Neo Energy Metals plc · LSE:NEO

Neo Energy Metals — Investor Presentation (November 2026)

42 slides from Neo Energy Metals's investor presentation, November 2026

  1. Slide 1: Building South Africa's Next Uranium and Gold Producer

    Building South Africa’s Next Uranium and Gold Producer Corporate Presentation November 2026 1

  2. Slide 2: Important Notice

    Important Notice Forward-looking statements. This presentation contains forward-looking statements, including statements about the Company’s plans, timetable and expected outcomes for the New Beisa and Henkries projects, completion of the Sibanye-Stillwater transaction and the related Section 11 and

  3. Slide 3: Key Corporate Highlights

    Key Corporate Highlights Neo's strategy is capital-efficient by design: re-commissioning existing infrastructure GOLD AND URANIUM RESOURCE COMMODITY-PRICE BACKDROP EXISTING MINE INFRASTRUCTURE US$7.90bn in-situ resource value across two Demand growth supports uranium and gold ~US$500M of capex alrea

  4. Slide 4: Executive Team

    Executive Team Operational depth, capital markets experience, and direct knowledge of Neo Energy’s assets Theo Botoulas Elmarié Maritz Frederik Brand Board and executive team: Chief Executive Officer | Executive Director Chief Financial Officer Chief Governance and Legal Officer Combined 140+ years

  5. Slide 5: Board of Directors

    Board of Directors Independent, experienced, and operationally grounded. All four board committees are constituted Neal Froneman Sajjad Sabur John Wallington Johan Reeder Independent Non-Executive Chairman Independent Non-Executive Director Independent Non-Executive Director Independent Non-Executiv

  6. Slide 6: Project Scope

    Project Scope Full development and re-establishment of New Beisa, phased around the Section 11 transfer CURRENT PHASE Pre-Section 11: controlled early works SECTION 11 GATE POST-TRANSFER PHASE Full implementation • Project set-up: governance, WBS, cost and schedule controls • Underground access, sha

  7. Slide 7: The Sibanye-Stillwater Relationship

    The Sibanye-Stillwater Relationship Sibanye-Stillwater: a global mining and metals processing group with a diverse portfolio of operations, projects and investments across five continents What Sibanye gets SIBANYE-STILLWATER MARKET RELEASE (9 DECEMBER 2024) Sibanye-Stillwater (JSE: SSW; NYSE: SBSW)

  8. Slide 8: Corporate Structure and Capital Markets

    Corporate Structure and Capital Markets 56-year mine life extension – subject to a study Current structure (as of November 2026) PEER COMPARISON – AFRICAN URANIUM Listing DEVELOPERS • Listing: LSE Main Market (LSE: NEO) | A2X Markets (A2X: NEO) 2.95 times uplift • Shares outstanding: 3.10 billion to

  9. Slide 9: Uranium Market Fundamentals

    Uranium Market Fundamentals Uranium requirements are set to more than double by 2040 and existing mines face depletion URANIUM MARKET OUTLOOK Uranium demand, supply and price Demand: a growing reactor fleet Mine production (000 tU) and % of world Uranium requirements (tU) demand met • 443 operable r

  10. Slide 10: Gold Market Fundamentals

    Gold Market Fundamentals Gold has eased from January’s record, but central-bank and investor demand continue to underpin the price GOLD PRICE: RALLY CONSOLIDATING Gold price (US$/oz, monthly average) | 2016 – October 2026 Source: World Bank Commodity Price Data (Pink Sheet), London PM fix (to Oct 20

  11. Slide 11: Witwatersrand Basin – Regional Geology

    Witwatersrand Basin – Regional Geology WHAT YOU ARE LOOKING AT Map showing the regional geological framework of the Witwatersrand Basin. LOCATION AND CONTEXT Free State Goldfields – New Beisa sits in the world-class Witwatersrand Basin, the source of around 40% of all gold ever mined. Neighbours – H

  12. Slide 12: New Beisa – Asset Overview

    New Beisa – Asset Overview Brownfield uranium and gold project near Virginia, Free State. An estimated US$500 million in historical capital investment. Implementation assessment in progress. Gold production first. INFRASTRUCTURE • An estimated US$500M in historical capital investment; placed on care

  13. Slide 13: New Beisa Geology

    New Beisa Geology WHAT YOU ARE LOOKING AT Schematic 3D section through the Beatrix ore body looking north-northeast, showing the Beisa Reef in context with adjacent geological units. LOCATION AND CONTEXT Free State Goldfields – New Beisa is situated in the world-class Witwatersrand Basin, the source

  14. Slide 14: Shaft and Level Layout (Cross-section)

    New Beisa – Shaft and Level Layout (Cross-section) WHAT YOU ARE LOOKING AT A vertical slice through the New Beisa orebody showing how three shafts connect to working levels underground. Depths are in metres below surface. Downcast Shaft Upcast Shaft Downcast Shaft THE THREE SHAFTS No. 1 Main Shaft (

  15. Slide 15: New Beisa – Infrastructure and Previous Mining

    New Beisa – Infrastructure and Previous Mining WHAT YOU ARE LOOKING AT 3D model of the New Beisa orebody showing all historical mining and development tunnels available for reuse. Viewed from above, looking north. THE FOUR INITIAL PRIORITIES Top shaft and six levels – Refurbish the existing shaft an

  16. Slide 16: New Beisa – Areas of Interest

    New Beisa – Areas of Interest WHAT YOU ARE LOOKING AT Plan view of the New Beisa orebody looking down from above, showing the two target mining areas on the north and south flanks, the shaft, and the mined centre. THE COLOUR-CODED LEVELS Each colour band is a mining level – a horizontal slice of the

  17. Slide 17: New Beisa – Process Plant Overview

    New Beisa – Process Plant Overview Integrated dual-metal recovery: 135 kt/m throughput producing gold bullion and U₃O₈ product drums from a single orebody and single tailings stream 135 kt/m NEO ENERGY METALS PLC • Corporate Presentation November 2026 17

  18. Slide 18: New Beisa – Progress Report

    New Beisa – Progress Report LEGACY DATA REVIEW COMPLETED Fully reviewed and interpreted the Sibanye historical data package, modernising the technical foundation PHASE 1: UNDERGROUND LAYOUTS, GEOLOGICAL MODEL AND STOPE SHAPES Commenced full 3D reconstruction of the underground mine layout, replacing

  19. Slide 19: Henkries – Near-Surface Uranium

    Henkries – Near-Surface Uranium Near-surface uranium deposit, Namaqualand, Northern Cape. Mining Right Application accepted by the DMPR. Established feasibility economics PRELIMINARY PROJECT ECONOMICS HENKRIES | Northern Cape DEPOSIT OVERVIEW Resource (U) 4.70 Mlbs (JORC) • Palaeo-channel-hosted ura

  20. Slide 20: Henkries – High-Grade at Surface, Shallow Uranium

    Henkries – High-Grade at Surface, Shallow Uranium WHAT YOU ARE LOOKING AT Geological cross-section through the Henkries Central deposit showing drill holes and uranium intercepts (thickness @ grade). SW to NE orientation; 10 m vertical scale. THE INTERCEPTS Numbers show thickness (m) @ grade (ppm U₃

  21. Slide 21: Henkries – Topography, Pit Shapes and Block Model

    Henkries – Topography, Pit Shapes and Block Model WHAT YOU ARE LOOKING AT 3D model of Henkries Central and North deposits showing surface topography, initial open- pit shell designs (yellow), and the uranium block model (coloured blocks = grade). THE FOUR COMPONENTS Exploration licence area – The fu

  22. Slide 22: Henkries – Phased Exploration Approach

    Henkries – Phased Exploration Approach WHAT YOU ARE LOOKING AT Proposed exploration layout plan for Desert Star Uranium (DSU) at Henkries, showing five drill phases across the project area within the DSU site boundary (red outline). THE PHASED APPROACH Phase 1A and 1B – Initial programmes upgrading

  23. Slide 23: Henkries – Technical Progress Report

    Henkries – Technical Progress Report PHASE 1: WORK IN PROGRESS Reworking the open pit designs using the current block model and updated geological interpretation whilst identifying expansion potential and refining pit geometry for improved economics. Incorporating historical unassayed Drill Hole Dat

  24. Slide 24: Contact information

    Contact information Theo Botoulas Chief Executive Officer Email: theo@neoenergymetals.com Elmarié Maritz Chief Financial Officer Email: elmarie@neoenergymetals.com Corporate Advisors Corporate broker: Shore Capital Investor resources Website: neoenergymetals.com/ LinkedIn: Neo Energy Metals NEO ENER

  25. Slide 25: Appendix 1: Project Trajectory

    Appendix 1: Project Trajectory NEO ENERGY METALS Indicative schedule – subject to funding and regulatory approvals Today 2025 2026 2027 2028 2029 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 CORPORATE & REGULATORY Sibanye Section 11 carve-out COMPLETE Sibanye Section 102 PENDING – revised d

  26. Slide 26: Appendix 2: Typical Stoping Layout

    Appendix 2: New Beisa – Typical Stoping Layout WHAT YOU ARE LOOKING AT Plan view of a single stoping panel – the basic production unit at New Beisa. Shows the support layout, pillar positions, and mining geometry for one stope. Strike Gully HOW STOPING WORKS Stoping is the process of blasting and re

  27. Slide 27: Appendix 3: New Beisa – Production Potential

    Appendix 3: New Beisa – Production Potential WHAT YOU ARE LOOKING AT Schematic cross-section showing the full long-term shaft and level layout: two shaft systems reaching 2,303 m below surface, serving 24 mining levels and a 130,000 tpm gold plant at surface. THE TWO SHAFT SYSTEMS No. 4 Main Shaft –

  28. Slide 28: Appendix 4: New Beisa – Stratigraphic Column

    Appendix 4: New Beisa – Stratigraphic Column WHAT YOU ARE LOOKING AT The Stratigraphic Column of the Beisa Reef, showing the full rock sequence from the West Rand Group at the base through to the Karoo Supergroup at surface, with reef horizons, thicknesses and lithological descriptions. THE ROCK SEQ

  29. Slide 29: Appendix 5: New Beisa – Project Layout

    Appendix 5: New Beisa – Project Layout WHAT YOU ARE LOOKING AT 3D perspective of the full orebody showing the shaft, previous workings, and the north and south extensions targeted for new production. THE THREE ZONES Previous workings (2.7 km) – Central section, largely mined out. Infrastructure avai

  30. Slide 30: Appendix 6: New Beisa – Gold Plant Visualisation

    Appendix 6: New Beisa – Gold Plant Visualisation 3D representation of a typical gold processing plant of the type planned at New Beisa, showing ROM feed, autogenous milling, CIP adsorption and elution circuits NEO ENERGY METALS PLC • Corporate Presentation November 2026 30

  31. Slide 31: Appendix 7: New Beisa – Gold Plant Flow Diagram

    Appendix 7: New Beisa – Gold Plant Flow Diagram eight-stage Kemix Pump Cell carousel CIP, Pressure Zadra elution at 140°C, electrowinning and gold pour to Au bullion; 2 × rotary kilns for carbon regeneration NEO ENERGY METALS PLC • Corporate Presentation November 2026 31

  32. Slide 32: Appendix 8: New Beisa – Uranium Plant Flow Diagram

    Appendix 8: New Beisa – Uranium Plant Flow Diagram Sulphuric-acid leach at 65°C, six-stage counter-current CCD wash, IX/SX uranium recovery, yellowcake dewatering and calcining to U₃O₈ product drums NEO ENERGY METALS PLC • Corporate Presentation November 2026 32

  33. Slide 33: Appendix 9: New Beisa – Underground Mining

    Appendix 9: New Beisa – Underground Mining WHAT YOU ARE LOOKING AT Three views of New Beisa underground mining: the haulage drive (top), an active stope (bottom left) and gold-bearing conglomerate ore from the Beisa Reef (bottom right). THE HAULAGE Level drive – A horizontal tunnel driven along the

  34. Slide 34: Appendix 10: New Beisa – The Geological Case

    Appendix 10: New Beisa – The Geological Case One reef. Two commodities. Billion-dollar neighbours. Low geological risk. The Witwatersrand What makes New Beisa unusual The Witwatersrand is the most productive gold-bearing The Beisa Reef carries both gold and uranium within the same mineralised system

  35. Slide 35: Appendix 11: Henkries – The Geological Case

    Appendix 11: Henkries – The Geological Case An ancient buried river, carrying uranium at grades four times the global average – less than 10% of it explored. What is a palaeo-channel deposit? Grade – What makes Henkries an outlier The global average grade for open-pit uranium mining is 300–500 ppm U

  36. Slide 36: Appendix 12: Henkries – Uranium Mine Licence Area

    Appendix 12: Henkries – Uranium Mine Licence Area WHAT YOU ARE LOOKING AT Aerial satellite image of the 743 km² Henkries Uranium Project in Namaqualand, Northern Cape. The project covers a 37 km stretch of the Koa palaeo-channel. HENKRIES – PHASE 1B 6 km of palaeo-channel –The main orebody with exis

  37. Slide 37: Appendix 13: Responsible Development

    Appendix 13: Responsible Development Responsible development is a condition of licence, not a marketing position. Neo starts from that reality ENVIRONMENTAL SOCIAL GOVERNANCE Starting from an established baseline B-BBEE and ownership Board and committees • Uranium mining carries a well-documented en

  38. Slide 38: Appendix 14: Community & Stakeholder Engagement

    Appendix 14: Community & Stakeholder Engagement Neo prioritises community engagement as a core component of responsible project development STAKEHOLDER ENGAGEMENT PROTECTION SERVICES RISK MONITORING Community Liaison Committee Monitoring programme Risk management framework • Neo prioritises proactiv

  39. Slide 39: Appendix 15: Investment Highlights – Key Overview

    Appendix 15: Investment Highlights – Key Overview Comparative project metrics at current uranium price (~US$91/lb). Both assets are in production-oriented jurisdictions with established infrastructure PROJECT METRICS AT A GLANCE WHERE WE OPERATE NEW BEISA | Free State HENKRIES | Northern Cape Resour

  40. Slide 40: Appendix 16: Technical Details

    Appendix 16: Technical Details Additional information for technical review New Beisa – mining method Resource classification • Conventional underground mining (scattered mining) • SAMREC Code: South African Mineral Resource Committee Code (2016) • Reef: Beisa Reef; average width approximately 1.0–1.

  41. Slide 41: Appendix 17: South Africa

    Appendix 17: South Africa Nuclear and Mining Regulatory Framework • More than 70 years continuous uranium production; fully integrated industry from mining Labour, Employment & Social through to yellowcake export Basic Conditions of Employment Act 3 of 1997 • Key facilities: Pelindaba (nuclear resea

  42. Slide 42: Appendix 18: Glossary

    Appendix 18: Glossary Mining and Geology terms • Brownfield: previously developed mining area with existing infrastructure • Cut-off grade: minimum grade for material to be classified as ore • g/t: grams per tonne | kg/t: kilograms per tonne | ppm: parts per million • In-situ: in original position i

Neo Energy Metals — Investor Presentation (November 2026) on 6ix