National Fuel Gas Company · NYSE:NFG

National Fuel Gas — Fall 2022 NGA

18 slides from National Fuel Gas's conference presentation, 2022

  1. Slide 1: National Fuel Supply & Empire Pipeline Fall 2022 NGA Presentation

    Slide 1: National Fuel Supply & Empire Pipeline Fall 2022 NGA Presentation

    National Fuel Supply & Empire Pipeline Fall 2022 NGA Presentation

  2. Slide 2: NFG Supply and Empire Overview

    Slide 2: NFG Supply and Empire Overview

    NFG Supply and Empire Overview

  3. Slide 3: Gas Control Personnel

    Slide 3: Gas Control Personnel

    Gas Control Personnel • Tony Conte – Superintendent: Gas Control, Gas Measurement • Joe Daul – Manager: Gas Control • Brian Kiel – System Planning Engineer • Greg Langl – Regulatory Compliance Supervisor • 7 System Supervisors • 11 Gas Dispatchers • 3 Gas Dispatchers In-Training (+3 from 2021)

  4. Slide 4: Control Room

    Slide 4: Control Room

    Control Room ) National Fuel

  5. Slide 5: NFGSC System Overview

    Slide 5: NFGSC System Overview

    NFGSC System Overview

  6. Slide 6: Fall 2022 NFGSC System Overview: Weather and Throughput Statistics

    Slide 6: Fall 2022 NFGSC System Overview: Weather and Throughput Statistics

    Fall 2022 NFGSC System Overview Weather and Throughput Statistics • Summer Operations 4/1/22-9/30/22 • Average Degree Day 2022 5.1 • Average Degree Day 2021 5.3 • Normal Degree Day 5.4 • Throughput 4/1/22-9/30/22 215 BCF • Peak Throughput 4/19/22 1.4 BCF

  7. Slide 7: Fall 2022 NFGSC System Overview: Storage Activities

    Slide 7: Fall 2022 NFGSC System Overview: Storage Activities

    Fall 2022 NFGSC System Overview Storage Activities • Top Gas Capacity 77.2 BCF • Starting Top Gas 4/1/22 19.4 BCF • Injected through 9/1/22 35.3 BCF • Top Gas 9/1/22 54.7 BCF

  8. Slide 8: NFGSC Top Gas Storage Inventory (MMCF)

    Slide 8: NFGSC Top Gas Storage Inventory (MMCF)

    NFGSC Top Gas Storage Inventory (MMCF)

  9. Slide 9: NFGSC Line X South to North

    Slide 9: NFGSC Line X South to North

    NFGSC Line X South to North Niagara East Aurora Concord Independence Tuscarora NFG Ellisburg Leidy Mercer Holbrook

  10. Slide 10: NFGSC Line X South to North

    Slide 10: NFGSC Line X South to North

    a ony ~~ (e) Zz ie) Pa) a ony » =) (e) N x< (oD) Cc 5 O (7a) © LL Zz 500 400 300 200 E u S c 8 § s & 100 0 zany wean zune thew zeady wen Te0r-494 ‘Ze0z-Uel ‘Te07-090 Tz0z-A0N Ta0z-PO Te07-das Tzoz-8ny Tzoz-Inr Tzoz-une Tz0z-AeW, Te0z-dy T2071 Te0e-q24 Teor-uer ozoz-090 0z02-f0N 0z07-PO ozoz-das ozoz

  11. Slide 11: Empire System Overview

    Slide 11: Empire System Overview

    Empire System Overview

  12. Slide 12: Fall 2022 Empire System Overview: Weather and Throughput Statistics

    Slide 12: Fall 2022 Empire System Overview: Weather and Throughput Statistics

    Fall 2022 Empire System Overview Weather and Throughput Statistics • Summer Operations 4/1/22-9/30/22 • Average Degree Day 2022 5.1 • Average Degree Day 2021 5.3 • Normal Degree Day 5.4 • Throughput 4/1/21-9/30/22 115 BCF • Peak Throughput 6/29/22 680 mmcf Total 120 mmcf Power Gen

  13. Slide 13: Empire Connector South to North

    Slide 13: Empire Connector South to North

    Empire Connector South to North Mendon Lysander Phoenix Chippawa Hopewell Corning Jackson

  14. Slide 14: Empire Connector South to North

    Slide 14: Empire Connector South to North

    Empire Connector South to North

  15. Slide 15: Chippawa: Delivery to TC Energy

    Slide 15: Chippawa: Delivery to TC Energy

    Chippawa: Delivery to TC Energy Mendon Lysander Phoenix Chippawa Hopewell Corning Jackson

  16. Slide 16: Chippawa: Net Delivery to TC Energy

    Slide 16: Chippawa: Net Delivery to TC Energy

    Chippawa: Net Delivery to TC Energy

  17. Slide 17: 2022 Completed Work

    Slide 17: 2022 Completed Work

    2022 Completed Work

  18. Slide 18: 2022 NFGSC and Empire Completed Work

    Slide 18: 2022 NFGSC and Empire Completed Work

    2022 NFGSC and Empire Completed Work NFGSC Empire • Line YM224/XS/YM50 ILIs • New Victor to Phoenix Station ILI • Significant interruption of Line X • No impact to firm services • 5 days during May & July 2022 • 3 days during August 2022 • Line K Hydrotest/Replacements • Remediated and assessed seve