Amplitude Energy Limited · ASX:AEL

Amplitude Energy — Cooper Energy NL — Investor Presentation (January 2004)

21 slides from Amplitude Energy's investor presentation, Jan 30, 2004

  1. Slide 1: Executive Chairman

    Executive Chairman \CooDe}r Wscoemenemeeon jEnergy NL

  2. Slide 2: History of Cooper Energy

    History of Cooper Energy Cooper Energy listed in March 2002 First discovery in late July 2002 1s' production early December 2002 2"¢ discovery July 2003, 3 discovery Sept 2003, 4 discovery October 2003 Emerging net cash flow of $4M-$6M Net production currently +700 bopd and forecast to approach 1,00

  3. Slide 3: Convertible Notes

    ertibleNotes BOM OT Deon nergy NL

  4. Slide 4: Introduction

  5. Slide 5: Board & Management

  6. Slide 6: Cooper Basin

    Cooper Basin infrastructure: Oil & Gas hub > Established access to markets > Infrastructure provides early cash flow » Meets all criteria for the Cooper Energy business model Pipelines - Processing me (E. Gas — 8

  7. Slide 7: PEL 92: Christies Discovery (25% interest)

  8. Slide 8: Cooper Basin

    Cooper Basin Tenement interests and infrastructure Warsion 4 10) Discovery) a

  9. Slide 9: Cooper Basin

    ~~ deferring optimum production » Possible pipeline incorporating Christies production

  10. Slide 10: Deferring optimum production

    Cooper Basin Summary: 2003 drilling program

  11. Slide 11: Cooper Basin

  12. Slide 12: Cooper Basin Summary: 2003 drilling program

    Christies completion — pre pump CCC icy 1 CAAA ee Fe 0 lt JEnergy NL

  13. Slide 13: Christies completion — pre pump

    No bigger in Australia! ee e 4 i Energy NL

  14. Slide 14: No bigger in Australia!

    PEL 92 oil fairwa i Halla Faced te 3E Raven? tivt

  15. Slide 15: PEL oil fairway

    Cooper Basin TW PEL 92 : Christies area Standout targets in the PEL 92 oil fairway LPSOOO KILOMETRES: cer a Oc

  16. Slide 16: Cooper Basin: Christies area

    PEL 93: Worrior Potential oil in place: Proven and probable +3 million barrels (Namur, Birkhead, Hutton Oil) Multiple high flow rate zones Robust structure suggests production can be significantly enhanced from existing initial production wore Fault —1459~- Two way time contours (30% interest) © Dry

  17. Slide 17: PEL 93: Worrior

    ipeline plann ncrease production by 50-100% >» Probable 3D and further development drilling in 2004 ee ad nergy NL

  18. Slide 18: Pipeline planning

    1t subject to further exploration an discoveries in the region, close access to © infrastructure (25km)

  19. Slide 19: Cooper Basin

    Cooper Basin 2004 Drilling Program: March-April: PEL100 Acacia Grove April-July: PEL92 Sheringa and Silver Sands wildcats PEL92 Christies development wells October-December: PEL88 unnamed wildcat Currently reviewing other targets for late 2004

  20. Slide 20: Cooper Basin 2004 Drilling Program

    Summary >» Proven business model >» Excellent spread of drilling and acreage currently in Cooper Basin » Aggressive programs » Strongly leveraged to success » Company will have significant cash reserves >» Appointment of new CEO nergy NL

  21. Slide 21: Summary

    Worrior 1 — DST #3 (October 2003) JEnergy NL

Cooper Energy NL — Investor Presentation (January 2004) on 6ix