Empyrean Energy Plc · LSE:EME

Empyrean Energy — Shareholder Meeting (September 2014)

17 slides from Empyrean Energy's shareholder meeting presentation, September 2014

  1. Slide 1: Empyrean Energy Annual General Meeting 2014

    Empyrean Energy LLC ANNUAL GENERAL MEETING 2014

  2. Slide 2: Project Locations

    Project Locations San Joaquin, California – Eagle Oil Project Onshore Texas – Riverbend Project, 800 Bcfe potential Onshore Texas Gulf Of Mexico – Sugarloaf Project, Blocks A and B 2 © Empyrean Energy Plc

  3. Slide 3: Geologic Overview: Eagle Ford Shale

    Geologic Overview Eagle Ford Shale  Upper Cretaceous, highly organic black shale punctuated with intervals of fractured limestones, calcareous shale and bentonite  Deposited during the global scale, Cenomanian-Turonian anoxic event – a time of world-wide high organic production  Disconformably ov

  4. Slide 4: Land

    Land Overview  Empyrean’s Sugarloaf AMI leasehold consists of a 3.0% working interest in approximately 25,397 gross (24,081 net, 722 company net) acres  100% held by production  Average 75% net revenue interest  Marathon is in the process of refining AMI unit boundaries to further optimize horiz

  5. Slide 5: Geologic Overview: Greater Eagle Ford/Austin Hydrocarbon System

    Geologic Overview Greater Eagle Ford/Austin Hydrocarbon System • Produces primarily from the Eagle Ford Shale and Austin Chalk and is one of the most prolific petroleum provinces in the US • Productive fairway extends from the Rio Grande River to beyond the Mississippi River • The Austin Chalk fairw

  6. Slide 6: Operations: Sugarloaf AMI Operations Overview

    Operations Sugarloaf AMI Operations Overview • Marathon has announced successful down-spacing results in both the Eagle Ford Shale and Austin Chalk and intends to co-develop the Austin Chalk with the Eagle Ford Shale • Marathon plans to drill 100 to 110 new wells in 2014 • In the Eagle Ford Shale, i

  7. Slide 7: Operations: Sugarloaf AMI Operations Overview

    Operations Sugarloaf AMI Operations Overview • Marathon’s current operations are focused on capital and operating efficiencies leading to optimized resource recovery • Top quartile drilling performance • Increasing recovery factors through improved completion efficiencies • Driving down unit costs a

  8. Slide 8: Texas Eagle Ford Shale Condensate Production

    Texas Eagle Ford Shale Condensate Production 2006 through 2011 • Upper Eagle Ford prospective across Karnes and Atacosa acreage • Pilot testing extends Austin Chalk/Lower Eagle Ford success • Testing vertical density in large hydrocarbon column to drive further recovery • Designed to optimize co- de

  9. Slide 9: Austin Chalk Co-Development Area Map

  10. Slide 10: Sugarloaf AMI Reserves

    Sugarloaf AMI Revised Reported as at Increase (EME 3%, net 2.25% 31 Dec 2013 1 Sept 2012 % after royalties) MMboe MMboe 1P Reserves 3.54 2.32 53 2P Reserves 6.52 4.40 48 3P Reserves 8.92 New New 2C Contingent 3.87 New New Resources 2P + 2C 10.39 New New

  11. Slide 11: Barrels of Oil Equivalent

    Barrels of Natural Oil & Oil Gas Sales Gas NPV(10)US$ Condensate Equivalent Liquids MMcf million MBBLS MMboe MBBLS 1P 1,542 835 6,999 3.544 52.9 Reserves 2P 2,649 1,636 13,420 6.521 97.0 Reserves 3P 3,486 2,302 18,768 8.915 139.5 Reserves 2C 1,094 1,189 9,509 3.868 -

  12. Slide 12: Operations: Sugarloaf AMI Operations Overview

    Operations Sugarloaf AMI Operations Overview • Marathon continues to test stimulation designs to improve well performance • “Zipper” stimulations from pads materially impacting fracture complexity and improving recovery • Fluids, volumes, rates, cluster spacing and proppant volumes are evolving with

  13. Slide 13: Current Production and Capacity by Central Facility

    Current Oil Current Gas Gas Capacity Oil Capacity Central Facility Production Production (MSCFD) (MSCFD) (BOPD) (BOPD) E Sugarloaf ~19,000 ~5,500 27,000 10,000 W Sugarloaf ~28,000 ~9,500 30,000 10,000 S Sugarloaf ~42,000 ~7,500 60,000 10,000 Sugarhorn ~17,000 ~8,500 25,000 15,000 Total ~106,000 ~31,

  14. Slide 14: Operations: Facilities Overview

     There are currently four central processing facilities on the Sugarloaf AMI  The typical central processing facility is expandable, and includes oil separation, treatment and storage facilities, water storage, and gas processing and compression facilities  Two additional central processing facil

  15. Slide 15: Operations: Product Marketing Overview

     Commodities are marketed by Marathon on behalf of Empyrean  Marathon oil price is based on Louisiana Light Sweet (“LSS”), and trades at a premium to WTI  Marathon’s gas price is based on Henry Hub  All gas is processed and NGL pricing is based on Mont Belvieu Operations Product Marketing Overvi

  16. Slide 16: Summary

    Summary  A non-operated working interest position in one of the most prolific producing areas of the world-class Eagle Ford Shale  Marathon Oil, the operator, is dedicated to aggressively developing the acreage (100+ gross wells planned for 2014), improving well performance and reducing well and o

  17. Slide 17: Eagle Oil Project (California, USA)

    Eagle Oil Project (California, USA) 58.084% Working Interest Valuable future project for the Company with large equity position  Eagle north-1 well: 13.4 metres net pay from a gross 21 metres in the vertical well in the target sands  Mechanical failure prevented a commercial test of the horizontal

Empyrean Energy — Shareholder Meeting (September 2014) on 6ix