Mgx Resources Limited · ASX:MGX

Mgx Resources — Mount Gibson Iron — BBY/Jeffries Resource Conference 2005

23 slides from Mgx Resources's conference presentation, May 5, 2005

  1. Slide 1: Investor presentation to BBY/Jeffries Resource Conference

    x & ® Mount Gibson Iron Limited re 2 ABN 87 008670817“ hha. First Floor, 7 Havelock Street Mount Gibson fron West Perth 6005, Western Australia PO Box 55, West Perth WA 6872 Telephone: 61-8-9485 2355 VIA: WWW.ASX.ONLINE.COM Facsimile: 61-8-9485 2305 E-mail: admin@mtgibsoniron.com.au 5 May 2005 No. P

  2. Slide 2: Mount Gibson Iron

    ve ‘An Mount Gibson fron Available at www.ini

  3. Slide 3: Mount Gibson Iron Group Resource Locations

    Taliering Peak Hienatite & Magretta Shiploading Factities (50,00 - €0.000DWT) Tre 4 20 50 4 soKm a 11600000 ak Aa (AMG) “ Koolmooka South Heinatite & Magnan Tat Gibson Hematite « Magnonte [68 Extension Hill & extension Flsoyn F7S +L. iran Hill shen Hill Wwasmngy | ; =) ‘, _ wespeRe ert MOUNT GIBSON

  4. Slide 4: Development Phase One: High Grade Hematite

    ELOPMENT PHASE ONE IG GRADE HEMATITE at Tallering Peak mine from 2.0Mtpa to 3.0Mtp ‘ity currently available in the MidWest region - erating profit at Tallering Peak of over $25.00 per k at.3.0Mipa for 5 — 6 years then relocate operati son mine should be similar to Tallering Peak . costs will be larg

  5. Slide 5: Hematite resources and exploration potential

    . “Grade Measured Indicated © Fe Lump Resource Resource - Mt Mt 63.5% 16.0 3.0. 63.0% 10.7 20°." 63.0% 27 29.4 3.0 ORATION POTENTIAL E xploration’s 2730km? areas in Pilbara (shallow pi rgets. adjacent to existing infrastructure) [ding in Resource Mining Corporation — Argyle 3

  6. Slide 6: Pilbara Tenements

    djacent to Hamersley ron railway and entrally between Marandoo, Tom. Price nd Mt Brockman mines djacent to BHP- iliton railway and 0 km from. Mt Whaleback mine 0 km from: Hamersiey fon's railway and entrally between West ‘0 km from proposed lope Downs. mine and ailway ‘0 km from proposed lope Downs

  7. Slide 7: Development Phase Two: Concentrate & Iron Pellets

    ELOPMENTPHASETWO CONCENTRATE & IRON PELLETS d phase of development will involve investment region of Western Australia and the production Limited (“MGI”) currently has a 63% sharehold oldings Limited (“Asia Iron”) 0 joint venture with a major Chinese steel mill, wi Hill (Mt Gibson) to produce 5.0Mtp

  8. Slide 8: Development Phase Two: Concentrate & Iron Pellets

    ELOPMENT PHASE TWO NCENTRATE & IRON PELLETS he development and operation of the Extensio tee of $3. 50 per tonne of concentrate produced ($ : tly recruiting highly experienced expatriate mana iff provided by Nanjing lron & Steel, to manage the } aility Study. to be completed in September 2005 - e Ex

  9. Slide 9: Investment in Asia Iron

    IN ASIA IRON ta total of A$65 million for an ultimate.75% shai E te.and A$50 million in December 2005)... _ A$80 million for its remaining equity contributio ension Hill mine, and the Longtan pellet plant: will be provided by; ion by MGI December 2005 (A$50 million) ents on purchases from long term

  10. Slide 10: Resources

    SOURCES Measured Indicated... In Resource Resource. Res¢ Mt Mt / 153.0 50.0 Extension Hill has been scheduled for:a.20 yea ants ; on - 5.0Mtpa 68% Fe magnetite oncentrate.to ore - 46% area to.ore ratio - 1.1 to 1.0 by weight after (final ratio and-ore reser determined in the near f of recent geotech

  11. Slide 11: Extension Hill Project: Aerial Magnetic Survey

    EXTENSION HILL PROJECT AERIAL MAGNETIC SURVEY 9

  12. Slide 12: Project Layout and Geology

    &. Waste Dump ~ — i> - ‘te, Te fo PROJECT LAYOUT AND GEOLOGY 10

  13. Slide 13: Magnetite Mine & Longtan Pellet Plant Summary

    AGNETITE MINE & LONGTAN PELLET MARY. SS Development And Pellet Plants ingency) -- TOTAL Group. TOTAL 11

  14. Slide 14: Magnetite Mine & Longtan Pellet Plant Summary

    MAGNET MARY — ITE MINE & LONGTAN PELLET AS/tonne pellets 10.09 9.63 16.38 0. Note: MGI is investigatin: 4419 pipeline concentrai . which would great! Gi 3.50 costs fo port oo 0.75 2,50 : 47.04 inloading 25.52 oe 6.70 1.55 33.77 very 5.49 : 0.50 te) 4.98 10.97 _ 91.78 ne.CIF Nanjing) 121.79 r tax per

  15. Slide 15: Pellet Production in Nanjing

    PELLET PRODUCTION IN NANJING Ss. : of constructing a pellet plant 450km_up the Yani of the port of Longtan means that it will-be able t ‘aldton to its plant at Longtan and avoid expensive | urred by competitors importing pellets or pellet fee ion particularly from Brazil which ships in capesize et p

  16. Slide 16: Minti nii

    Minti nii

  17. Slide 17: Magnetite, hematite projects and investments

    100% 100% Magnetite + Sheldon Hitt + Extension Hill South + fron Hill Hematite + Tallering Peak + Extension Hill (Mt Gipson) ">, + Iron Hill (ME Gibson) + Sheldon Hill (Mt Gibson) + Koolanocka South + Watebing investments + Poondano Exploration (6 Pilbara Pisolite) + Resource Mining Corporation (7%)

  18. Slide 18: Projections: Mount Gibson Iron Limited

    IONS — MOUNT GIBSON IRON LIMITED 2004/05 2005/01 mili tonnes 1.9 2. mill tonnes - er o'heads) AS milf 25.9000 74 fee: a AS mill * 50% JV). AS mill - (40 ; A$ mill 25.9 ° 64 ler otheads) AS mill 224 68 fee AS mill - 50% JV) AS mill : ( A$ mill 22.4 67 er otheads) AS mill 22.4000 50 Lee ~ AS mill 2 50

  19. Slide 19: Growth in Shares

    OWTH:IN SHARES il 2005) December 2005 — 30 cents) er. 2005 -.22 cents) ; SHARES ON ISSUE JUNE 2006 tions (December 2006 -25 cents) ‘ector. Options (December 2007 - 50 cents) tor Options (December 2008 - 55 cents) . "SHARES ON ISSUE DEC 2008. 17

  20. Slide 20: Shareholders (as at February 2005)

    REHOLDERS (as at 25 February 2005) Shareholder Shares Hel ees Limited 7 ong) Lid Investment Services Ltd <SHKIS No5 A/C> Investment Services Ltd <SHKIS No2 A/C> cd ust) Pty Limited ings AG Nominees (Australia) minees Australia Limited in Pty Limited <MCM TCF A/C> Limited tralia Pty Ltd ig Limited (T

  21. Slide 21: Directors and management experience

    ih extensive technical and management experience in thi ore, -He.was Executive Director and Chief Executive of inclusive, and was responsible for the joint venture betw Sumitomo Metals for the management, operation and ex tin the. Pilbara region of Western Australia. Prior to this for.exploration, m

  22. Slide 22: Management team

    ‘inancial Officer) 'h over .15 years experience in the mining industry, havi Tinto Limited, North Limited, Anaconda Nickel Limit janager. Operations) ineer with extensive experience in both open pit and_un was the Resident Manager of the Broken Hill. mine of Peril p of that operation. Prior to this

  23. Slide 23: Disclaimer

    ectus nor an Offer to Subscribe for Shares. d its subsidiaries (“MGI”) makes no representations or warranty ( eliability or completeness of this document. MGI and: its respective tants shall have no liability (including Hability to any person by re: atement) for any statements, opinions, information

Mount Gibson Iron — BBY/Jeffries Resource Conference 2005 on 6ix