Dynaresource, Inc. · OTC:DYNR
Dynaresource — Investor Presentation (June 2025)
29 slides from Dynaresource's investor presentation, June 2025
Slide 1: A Golden Opportunity: A Junior Gold Producer Poised for Optimization and Growth
OTCQX: DYNR A Golden Opportunity: A Junior Gold Producer Poised for Optimization and Growth Corporate Presentation JUNE 2025
Slide 2: Cautionary Note
Cautionary Note Cautionary Note to U.S. Investors The United States Securities and Exchange Commission limits disclosure for U.S. reporting purposes to mineral deposits that a company can economically and legally extract or produce. We use certain terms on this web site, such as “reserves”, “resourc
Slide 3: DynaResource Overview
DynaResource Overview A Golden Opportunity San Jose de Gracia – Flagship High-Grade Gold and Silver Mine • District scale project consisting of 29 contiguous concessions totaling nearly 10,000 ha • Historical mining of ~1Moz in 1890-1910 with bonanza grades of ~1-2 oz/t (30-60 g/t) • Modern explorat
Slide 4: Investment Thesis: Why DynaResource?
Investment Thesis: Why DynaResource? A New, Emerging Gold Producer with Significant Exploration Potential • Technical Report in Q2 2025 defined high-grade Initial Mineral Reserve and updated Mineral Resource with growth potential Reserve/Resource Growth • Near mine Mineral Resource growth potential
Slide 5: Key 2025 Catalysts
Key 2025 Catalysts Growth and Profitability Driven Long-Term Major Production Profile Growth Further optimization efforts, and exploration to drive long-term production growth to +50,000 oz per year target Q4 2025 Uplisting to Major Exchange Uplist to Major North American stock exchange – liquidity
Slide 6: Mineral Reserve & Resource Estimate
Mineral Reserve & Resource Estimate For the Primary Deposits of Tres Amigos, San Pablo, La Union and La Purisima MINERAL RESERVE & RESOURCE MINERAL ESTIMATE Mineral Reserve Estimate Reserve Class Tonnes Grade Containe (k) (g/t Au) d Gold (koz Au) Proven 1,114 5.23 187.2 Probable 493 4.18 66.3 Proven
Slide 7: Pre Feasibility Study - Key Highlights
Pre Feasibility Study - Key Highlights Strong Economics Highly Leveraged to Gold Prices KEY ECONOMIC PARAMETERS Parameter Amount • Life of Mine of 7-years based on current Mineral Reserves with excellent Production mine life (years) 7 potential to extend along strike and adjacent to the existing und
Slide 8: 2025 Outlook & Guidance
2025 Outlook & Guidance Production + Operations • As the optimization program continues at San Jose de Gracia we expected continued production growth in 2025 greater than 10% year over year • Enhanced focus on underground mine development and introduction of tailored mining methods (long hole) • 202
Slide 9: Operational & Financial Overview
Operational & Financial Overview Increasing Revenue, Production and Profitability Operational Financial • 2024 full year production of 25,677 ounces of gold fell within the • Revenue for the full year 2024 totaled $46.5 million, up 31% over 2023, Company’s updated guidance driven by greater producti
Slide 10: Metallurgical Test Work to Drive Near-Term Production Growth
Metallurgical Test Work to Drive Near-Term Production Growth Imminent Catalyst for Increased Production in a High Gold Price Environment • Metallurgical test work results provides support for capital improvement plan and ability to improve recoveries and bolster profitability • Test work results fro
Slide 11: Sierra Madre Occidental Gold Belt
Sierra Madre Occidental Gold Belt San Jose de Gracia Located on Trend of Prolific Geological Region OTCQX: DYNR www.dynaresource.com Page 10
Slide 12: Regional Exploration/Resource Growth Potential
Regional Exploration/Resource Growth Potential Underexplored Large Land Package with Multiple Known Targets Unexplored • Extensive land package still minimally explored portion of property • Multi-million gold ounce potential • Total drilling of over 120,000 meters to discover over 1Moz resource • H
Slide 13: Regional Geology / Long Section
Regional Geology / Long Section Targets New Potential and New Resources Long Section at Looking Northwest Strategic Tunnelling Plans A A” SPS 550S L Drilling Plan 79.7 Au gr/t Grade 79.7 Au gr/t@ 1.0m HACIENDITAS ORANGE TREE TRES AMIGOS SAN PABLO MOCHOMERA 9 (Production) (Production) (Production) 8
Slide 14: Capital Structure Overview
Capital Structure Overview Capital & Ownership Structure Capital Structure Ownership Structure Share Price $1.57 00 (As at May 29, 2025) 0% 0% Shares Outstanding 29.3M Retail 100% Cash and Cash Equivalents $2.2M (As at March 31, 2024) Market Capitalization $46M Insiders Warrants + Options 2.0M 14% R
Slide 15: An Undervalued Gold Producer
An Undervalued Gold Producer Significant Rerating Potential – A Golden Opportunity 2024 E EV/Production (US$/oz) Minera Alamos $11,777 Orla $10,038 Wesdome $7,569 Calibre $6,609 McEwen $6,299 Aris $5,860 Americas G&S $3,469 Jaguar $3,110 Mandalay $1,901 Serabi $1,829 Cerrado $1,543 Orvana $1,228 Dyn
Slide 16: Leadership Team
Leadership Team Seasoned, New Management Team and Experienced Board DynaResource Board of Directors & Management ➢ Rohan Hazelton, President & CEO, Director CPA, former DynaResource de Mexico S.A. de C.V. – Management Goldcorp and Cerrado Gold ➢ Alonso Sotomayor , CFO CPA, former KPMG, Deloitte, Cer
Slide 17: Appendix
OTCQX: DYNR Appendix
Slide 18: Production History
Production History Gold Concentrate Production Summary (2016 -2024) Production Highlights: ➢ Production began in 2016 with throughput rate of 100tpd growing to 850-900tpd in Oct 2024 ➢ Gold production increased from 10,836 ounces in first year of production to 31,905 in 2022 ➢ 2024 full year product
Slide 19: Regional Geology Map
Regional Geology Map La Prieta Conceptual Exploration Tunnel LA PRIETA Regional Potential CONCEPTUAL TUNNEL Cross Section Looking West 600-700m N Tre s Amigos Tre s 2 km N Amigos San Pablo & S an Pablo Sur San Pablo & S an Pablo Sur La Mochomera Rosario La Prieta Regional Geology Main Tunnel New Por
Slide 20: San Pablo & Mochomera Gold Potential
San Pablo & Mochomera Gold Potential LA MOCHOMERA VEIN LONG SECTION SAN PABLO VEIN LONG SECTION S N S N 300 m 600 m 1500 meters 3000 meters As ore drives As ore drives OPEN Plus drifting waste Plus drifting waste Palos Chinos 577L 563 Level 563 L 3 548 L 533 N 518 N 515 L 500 N 485 N 500 L 1 500 L 4
Slide 21: San Pablo Mine South Level
San Pablo Mine 500 South Level SAN PABLO VEIN LONG SECTION 500 South Level Demonstrating High Grade “Bonanza” Potenial PLAN VIEW Fte 588 Reb 515 N Fte 500 S Fte 486 S Fte 487 Rpa SPS Open to South, Lateral and at Depth Rpa SP Planned Drifting Planned Drilling Program Planned Stope 100 m Current Stop
Slide 22: Example Tres Amigos Potential - Targets
Example Tres Amigos Potential - Targets WASTE RAMP ? PLANNED MINE PORTAL CREEK 50-70 m ? 1 TARGET 31.1035 TONS Au g/t Oz Au ORE DRIVE 1 2.7 50,625 6.0 9,766 TOTAL 37,969 7,324 31.1035 OPEN 2 2 2.7 101,250 6.0 19,532 ACTUAL 594 STOPE TOTAL 75,938 14,649 IN PRODUCTION 31.1035 OPEN 3 2.7 202,500 6.0 39
Slide 23: Geology
Geology UG Mining & Exploration Targets for New Resource LONG SECTION LOOKING WESTERN S LOW ANGLE FAULT N SAN PABLO TRES AMIGOS MOCHOMERA CESEÑA CESEÑA PALOS CHINOS LA PRIETA- EL SALTO ROSARIO PURISIMA OPEN ?? OPEN ?? HACIENDITA NEW MINE POTENTIAL NEW MINE POTENTIAL OTCQX: DYNR www.dynaresource.com
Slide 24: Cross Section
Cross Section Geological Model Raise Bore 250m Raise Bore 250m 2.2 g/t_Au @ 1.0m 2.2 g/t_Au @1.0m 7.0 g/t_Au @1.0m 485 L 2.5 g/t_Au @ 1.0m Planned Cross Cut 300m Connect Exploration & Haulage 9.5 g/t_Au @1.5m 5.2 g/t_Au @ 1.5m High Grade Geological Potential Ore Shoot OTCQX: DYNR www.dynaresource.co
Slide 25: Regional Geology
Regional Geology UG Mine Model to Explore N Tres Amigos DRILLING/DRIFTING 50-70° PLAN 2025 Q1-2-2025 Expl Drilling 2025 San Angel Q3-2025 Q1-2-2025 Main Corridor N-S 50-70° Two Faces 470 North Level San Pablo & San Pablo Sur Planned Cross Cut 300m to connect • Haulage • Ventilation • Exploration Dri
Slide 26: Grade Control
Grade Control Instituting Operational Discipline • Demarcation lines for topographical control prepared by Geology Dept. • Drill and blast lines clearly marked • Lines to demarcate mucking boundaries OTCQX: DYNR www.dynaresource.com Page 25
Slide 27: Long Hole Stoping
Long Hole Stoping New Long Hole Stoping for Specific Mine Areas OTCQX: DYNR www.dynaresource.com
Slide 28: Mill Flow Sheet 900 tpd Flotation Concentrate Circuit
Mill Flow Sheet 900 tpd Flotation Concentrate Circuit OTCQX: DYNR www.dynaresource.com Page 27
Slide 29: Corporate Office and Contact
CORPORATE OFFICE: CONTACT: The Urban Towers Investor Relations 222 West Las Colinas Blvd E: info@dynaresource.com Suite 1910 North Tower T: (972) 869-9400 Irving Texas 75039 www.dynaresource.com