Amplitude Energy Limited · ASX:AEL
Amplitude Energy — Cooper Energy NL — Investor Presentation (January 2004)
21 slides from Amplitude Energy's investor presentation, Jan 30, 2004
Slide 1: Executive Chairman
Executive Chairman \CooDe}r Wscoemenemeeon jEnergy NL
Slide 2: History of Cooper Energy
History of Cooper Energy Cooper Energy listed in March 2002 First discovery in late July 2002 1s' production early December 2002 2"¢ discovery July 2003, 3 discovery Sept 2003, 4 discovery October 2003 Emerging net cash flow of $4M-$6M Net production currently +700 bopd and forecast to approach 1,00
Slide 3: Convertible Notes
ertibleNotes BOM OT Deon nergy NL
Slide 4: Introduction
Slide 5: Board & Management
Slide 6: Cooper Basin
Cooper Basin infrastructure: Oil & Gas hub > Established access to markets > Infrastructure provides early cash flow » Meets all criteria for the Cooper Energy business model Pipelines - Processing me (E. Gas — 8
Slide 7: PEL 92: Christies Discovery (25% interest)
Slide 8: Cooper Basin
Cooper Basin Tenement interests and infrastructure Warsion 4 10) Discovery) a
Slide 9: Cooper Basin
~~ deferring optimum production » Possible pipeline incorporating Christies production
Slide 10: Deferring optimum production
Cooper Basin Summary: 2003 drilling program
Slide 11: Cooper Basin
Slide 12: Cooper Basin Summary: 2003 drilling program
Christies completion — pre pump CCC icy 1 CAAA ee Fe 0 lt JEnergy NL
Slide 13: Christies completion — pre pump
No bigger in Australia! ee e 4 i Energy NL
Slide 14: No bigger in Australia!
PEL 92 oil fairwa i Halla Faced te 3E Raven? tivt
Slide 15: PEL oil fairway
Cooper Basin TW PEL 92 : Christies area Standout targets in the PEL 92 oil fairway LPSOOO KILOMETRES: cer a Oc
Slide 16: Cooper Basin: Christies area
PEL 93: Worrior Potential oil in place: Proven and probable +3 million barrels (Namur, Birkhead, Hutton Oil) Multiple high flow rate zones Robust structure suggests production can be significantly enhanced from existing initial production wore Fault —1459~- Two way time contours (30% interest) © Dry
Slide 17: PEL 93: Worrior
ipeline plann ncrease production by 50-100% >» Probable 3D and further development drilling in 2004 ee ad nergy NL
Slide 18: Pipeline planning
1t subject to further exploration an discoveries in the region, close access to © infrastructure (25km)
Slide 19: Cooper Basin
Cooper Basin 2004 Drilling Program: March-April: PEL100 Acacia Grove April-July: PEL92 Sheringa and Silver Sands wildcats PEL92 Christies development wells October-December: PEL88 unnamed wildcat Currently reviewing other targets for late 2004
Slide 20: Cooper Basin 2004 Drilling Program
Summary >» Proven business model >» Excellent spread of drilling and acreage currently in Cooper Basin » Aggressive programs » Strongly leveraged to success » Company will have significant cash reserves >» Appointment of new CEO nergy NL
Slide 21: Summary
Worrior 1 — DST #3 (October 2003) JEnergy NL
Cooper Energy NL — Investor Presentation (January 2004) on 6ix