Galiano Gold, Inc. · TSX:GAU
Galiano Gold — Q2 2025 Earnings Presentation
24 slides from Galiano Gold's earnings presentation, Aug 14, 2025
Slide 1: Q2 2025 Financial & Operating Results
Q2 2025 Financial & Operating Results Aug 14, 2025 © Copyright 2025 Galiano Gold. All rights reserved.
Slide 2: Forward Looking Information & Cautionary Statements
Forward Looking Information & Cautionary Statements Certain statements and information contained in this presentation constitute “forward-looking statements” within the meaning of applicable U.S. securities laws and “forward-looking information” within the meaning of applicable Canadian securities l
Slide 3: Non-IFRS Measures
Non-IFRS Measures Non-IFRS Performance Measures The Company has included certain non-IFRS performance measures in this presentation. These non-IFRS performance measures do not have any standardized meaning and therefore may not be comparable to similar measures presented by other issuers. Accordin
Slide 4: Participating Management
Participating Management Matt Badylak Matt Freeman President & Chief Chief Financial Executive Officer Officer Michael Cardinaels Chris Pettman Chief Operating Vice President Officer Exploration 4
Slide 5: Q2 Summary: Positive Momentum
Q2 Summary: Positive Momentum Metric Q2 2025 Q1 2025 Change Lost-time injuries Nil 2 -100% Total recordable injuries Nil 3 -100% Gold produced (oz) 30,350 20,734 +46% Avg realized gold price $3,317 $2,833 +17% ($/oz) Revenue ($m) $97.3 $76.6 +27% Cash flow from $35.8 $25.9 +38% operations ($m) Cash
Slide 6: Q2 Operations Overview
Q2 Operations Overview Health & Safety 2025 ACTUAL TOTAL TONNES No lost-time injuries (“LTI”) nor total recordable injuries (inclusive of 12 LTIs) (“TRI”). 10 12‐month rolling LTI and TRI frequency rates of 0.42 and 0.97 per 8 Million Tonnes million hours worked. 6 4 Abore 2 0.8 Mt ore mined (
Slide 7: Q2 Processing Update
Q2 Processing Update Additional tonnes processed and increased plant recovery contributed to an improvement in gold production quarter-on- quarter Metric Unit Q2 2025 Q1 2025 Tonnes treated Mt 1.2 1.1 Mill head grade g/t Au 0.8 0.8 Recovery % 89 87 Gold produced oz Au 30,350 20,734 Gold sold oz Au
Slide 8: Projects Update
Projects Update Secondary Crusher: Objective to maintain plant throughput at design capacity of 5.8 Mt per annum when treating harder ore. Construction completed on budget and commissioned in late July. Modifications required to downstream equipment ongoing in August. Secondary Crusher Feed Se
Slide 9: Q2 2025 Consolidated Financial Metrics
Q2 2025 Consolidated Financial Metrics Q2 2025 Results Revenue Income from Mine Operations $97.3 M $37.2 M Avg. Realized Gold Price Adjusted EBITDA(1) $3,317/oz Au $39.9 M AISC(1) Net Income/Share(1) $2,251/oz $0.07 Cash Flow From Operations Free Cash Flow(1) $35.8 M $5.6 M 9 1. Non-IFRS measure
Slide 10: Costs In Line
Costs In Line Mining Abore & Esaase mining cost = $3.59/t in line with plan Ore transportation costs = $4.49/t, 1.1Mt ore trucked from Abore and Esaase, tracking below budget due to less reliance on Esaase ore Processing Processing cost = $12.89/t, 10% reduction from Q1 2025 due to higher thro
Slide 11: Maintaining Strong Cash Balance – No Debt
Maintaining Strong Cash Balance – No Debt 125 800 701 700 121 120 600 AISC Margin after ZCC** ($/oz) Consolidated Cash* (US$M) 500 115 400 115 300 210 150 200 110 100 106 106 - 105 (100) (201) (200) 100 (300) Q3 2024 Q4 2024 Q1 2025 Q2 2025 Cash balance AISC margin after ZCC *cash unaudited @ Q3 24,
Slide 12: Q2 2025 Exploration Update
~$10M Q2 2025 Exploration Update 2025 Exploration Budget Abore Infill Phase 2 infill drilling program expanded to 8,900m and is currently underway Program designed to test for further extensions of mineralization beginning immediately below the MRMR following excellent Phase 1 results Phase 1
Slide 13: Abore Phase Infill Targets
Abore Phase 2 Infill Targets New High Grade Discovery South High Grade Zone Potential Ore shoot Trends Priority Drill Targets 2025 Drill Hole Traces Abore Long Section Multiple Ore Shoot Targets 13
Slide 14: Abore: Q2 Deep Drilling Results
Abore: Q2 Deep Drilling Results Cross Section A-A1 showing hole ABPC25-356 Completed Abore step-out drilling program: • Consisted of 4 holes totaling 1,907m • Designed to test for continuity of mineralization below current MRMR • Confirmed granite and mineralizing system continues 200m below cur
Slide 15: Abore Plan Map: Deeps Drilling
Abore Plan Map: Deeps Drilling 15
Slide 16: Abore: Gram Meter Long Section of Q2 Deeps Drilling
Abore: Gram Meter Long Section of Q2 Deeps Drilling 16
Slide 17: Abore: Significant Grades and Widths at Depth
Abore: Significant Grades and Widths at Depth Wide intercepts of host granite such as that shown here in ABDD25-350 demonstrate the upside growth potential at depth at Abore This hole is located under Abore main pit and carries high grades that could support a potential underground bulk mining o
Slide 18: Abore: Significant Grades and Widths at Depth
Abore: Significant Grades and Widths at Depth Hole ABPC25-356 intersected well mineralized granite 200m below the Reserve at Abore north pit Demonstrates the scale of potential future growth at Abore 18
Slide 19: Building on Strong Fundamentals
Building on Strong Fundamentals Outlook Financial Exploration Mining Processing Country Risk Valuation Robust 5-year Strong cash Aggressively Ahead of strip Secondary Ghana – premier Positioned for a outlook balance of exploring Abore schedule at crusher project African mining re-rate
Slide 20: Appendix
Appendix G cauano cop
Slide 21: AGM Mineral Reserve Estimate as of December 31, 2024
AGM Mineral Reserve Estimate as of December 31, 2024 Proven Probable Total Proven and Probable Deposit Tonnes Au Grade Au Content Tonnes Au Grade Au Content Tonnes Au Grade Au Content (koz) (Mt) (g/t) (koz) (Mt) (g/t) (koz) (Mt) (g/t) Nkran 10.6 1.67 571 10.6 1.67 571 Esaase 13.6 1.22 533 13.6 1.22
Slide 22: AGM Mineral Resource Estimate as of December 31, 2024
AGM Mineral Resource Estimate as of December 31, 2024 Measured Indicated Measured + Indicated Inferred Deposit Tonnes Grade Au Contained Tonnes Grade Au Contained Tonnes Grade Au Contained Tonnes Grade Au Contained (Mt) (g/t) (koz) (Mt) (g/t) (koz) (Mt) (g/t) (koz) (Mt) (g/t) (koz) Nkran 16.3 1.81 9
Slide 23: Tax
Tax Ghana corporate tax regime Corporate income tax Withholding taxes Rate 35% for mining (general rate 25%) Charged on purchases from foreign suppliers; rates Capital expenditure amortized over 5 years depend on country of domicile, and type of service, but typically range from 10% to 20% O
Slide 24: Contact
Contact N. American Toll-Free: 1-855-246-7341 Email: info@galianogold.com © Copyright 2025 Galiano Gold. All rights reserved.