15) Regalia (’85/’09) Astoria (‘83/’12) Scandinavia (’84/’15) 1. Pooling/JV 2. Management 3. Acquisitio

Slide 16: Prosafe: well positioned in global niche
Prosafe: well positioned in global niche Prosafe is a leading company in a global niche Prosafe is the only listed, pure play offshore accommodation company in the world Prosafe is restructured and streamlined Market indicators: oil price up, break-even levels down, oil industry cash positiv

Slide 17: Agenda
Agenda Highlights Financial results and guidance Plan the work – work the plan Status and outlook Summary 17

Slide 18: Safe Boreas commenced contract with Statoil
Safe Boreas commenced contract with Statoil In early August, Safe Boreas commenced on a 13-month firm contract with Statoil at the Mariner installation in the UK North Sea In addition, Statoil can exercise six one-month options Total value of the firm contract is approximately USD 131.8 millio

Slide 19: TSV Safe Scandinavia - Strong performance at Oseberg
TSV Safe Scandinavia - Strong performance at Oseberg Firm contract with Statoil until end June 2018 at Oseberg East on the NCS Strong and efficient operational and technical performance • Drilling with TSV support started in March 2016 • Services provided: Drilling support, well intervention, ac

Slide 20: Safe Scandinavia – Positioning beyond 2018
Safe Scandinavia – Positioning beyond 2018 In dialogue with blue chip companies to collaborate within Plug and Abandonment (P&A) and decommissioning: • Permanent P&A • Ambition to reduce the total project time for P&A, “Making safe” / Decommissioning preparation by up to 30-50% with activities und

Slide 21: Contract portfolio
Contract portfolio Firm order book at end Q3 2017 of approx. MUSD 375 21

Slide 22: Prospects and tendering – Prosafe business intel
Prospects and tendering – Prosafe business intel Tenders and Prospects - outlook is generally three years Nine tenders ongoing for 2017 through 2019 – 2 within North Sea The prospect list with a three-year look-out remains at a relatively high level 18 prospects with high probability of going

Slide 23: North Sea: Prospects developing from 2019 onwards
North Sea: Prospects developing from 2019 onwards Age of fixed facilities in the North Sea Currently low tendering activity due to low and deferred operator spending Longer term, expect increased tendering and contracts related to support accumulating maintenance backlog and modification work at

Slide 24: Brazil: Anticipate tender activity for long term
Brazil: Anticipate tender activity for long term Petrobras technical specifications (‘GTD’) have evolved substantially since 2010 – some of the highest requirements of any operator 9 vessels of 8 owners operating in 2015 Presently 5 vessels contracted, Opportunity reducing to 1 vessel by mid-

Slide 25: Mexico expected to return to a strong market longer term
Mexico expected to return to a strong market longer term Mexico remains a major oil producer At the peak of the flotel market, around 9000 POB was in Mexico (2015) In 2017, the total capacity in Mexico is around 4000 POB Ageing infrastructure will mean an ongoing demand for maintenance Cur

Slide 26: Agenda
Agenda Highlights Financial results and guidance Plan the work – work the plan Status and outlook Summary 26

Slide 27: Summary
Summary Good operating performance Impairment of goodwill, older vessels and Safe Scandinavia Utilisation of 38.9 per cent in the quarter (52%) Safe Boreas commenced firm 13 month contract early-August Good activity indicators in Americas Delivering on cost and capex reductions. Focus on

Slide 28: Appendix
Appendix @ Prosafe

Slide 29: Operating revenue
Operating revenue (USD million) Q3 17 Q2 17 Q3 16 9M 17 9M 16 2016 Charter income 62.9 56.3 114.4 185.5 279.7 375.5 Mob/demob income 1.0 1.3 2.1 3.4 16.5 34.0 Other income 5.0 4.1 13.3 17.4 52.0 64.5 Total 68.9 61.7 129.8 206.3 348.2 474.0 29
Source: Internet Archive copy of prosafe.com
More decks from Prosafe SE
Pareto Securities Energy Conference 202616 slides · September 2026
Q2 2026 Earnings Presentation35 slides · Aug 28, 2026
Q1 2026 Earnings Presentation37 slides · Jun 1, 2026
Q4 2025 Earnings Presentation35 slides · Feb 26, 2026
Investor Presentation (January 2026)38 slides · January 2026
Q3 2025 Earnings Presentation44 slides · Nov 13, 2025