Westwater Resources, Inc. · AMEX:WWR

Westwater Resources — Uranium Resources — Merger or Acquisition (June 2015)

28 slides from Westwater Resources's merger presentation, Jun 4, 2015

  1. Slide 1: Merger of Uranium Resources, Inc. & Anatolia Energy Limited

    Merger of uranium resources, INC (Nasdaq:urre) & Anatolia energy Limited (asx:aek) Joint webcast & conference call – June 3/4, 2015 Creating a new uranium company aiming for a fast-track to high margin uranium production Christopher M. Jones President and Chief Executive Officer Uranium Resources, I

  2. Slide 2: Cautionary statement

    Cautionary statement This presentation contains forward-looking statements within the meaning of the Private Securities Litigation Reform Act of 1995. Forward-looking statements are subject to risks, uncertainties and assumptions and are identified by words such as “expects,” “estimates,” “projects,

  3. Slide 3: Competent persons statements

    Competent persons statements For Anatolia Information in this presentation which relates to Anatolia’s Mineral Resources and Exploration Results is based on information compiled by Mr Dmitry Pertel and Mr Robert Annett, who are Members of the Australian Institute of Geosciences (“AIG”). Mr Pertel is

  4. Slide 4: Cautionary note regarding references to resources and reserves

    Cautionary note regarding references to resources and reserves The Company discloses mineral resources, including inferred resources, pursuant to the Canadian Institute of Mining, Metallurgy and Petroleum Standards (CIM Standards) for reporting mineral resources and reserves, and Canadian National I

  5. Slide 5: Transaction highlights

    Transaction highlights Creation of a leading, international uranium developer with high-quality ISR and conventional uranium projects Potential for near-term production from the high-grade, and low-cost Temrezli ISR Project in Turkey Substantial development synergies identified, with potential to pr

  6. Slide 6: Transaction summary

    Transaction summary Structure Acquisition of Anatolia Energy Limited (“Anatolia”) by Uranium Resources, Inc. (“URI”) pursuant to a Scheme of Arrangement, with separate schemes for Anatolia shares, options and performance shares URI to apply for quotation on the ASX, with Anatolia shareholders provid

  7. Slide 7: Benefits for all shareholders

    benefits for all shareholders Potential Benefits delivered to Anatolia Shareholders Potential Benefits delivered to URI Shareholders Very significant increase in average daily trading liquidity Potential to reduce the upfront capital cost of developing the Temrezli Project through anticipated synerg

  8. Slide 8: Benefits for all shareholders

    benefits for all shareholders Potential Benefits to be Enjoyed by All Shareholders Strong potential synergies between Anatolia’s Temrezli Project and URI’s idle Rosita processing facility, and the value-add that URI’s experienced technical personnel can provide will deliver real value to all shareho

  9. Slide 9: Attractive offer price

    Attractive offer price The offer from Uranium Resources provides Anatolia shareholders with a strong premium to Anatolia’s trading price 9 Source: IRESS VWAP’s of each of Uranium Resources and Anatolia calculated as of each company’s last trade on June 2, 2015 (in the case of Uranium Resources) and

  10. Slide 10: A strongly supported offer

    A Strongly supported offer The merger is strongly supported by the Boards of each of Anatolia and URI, and major shareholders of both companies ^ Subject to there being no superior proposal, and subject to the Independent Expert opining that the Schemes are in the best interests of Anatolia sharehol

  11. Slide 11: Post-deal capitalisation

    Post-deal capitalisation 11 (in US$) Post Transaction URI URI Share Price (June 2, 2015) (1) $1.22 Current URI Shares O/S 29,777,989 Shares to be issued to Anatolia shareholders 20,377,872 URI Shares O/S post-transaction 50,155,861 Basic Market Cap $61,190,150 Cash and Liquid Investments(2) $10,519,

  12. Slide 12: Geographically diversified, identical ISR technology, CAPEX synergies

    12 Geographically Diversified Identical ISR technology in both Texas and Turkey Attractive CAPEX Synergies Geographical diversification

  13. Slide 13: Merged entity project pipeline

    merged entity project pipeline 13 Uranium Resources expects to dismantle and ship the Rosita processing plant equipment, which is currently on standby, to the Temrezli Project for synergistic savings. Roca Honda is pending divestment, subject to execution of definitive documentation, as announced in

  14. Slide 14: Outstanding leadership

    Outstanding leadership Christopher M. Jones, President, CEO and Director Joined in March 2013; more than 30 years of industry experience; licensed Professional Engineer (US and Canada) B.S. in Mining Engineering from South Dakota School of Mines and an MBA from Colorado State University Jeffrey L. V

  15. Slide 15: Strong Board governance

    Strong Board governance Terence J. Cryan Chairman Managing Director at Concert Energy Partners, a New York private equity and investment advisory firm. Chairman of the Board of Ocean Power Technologies, Inc., and he is a Board Leadership Fellow of the National Association of Corporate Directors. For

  16. Slide 16: Temrezli Project: High grade, low cost ISR project

    Temrezli Project 16 High Grade, Low Cost ISR Project Nearing development decision Pre-Feasibility completed February 2015 PFS Development Case: Average annual production of 800,000 pounds of uranium over 12 years Average cash operating costs of $16.89/ lb U3O8 JORC & Canadian NI 43-101 M&I resources

  17. Slide 17: Temrezli Project: Robust financial returns

    Temrezli Project 17 Robust Financial Returns Life of mine 12 years Annual Production (avg.) 0.8 Mlb U308 Upfront Capital Cost $41.0M Cash Operating Cost $16.89/lb Pre-Tax NPV (8%) $191.1M Free Cash Flow $345.5M Internal Rate of Return 65% Key financial metrics based on the Development Case as presen

  18. Slide 18: Development synergies

    Development synergies URI’s Rosita processing plant capable of producing 800,000lb U308 per annum Capital equipment at Rosita that is currently idle may be shipped to Turkey for the Temrezli development, providing potential for material capital cost savings for up to US$8 million Rosita was designed

  19. Slide 19: Why Turkey

    Why turkey 19 Energy Independence a High Priority Turkish Government supports the Temrezli Project Temrezli is Turkey’s only advanced uranium asset Temrezli’s Operation License granted in October 2013 Long mining history (nickel, gold, boron, chromium, coal, copper, etc) Transparent mining code Turk

  20. Slide 20: Mid-term ISR potential of Texas

    Mid term isr potential of texas Acquired ISR projects in South Texas, enhancing mid-term path to production Located near URI’s processing plants on standby for restart Prospective roll-front mineralization in sandstones amenable to in-situ recovery Completed Phase One exploration drilling1 at Butler

  21. Slide 21: Creating value from long-term assets

    Creating value from long-term assets LOI with Energy Fuels:1 Divesting Sections 8 and 17 and the Endy Claims at Roca Honda Consideration from Energy Fuels US$2.5M cash, US$375,000 value in Energy Fuels stock, 4% gross royalty on portions of Peninsula Energy’s Lance uranium ISR project under construc

  22. Slide 22: Relative value

    Relative value 22 (US$ in millions, except per share numbers) Market Cap M&I lbs (MM) Inferred lbs (MM) Price Total EV Stage Location Uranium Energy $2.97 $273 $257 32.4 43.3 ISR Producer, Conventional Projects U.S., Paraguay Energy Fuels (PF Uranerz) $4.54 $204 $228 91.1 31.8 Producer (ISR, Convent

  23. Slide 23: Temrezli PFS roadmap to production

    Temrezli pfs roadmap to production 23 2015 2016 PFS Completed – Feb 2015 Detailed Engineering & Well Field Design Plant Optimisation Assessment Environmental and Social Impact Assessment Permitting Project Finance & Hedging Plant Construction & Well Field Development Plant Commissioning & Uranium Pr

  24. Slide 24: Appendices

    24 Appendices

  25. Slide 25: Temrezli PFS operating costs

    Temrezli PFS Operating costs Achievement of the forecast operating costs would make Anatolia one of the lowest cost uranium producers globally Low cost structure underpins strong cashflow, even during times of depressed uranium prices Favorable project characteristics driving Temrezli low cost Shall

  26. Slide 26: Temrezli PFS capital costs

    Temrezli PFS capital costs 26 Capital Costs (US$M) EPCM & owner costs 5.0 Infrastructure 3.4 Central processing plant 14.3 Evaporation ponds 4.0 Well fields and Header houses 10.0 Capital cost contingency 4.3 Total Initial Capex $41.0 Sustaining Capital over Life of Mine $90.1 First uranium producti

  27. Slide 27: Pro-forma reserves and resources

    Pro-forma Reserves and resources 27 In Place Reserves in South Texas1,2 (at 31 Dec 2014) Property Short Tons Grade (% U3O8 ) In-Place Pounds Recovery Method Kingsville Dome 35,000 0.07 50,000 ISR Rosita 384,000 0.08 624,000 ISR Total 419,000 0.08 674,000 Footnotes to the Reserves table: The Company

  28. Slide 28: Contacts

    contacts 28 For more information, contact: www.uraniumresources.com www.anatoliaenergy.com.au Christopher Jones President and CEO Uranium Resources, Inc. Tel: 303-531-0470 Paul Cronin Managing Director Anatolia Energy Limited Phone: +44 7912 351 031 (UK) Phone: +61 428 638 201 (Australia) Email: pau

Uranium Resources — Merger or Acquisition (June 2015) on 6ix