  1. Slide 1: Growing Responsibly: First Quarter 2025 Financial & Operating Results

    GROWING RESPONSIBLY First Quarter 2025 Financial & Operating Results TSX FM

  2. Slide 2: Cautionary Statement on Forward-Looking Information

    CAUTIONARY STATEMENT ON FORWARD-LOOKING INFORMATION Certain statements and information herein, including all statements that are not historical facts, contain forward-looking statements and forward-looking information within the meaning of applicable securities laws. The forward-looking information

  3. Slide 3: Opening Remarks

    Cobre Panamá OPENING REMARKS Tristan Pascall, CEO RESPONSIBLE GROWTH 3

  4. Slide 4: Q1 2025 Highlights

    Q1 2025 HIGHLIGHTS TOTAL COPPER PRODUCTION Recent Developments • Discontinued ICC arbitration proceedings and suspended FTA arbitration 99,703t 11% decrease from Q4 2024 due to lower • Entered into additional unmargined zero cost collars • Supplemental copper prepayment agreement for an additional $

  5. Slide 5: Sustainability Highlights from the Quarter

    SUSTAINABILITY HIGHLIGHTS FROM THE QUARTER Transforming Education with Clean Water for a Sustainable Taca Taca Project Update Empowerment of Local Cobre Conecta Future Entrepreneurs Kansanshi handed over a water Cobre Panamá has launched "Cobre reticulation system to the Kabwela Emprende," a program

  6. Slide 6: Operational Overview

    Sentinel OPERATIONAL OVERVIEW Rudi Badenhorst, COO RESPONSIBLE GROWTH 6

  7. Slide 7: Kansanshi

    KANSANSHI Q1 2025 COPPER PRODUCTION 2025 Outlook 46,544t 3% lower than Q4 2024 due to lower feed • Six-week maintenance shutdown of Kansanshi smelter planned for Q2 2025 • First production from S3 Expansion expected in H2 2025; initial feed will be grades; swap of mixed and sulphide mills sourced fr

  8. Slide 8: Trident - Sentinel

    TRIDENT - SENTINEL Q1 2025 COPPER PRODUCTION 2025 Outlook 46,361t 18% lower than Q4 2024 due to lower • 4-day full maintenance shutdown planned for Q2 2025; tailings thickener upgrades in H2 2025 grades and throughput • Initiatives to increase mill throughput, including optimizing blast fragmentatio

  9. Slide 9: Trident - Enterprise

    TRIDENT – ENTERPRISE Q1 2025 NICKEL PRODUCTION 2025 Outlook 4,649t 25% increase from Q4 2024 due to higher • 4-day full maintenance shutdown in Q2 2025 • Focus will remain on ore quality and grade control through ongoing reverse throughput, partially offset by lower grades circulation drilling • Opt

  10. Slide 10: Other Mines

    OTHER MINES Las Cruces Çayeli NI 43-101 published February 2024 Q1 2025 PRODUCTION: 2,317t Cu, and 218t Zn Continue to pursue sales process Q1 2025 C1 CASH COST1: $2.10 per lb Cu 2025 PRODUCTION GUIDANCE: 10Kt Cu, 1.5kt Zn Copper and zinc production includes production from south ore body (received

  11. Slide 11: Financial Overview

    Kansanshi Smelter FINANCIAL OVERVIEW Ryan MacWilliam, CFO RESPONSIBLE GROWTH TSX FM

  12. Slide 12: Q1 2025 Revenue and Copper C1 Cash Costs

    Q1 2025 REVENUE AND COPPER C1 CASH COSTS¹ GROSS REALIZED COPPER PRICE1 • Lower revenue quarter-over-quarter from lower copper and gold sales volumes (per lb) but partially mitigated by higher realized metal prices $4.26 Up 2% quarter-over-quarter • Higher copper C1 cash costs1 quarter-over-quarter w

  13. Slide 13: Q1 2025 EBITDA and Net Earnings

    Q1 2025 EBITDA¹ AND NET EARNINGS EBITDA¹ EBITDA¹ was $78 million lower quarter-over-quarter driven by lower revenue $377 million EBITDA¹ ($ million) ADJUSTED EPS² ($/share) Down 17% quarter-over-quarter 520 NET LOSS ATTRIBUTABLE TO 455 SHAREHOLDERS OF THE COMPANY 0.14 377 ($23) million 336 Down $122

  14. Slide 14: EBITDA Waterfall

    EBITDA¹ WATERFALL (Excluding Ravensthorpe)³ External Factors Internal Factors (+$35 million) (-$121 million) • Copper +$20m • Gold +$12m • Nickel -$3m ¹ EBITDA is a non-GAAP financial measure and realized metal prices are non-GAAP ratios, which do not have a standardized meaning under IFRS and might

  15. Slide 15: Copper C1 Cash Cost

    COPPER C1 CASH COST¹ • Higher unit cash cost in Q1 was driven by lower Sentinel production and stockpile drawdowns coupled with higher Zambian employee and maintenance costs. This was partially offset by increased by-product credits from higher gold production and prices $0.27 per lb higher cash cos

  16. Slide 16: Quarterly Net Debt Movement

    QUARTERLY NET DEBT1 MOVEMENT Net debt1 increased by $257 million during the quarter mainly due to capex, interest paid and higher receivables resulting in unfavourable working capital movements Q1 and Q4 Key Working Capital Cash Flows Q1 - $140 million outflow Payables 9 Receivables (105) Inventory

  17. Slide 17: Hedging Strategy

    HEDGING STRATEGY • Hedging strategy reducing copper price volatility, with realized hedge gains of $3 million during the quarter and $38 million since inception of the program • Approximately half of planned production and sales in 2025, and 40% for the first half of 2026 are protected from spot cop

  18. Slide 18: Consistent, Decisive Action on Balance Sheet

    CONSISTENT, DECISIVE ACTION ON BALANCE SHEET External Internal Comprehensive Refinancing: Dividend suspension • $500 million copper prepayment • $1.05 billion equity raise Ravensthorpe care & maintenance • $1.6 billion 2L bond issuance • $2.3 billion corporate facility amendment and Capital expendit

  19. Slide 19: Closing Remarks

    Reforestation Initiatives Cobre Panamá CLOSING REMARKS Tristan Pascall, CEO RESPONSIBLE GROWTH

  20. Slide 20: S3 Expansion

    S3 EXPANSION S3 Expansion Works Q1 2025 Progress Outlook • Additional concentrator capacity • Construction completion at 83% and 20% of systems handed over to • First production expected in H2 • Additional SAG and ball mill commissioning 2025 • Construction of overland • Configuration of plant contr

  21. Slide 21: S3 Expansion Milling Area

    S3 EXPANSION MILLING AREA January 2025 April 2025 21

  22. Slide 22: S3 Expansion: Primary Crusher Progress

    S3 EXPANSION Primary Crusher Progress 22

  23. Slide 23: S3 Expansion: Pebble Circuit Belts

    S3 EXPANSION Pebble Circuit Belts 23

  24. Slide 24: S3 Expansion: SAG Mill Liners

    S3 EXPANSION SAG Mill Liners 24

  25. Slide 25: S3 Expansion: SAG Mill Rotation

    S3 EXPANSION SAG Mill Rotation 25

  26. Slide 26: S3 Expansion: SAG Mill and Ball Mill

    S3 EXPANSION SAG Mill and Ball Mill 26

  27. Slide 27: S3 Expansion: Process Water Tank Filling

    S3 EXPANSION Process Water Tank Filling 27

  28. Slide 28: S3 Expansion: Raw Pond Water Fill

    S3 EXPANSION Raw Pond Water Fill 28

  29. Slide 29: S3 Expansion: Booster Station

    S3 EXPANSION Booster Station 29

  30. Slide 30: Top Priorities for 2025

    TOP PRIORITIES FOR 2025 Proactive Safe and Delivery of Resolution in Management of Productive Kansanshi S3 Panama Balance Sheet Operational Expansion and Liquidity Performance • Partnering and sale options • Financing options • Continuation of hedging strategy 30

  31. Slide 31: Upcoming Events

    UPCOMING EVENTS May 8, 2025 • ANNUAL GENERAL MEETING May 8, 2025 • ANALYST/INVESTOR DINNER (Toronto) June 19, 2025 • ANALYST/INVESTOR DINNER (London) July 23, 2025 • Q2 2025 FINANCIAL AND OPERATING RESULTS (Conference call July 24, 2025) September 22-26, 2025 • ZAMBIA MINE TOUR October 28, 2025 • Q3

  32. Slide 32: Appendix

    & FIRST QUANTUM MINERALS. APPENDIX

  33. Slide 33: 2025 Guidance Unchanged

    2025 GUIDANCE UNCHANGED PRODUCTION GUIDANCE COST AND CAPEX GUIDANCE 2025E Copper Cost Guidance ($/lb) 2025E Kansanshi 160 – 190 C11 1.85 – 2.10​ Sentinel 200 – 230 AISC1 3.05 – 3.35 Other sites 20 Copper production (K tonnes) 380 – 440 Nickel Cost Guidance ($/lb) 2025E C11 5.00 – 6.50 Kansanshi 100

  34. Slide 34: Copper Cash Cost and AISC

    COPPER CASH COST¹ AND AISC¹ Higher Thequarterly copper C1 First Quantum cash cost¹ Financial and AISC¹ (excluding Cobre Panamá) of $1.95 per lb and $2.82 per lb respectively, Policy driven by lower Sentinel production and stockpile drawdowns coupled with higher Zambian employee and maintenance costs

  35. Slide 35: Debt Maturity Profile

    DEBT MATURITY PROFILE • Prudent management of near-term maturities to maintain strategic flexibility • Opportunistic offering of Senior Notes completed in March with proceeds used to refresh RCF, ease near-term maturities via refinance of half the 2027 Notes and extend the debt profile out to 2033 •

  36. Slide 36: Financial Summary

    FINANCIAL SUMMARY The First $ millions Quantum (except Financial per share Policy numbers) Q1 2025 Q4 2024 Q3 2024 Q2 2024 Q1 2024 Sales revenues 1,190 1,256 1,279 1,231 1,036 Gross profit 331 405 456 333 156 EBITDA1,2 377 455 520 336 180 Net earnings (loss) attributable to shareholders of the Compa

  37. Slide 37: Non-GAAP EBITDA and Adjusted Earnings (Loss) Reconciliation

    NON-GAAP EBITDA AND ADJUSTED EARNINGS (LOSS) RECONCILIATION $ millions (except per share numbers) Q1 2025 Q4 2024 Q1 2024 Operating profit (loss) 215 344 20 Depreciation 159 169 157 Foreign exchange loss (gain) 1 (13) (20) Impairment expense - 2 10 Share of results of joint venture - (12) 1 Restruct

  38. Slide 38: Non-GAAP Measures Reconciliation C1 and AISC

    NON-GAAP MEASURES RECONCILIATION C12 AND AISC2 $ millions Q1 2025 Q4 2024 Q1 2024 Cost of sales¹ (859) (851) (880) Depreciation 159 169 157 By-product credits 135 124 73 Royalties 86 92 62 Treatment and refining charges (17) (28) (25) Freight costs 3 - (15) Finished goods (22) 18 72 Other4 70 43 55

  39. Slide 39: EBITDA Sensitivity

    EBITDA¹ SENSITIVITY The First Quantum Financial Policy Impact on March 2025 Impact on Actual Hedge² gain / QTD EBITDA¹ March 2025 price/rate (loss) on Assumption 10% QTD EBITDA¹ March 2025 March QTD unfavourable after hedge QTD EBITDA change in impact price/rate Copper $4.24/lb $90 million $3 millio

  40. Slide 40: Kansanshi, Including S3 Expansion

    KANSANSHI, INCLUDING S3 EXPANSION Ownership Mine Type Processing Rate S3 Expansion 80% First Quantum Open Pit Adjacent 1.38 Mtpa S3 25 Mtpa Expansion smelter 20% ZCCM-IH Vein deposit, mixed First production H2 2025 27 Mtpa circuit (oxide, supergene and oxide Smelter expansion to 1.6 Mtpa mixed, sulp

  41. Slide 41: Kansanshi Pit Development

    KANSANSHI PIT DEVELOPMENT Source: Kansanshi 43-101 Technical Report July 2024 41

  42. Slide 42: Trident (Sentinel & Enterprise)

    TRIDENT (SENTINEL & ENTERPRISE) Ownership Mine Type Sentinel Processing Enterprise Processing 100% First Quantum Open Pit 62 Mtpa Sulphide circuit 4 Mtpa Sulphide circuit Sentinel: Copper Enterprise: Nickel SENTINEL & ENTERPRISE P&P Reserves M&I Resources Inferred Resources Sentinel: 599.7 Mt Sentin

  43. Slide 43: Sentinel Pit Development

    SENTINEL PIT DEVELOPMENT Source: Trident 43-101 Technical Report March 2020 43

  44. Slide 44: Cobre Panamá, Including CP100 Expansion

    COBRE PANAMÁ, INCLUDING CP100 EXPANSION Ownership Mine Type Processing Rate CP100 Expansion 90% First Quantum Open Pit 85 Mtpa Sulphide circuit Expansion to 100 Mtpa 10% KOMIR Cu-Au-Ag-Mo Porphyry • Preservation and Safe Management (“P&SM”) since November 2023 • P&SM costs ~$13 million per month in

  45. Slide 45: Las Cruces Underground Project

    LAS CRUCES UNDERGROUND PROJECT • Benefits from existing team, workforce and Las Cruces Underground Resource Classification infrastructure MINERAL RESOURCE STATEMENT AS OF SEPTEMBER 30, 2023 • Environmental permits received in 2020; Mine exploitation permit received in 2021; Water Tonnes CuEq Ag Mate

  46. Slide 46: Taca Taca

    TACA TACA 275,000 Low 32 Years US$3.6 Billion Tonnes of Cu C1 Cash Cost1 Mine Life Capital Per Year (Peak) Investment • 50 - 200 Megawatts of Renewable Energy • Primary ESIA under evaluation by the Secretariat of Mining of Salta Province. Independent evaluation from SEGEMAR (Argentinian Geological a

  47. Slide 47: La Granja

    LA GRANJA La Granja is one of the largest undeveloped copper resources in the world, with potential to support a multi-decade open-pit operation • First Quantum is the operator with a 55% interest • Large copper project in northern Peru • Partnership with Rio Tinto, acquired in August • Located in t

  48. Slide 48: Haquira Overview

    HAQUIRA OVERVIEW • Large scale porphyry copper project in Apurímac, Southern Peru • Acquired in December 2010 • One of the world’s major undeveloped copper deposits • M&I resource of 3.7 million tonnes of contained copper equivalent plus an inferred resource of 2.4 million tonnes of copper equivalen

  49. Slide 49: Contact: info@fqml.com

    info@fqml.com | 416-361-6400 | 1-888-688-6577 TSX FM | fqml.com