Rimfire Pacific Mining Limited · ASX:RIM
Rimfire Pacific Mining — Shareholder Meeting (November 2026)
14 slides from Rimfire Pacific Mining's shareholder meeting presentation, Nov 26, 2026

Slide 1: Scandium: the critical material powering next-gen technology
r personal use only AGM PRESENTATION | 26 NOVEMBER 2026 Scandium: the critical material powering next-gen technology ASX: RIM Central NSW 16.2 Kt Total Sc₂O₃ resources Emerging developer Scandium district (16.2Kt attributable) Source: Rimfire ASX, 13 Apr 2026

Slide 2: Why Scandium Matters
WHY SCANDIUM MATTERS Small quantities, outsized performance r personal use only Stronger, lighter Just 0.2–0.4% (by weight) scandium in aluminum enhances strength, weldability and corrosion resistance Cleaner power 85% of demand comes from Scandium-stabilised zirconia lets solid oxide fuel cells run

Slide 3: Global Market: Projected Scandium Oxide Demand of 706t by 2050
GLOBAL MARKET Projected Global Scandium Oxide Demand of 706t by 2050 r personal use only AI Gap A growing gap between scandium demand and supply is expected - driven by geopolitics, supply chain uncertainty, and projected growth in AI data centres Sources: EY - Parthenon scandium study commissioned

Slide 4: Supply and Demand: Supply is the bottleneck
SUPPLY AND DEMAND Supply is the bottleneck: tens of tonnes a year, mostly by-product r personal use only ~60 t 100% ~US$1,500 – 3,000/kg Estimated annual scandium oxide US net import reliance for scandium; no Scandium Oxide price – used in market FS studies production (2025), mainly China, commercia

Slide 5: Powering AI Data Centres
POWERING AI DATA CENTRES Electricity grid cannot keep up with AI Data Centre growth r personal use only Electricity Consumption • Globally data centres currently consume estimated ~ 485 to 560 terawatt-hours (TWh) of electricity per year (1.5% to 2% of total global electricity demand) & forecast to

Slide 6: Rimfire at a Glance
RIMFIRE AT A GLANCE A scandium-focused developer in Australia’s scandium heartland r personal use only 1.0c ~A$30M A$1.7M 16.2Kt Share price, 6 Nov 2026 Market cap at 1.0c (19 Cash at end of Sep 2026 Scandium Oxide Oct 2026) Qtr. (12.6Kt attributable) Strategy Become a leading international scandium

Slide 7: Project Portfolio
PROJECT PORTFOLIO Dominant scandium - prospective land position r personal use only Bogan River Rimfire 100% owned (applications) Licence grant - late December 2026 Qtr. Rabbit Trap Rimfire 100% owned Air core drilling to underpin maiden MRE - March 2027 Qtr.. Fifield Earn-in Rimfire 100% / GPR earn

Slide 8: Murga Scandium Deposit
MURGA SCANDIUM DEPOSIT Murga: a less complex and lower capital-intensive processing route? r personal use only Bottle roll tests - 73% (saprolite) and 34% (laterite) projected recoveries after 52 weeks 11.9Kt Scandium oxide resource (announced 13 Apr 2026) Bottle roll data at end of 21 weeks • Recov

Slide 9: Project Portfolio: RIM 100% Projects add upside
PROJECT PORTFOLIO RIM 100% Projects add upside r personal use only Bogan River • Adjacent Nyngan Deposit (TSX-V: SCY) Rabbit Trap • Multiple undrilled magnetic anomalies Rosehill (Malamute) 2,500m air core drill program • Licence grant - expected late commencing January 2027 with maiden MRE to follo

Slide 10: Share Price Catalysts
SHARE PRICE CATALYSTS News flow concentrated over next two to three months r personal use only Long-term Bottle Roll recovery update / Column Leach and Agitated November 2026 Metallurgical Study and drilling update Tank Leach updates / Rabbit Trap drilling update December 2026 Completion of Long-ter

Slide 11: Summary: Investment thesis
SUMMARY Investment thesis r personal use only Potential share price catalysts Why Rimfire • Abundant news flow over coming months: Murga • Scale: 16.2 Kt Sc₂O₃ resource inventory (12.6Kt attributable), metallurgy / Rabbit Trap and Bogan River work programs including 11.9 Kt at Murga • High Impact Wo

Slide 12: Appendices: Resource Inventory and Cautionary Statements
APPENDICES Resource Inventory and Cautionary Statements r personal use only Rimfire Scandium Resource Inventory (Also Refer to RIM ASX Releases - 5/09/2024, 20/10/2025 and 13/04/2026) Cut off Deposit Category Mt Sc_ppm Sc Oxide_ppm Sc tonnes Sc Oxide tonnes Melrose Indicated 2.9 250 380 730 1,120 Me

Slide 13: Appendices: Competent Persons Statement
APPENDICES Competent Persons Statement r personal use only COMPETENT PERSONS DECLARATION The information in the report to which this statement is attached that relates to Exploration and Resource Results is based on information reviewed and/or compiled by David Hutton who is deemed to be a Competent

Slide 14: Appendices: Disclaimer
APPENDICES Disclaimer r personal use only FORWARD LOOKING STATEMENTS DISCLAIMER This document contains “forward looking statements” as defined or implied in common law and within the meaning of the Corporations Law. Such forward looking statements may include, without limitation, (1) estimates of fu
Source: ASX announcement, Nov 26, 2026
More decks from Rimfire Pacific Mining Limited
Investor Presentation (March 2026)15 slides · Mar 31, 2026
Investor Presentation (February 2026)21 slides · Feb 16, 2026
Shareholder Meeting (November 2025)19 slides · Nov 18, 2025
AMEC SA Conference September 20257 slides · Sep 22, 2025
Corporate Update (July 2025)24 slides · Jul 23, 2025
Corporate Update (February 2025)22 slides · Feb 25, 2025