18 slides from National Fuel Gas's conference presentation, 2022
Slide 1: National Fuel Supply & Empire Pipeline Fall 2022 NGA Presentation
National Fuel Supply & Empire Pipeline Fall 2022 NGA Presentation
Slide 2: NFG Supply and Empire Overview
NFG Supply and Empire Overview
Slide 3: Gas Control Personnel
Gas Control Personnel • Tony Conte – Superintendent: Gas Control, Gas Measurement • Joe Daul – Manager: Gas Control • Brian Kiel – System Planning Engineer • Greg Langl – Regulatory Compliance Supervisor • 7 System Supervisors • 11 Gas Dispatchers • 3 Gas Dispatchers In-Training (+3 from 2021)
Slide 4: Control Room
Control Room ) National Fuel
Slide 5: NFGSC System Overview
NFGSC System Overview
Slide 6: Fall 2022 NFGSC System Overview: Weather and Throughput Statistics
Fall 2022 NFGSC System Overview Weather and Throughput Statistics • Summer Operations 4/1/22-9/30/22 • Average Degree Day 2022 5.1 • Average Degree Day 2021 5.3 • Normal Degree Day 5.4 • Throughput 4/1/22-9/30/22 215 BCF • Peak Throughput 4/19/22 1.4 BCF
Slide 7: Fall 2022 NFGSC System Overview: Storage Activities
Fall 2022 NFGSC System Overview Storage Activities • Top Gas Capacity 77.2 BCF • Starting Top Gas 4/1/22 19.4 BCF • Injected through 9/1/22 35.3 BCF • Top Gas 9/1/22 54.7 BCF
Slide 8: NFGSC Top Gas Storage Inventory (MMCF)
NFGSC Top Gas Storage Inventory (MMCF)
Slide 9: NFGSC Line X South to North
NFGSC Line X South to North Niagara East Aurora Concord Independence Tuscarora NFG Ellisburg Leidy Mercer Holbrook
Slide 12: Fall 2022 Empire System Overview: Weather and Throughput Statistics
Fall 2022 Empire System Overview Weather and Throughput Statistics • Summer Operations 4/1/22-9/30/22 • Average Degree Day 2022 5.1 • Average Degree Day 2021 5.3 • Normal Degree Day 5.4 • Throughput 4/1/21-9/30/22 115 BCF • Peak Throughput 6/29/22 680 mmcf Total 120 mmcf Power Gen
Slide 13: Empire Connector South to North
Empire Connector South to North Mendon Lysander Phoenix Chippawa Hopewell Corning Jackson
Slide 14: Empire Connector South to North
Empire Connector South to North
Slide 15: Chippawa: Delivery to TC Energy
Chippawa: Delivery to TC Energy Mendon Lysander Phoenix Chippawa Hopewell Corning Jackson
Slide 16: Chippawa: Net Delivery to TC Energy
Chippawa: Net Delivery to TC Energy
Slide 17: 2022 Completed Work
2022 Completed Work
Slide 18: 2022 NFGSC and Empire Completed Work
2022 NFGSC and Empire Completed Work NFGSC Empire • Line YM224/XS/YM50 ILIs • New Victor to Phoenix Station ILI • Significant interruption of Line X • No impact to firm services • 5 days during May & July 2022 • 3 days during August 2022 • Line K Hydrotest/Replacements • Remediated and assessed seve