  1. Slide 1: Overview of Expert Panel Activities

    OVERVIEW OF EXPERT PANEL ACTIVITIES October 6, 2011

  2. Slide 2: Expert Panel Overview

    Expert Panel Overview 2 Member introductions † Dr. Bob Gearheart, PE, Humboldt State University † Jon Jones, PE, Wright Water Engineers † Dr. Michael Josselyn, WRA Consultants † Dr. Robert Pitt, PE, University of Alabama † Dr. Michael Stenstrom, PE, Univ. California, Los Angeles

  3. Slide 3: Presentation Outline

    Presentation Outline 3 July ISRA/BMP Annual Report September BMP Plan Addendum Construction Activities NPDES Compliance Update

  4. Slide 4: July ISRA/BMP Annual Report

    July ISRA/BMP Annual Report 4 Provided a review of 2010/2011 monitoring data Developed statistical methodology to rank the sites based on threshold comparisons while accounting for the number of usable data available at each location New BMPs recommended for high priority locations Process will be r

  5. Slide 5: September BMP Plan Addendum

    September BMP Plan Addendum 5 Concepts developed for new recommended BMPs † LOX (NASA): Erosion controls and slope protection. † ELV Area (NASA): Channel restoration, detention, and media filtration. † Helipad (NASA): Asphalt removal, erosion control, and active re-vegetation. † Area 1 Landfill: New

  6. Slide 6: New BMP Recommendation Locations

    New BMP Recommendation Locations 6 6 HELIPAD LOX ELV AREA 1 LANDFILL (BMPs under consideration) 6

  7. Slide 7: Construction Activities

    Construction Activities 7 ISRA Activities B1 Area BMPs LOX BMPs Lower Lot BMPs Asphalt Removal

  8. Slide 8: ISRA Activities Update

    ISRA Activities Update 8 Watershed 008 Summary: 2009: 10 areas, total volume 5,200 cubic yards (cy) Watershed 009 Summary: 2009: 2 areas, 180 cy 2010: 11 areas, 7,500 cy 2011: 7 areas (planned), ~7,000 cy 2012+: 11 areas (planned), ~9,000 cy Erosion controls and/or containerized plants installed at

  9. Slide 9: B1 Culvert Modification

    B1 Culvert Modification • Treat runoff from 4.4 acres including RFI/ISRA area • Construction near complete 9

  10. Slide 10: B1 Sediment Basin

    B1 Sediment Basin • Treat runoff from ~2 acres including RFI & ISRA areas • Construction near complete 10

  11. Slide 11: Soil Stockpile Biofilter

    Soil Stockpile Biofilter 11 Treat runoff from 5 acre paved lot where soil stockpiling activities occur Treat low flows from larger upstream drainage area Design complete, construction planned to begin once permits acquired

  12. Slide 12: View south onto the lower lot from Sage Ranch property

    MJ View south onto the lower lot from Sage Ranch property. Monument along fenceline. = = Sediment Basin ta. Se Fe = : si? Fence marks the ; ies yw property line between SSFL and Sage Ranch.

  13. Slide 13: LOX BMP

    LOX BMP Location of proposed slope drain Approximate sheet flow direction Location of proposed berm Geocell areas Sandbag berm (planned) Slope drain 13

  14. Slide 14: 2011 Asphalt Removal

    2011 Asphalt Removal 14 Asphalt removal is expected to reduce runoff volumes and contaminant loads 1.5 acres near Building 324 1.8 acres near lower parking lot Additional building and pavement areas to be demolished in 2012 and beyond

  15. Slide 15: NPDES Compliance Update

    NPDES Compliance Update 15 Positive results in 2010/2011 † Just one exceedance at Outfall 008 (lead) † Three exceedances at Outfall 009 (lead, dioxin [twice]) 100% compliance is challenging due to background sources and/or natural variability.

  16. Slide 16: NPDES Exceedances: Total Lead

    NPDES Exceedances Total Lead 50% 45% 11/25 Percent of samples above current Permit limit 40% 35% 30% 13/45 25% 20% 15% 1/6 10% 5% 1/13 0% Prior to 2010-2011 2010-2011 Prior to 2010-2011 2010-2011 Outfall 008 Outfall 009

  17. Slide 17: NPDES Exceedances: Dioxin

    NPDES Exceedances Dioxin (TCDD TEQ [no DNQ])* 50% *Based on current NPDES reporting 45% procedures for dioxins Percent of samples above current Permit limit 40% 35% 30% 15/45 25% 20% 15% 2/13 0% (0 of 6) samples 10% exceeded the dioxin 5% limit at Outfall 008 1/25 during 2010-2011 0% Prior to 2010-2

  18. Slide 18: Bus Tour

    Legend 4 NPDES Outfall © Drive Point C Stop Point Road SSFL Property Boundary L_] Administrative Area Boundary Watershed Boundary oF Nerme: ereseus BIOS PURE RSE OE ALI MOAT Dire envecd WOE AEN Peep a.en Tce baz __AREAIV \< (Boeing, 90-dcres “(leased to DOE) 1. (STOP) B1 Area | 2. Lower Parking Lot

  19. Slide 19: Thank You

    THANK YOU