Sinclair Gold Ltd · ASX:SGC

Sinclair Gold — Alicanto Minerals — PDAC International Convention 2017

16 slides from Sinclair Gold's conference presentation, Mar 5, 2017

  1. Slide 1: Investor Presentation PDAC Convention - Toronto, Canada

    ASX ANNOUNCEMENT & MEDIA RELEASE 3 March 2017 ALICANTO MINERALS LIMITED Investor Presentation PDAC Convention - Toronto, Canada CAPITAL STRUCTURE Alicanto Minerals Ltd (ASX: AQI) (“Alicanto” or “the Company”) cordially invites Shares on Issue 84.7m any attendees at the Prospectors & Developers Assoc

  2. Slide 2: A Regional Scale Gold Project

    A L I C A N T O MI NE RALS L IMI TE D A Regional Scale Gold Project Guyana | South America ASX Code | AQI

  3. Slide 3: General Information & Disclaimer

    A L I C A N T O MI NE RALS L IMI TE D General Information & Disclaimer This presentation has been prepared for the purposes of providing information to the recipient regarding Alicanto Minerals Limited (Alicanto or the Company). It does not, and does not purport to, contain all the information that

  4. Slide 4: Capital Structure, Board and Management

    A L I C A N T O MI NE RALS L IMI TE D ASX Code: AQI 0.50 3000 Shares on issue 84.7m 0.45 Current Share Price A$0.19 0.40 2500 Current Market Capitalisation A$16.1m 0.35 2000 Volume (000's) Top 20 Holders +68% Share Price (A$) 0.30 Board & Management +20% 0.25 1500 0.20 Experienced Board and Technica

  5. Slide 5: Guiana Shield is very underexplored relative to West Africa

    A L I C A N T O MI NE RALS L IMI TE D  Geological continuity between Guiana Shield and West Africa  Mining friendly Government West Africa host to over 275Moz Au  Open to foreign Investment substantial portion discovered in last 15 years  Social Licence to Operate Guiana Shield is VERY underexpl

  6. Slide 6: Project Infrastructure and Access

    A L I C A N T O MI NE RALS L IMI TE D Port Kaituma - Deep Water Port 15km from Arakaka Gold Project Arakaka Gold Project  All Season Road Network  Daily Commercial Flights  River Port - Arakaka  Existing 55 Man Camp Ianna Gold Project  Existing Air Strip, 45 min flight  Roads and Drill Access

  7. Slide 7: Barrick Earn-in to 65% of Arakaka Gold Project

    A L I C A N T O MI NE RALS L IMI TE D Option to earn-in to a 65% interest in the Arakaka Gold Project based on meeting total funding requirements of US$10.0 million, including;  US$2.5m budget including 7,500m drilling for 2017, approved for 2nd year expenditure, and counts towards a total;  US$8.

  8. Slide 8: MI NE RALS L IMI TE D

    A L I C A N T O MI NE RALS L IMI TE D 14-Mile Area 5 km Pepperpot Area 4m @ 21.08g/t Au 5.1m @ 3.97g/t Au from 71m 9m @ 1.89g/t Au 9.7m @1.44 incl. 2m @ 5.23g/t Au 7m @ 1.81g/t Au 2m @ 4.17g/t Au (end of hole) Purple Heart Area Multiple Un-drilled Prospects 13.5m @ 7.36g/t Au from 87m 48m @ 1.84g/t

  9. Slide 9: 2016 Drilling Summary

    A L I C A N T O MI NE RALS L IMI TE D 2016 DRILLING SUMMARY Three Parallel Mineralised Structures Identified Multiple Occurrences of Free Gold in Drilling Drilling confirms up to 1.5km width and 5km strike within drilled area Potential for >30km combined strike extent of Targets ASX Code | AQI www.a

  10. Slide 10: Exploration includes auger sampling and open-ended soil anomalism

    A L I C A N T O MI NE RALS L IMI TE D Exploration includes auger sampling and open-ended soil anomalism ■ Peak Trench Value: 6m @8.33g/t Au ■ Peak Rock Chip Values: 162g/t Au, 33.7g/t, 27.5, 28.1g/t Au ■ Peak Auger Values: 10g/t, 3.7g/t, and 2.8g/t Au ■ Peak Soil Values: 6.9g/t, 2.09g/t, and 1.89g/t

  11. Slide 11: Insufficient Drilling, Newly Identified High Grade Targets

    A L I C A N T O MI NE RALS L IMI TE D Insufficient Drilling Newly Identified High Grade targets 5 km Undrilled ■ >20km of alluvial placer workings sourced from Eyelash ■ Multiple saprolite pits up to >600m long ■ Numerous underground workings ■ Peak Soil Values: 6.9g/t, 2.09g/t, and 1.89g/t Au Peak

  12. Slide 12: Ianna Gold Project Highlights

    A L I C A N T O MI NE RALS L IMI TE D Highlights include: N ■ Ianna hosts two extensive mineralised corridors delivering “Walk up” drill targets 10km extending over 7km of strike extent. Kings Ransom Target ■ Historical drilling has already delivered Area: RC Drilling to: multiple ore grade intersec

  13. Slide 13: Ianna Prospects: Bushmaster and Labaria

    A L I C A N T O MI NE RALS L IMI TE D ■ Over 12,400m’s Reverse Circulation and Soil Sampling to 926m’s Diamond drilling historically Bushmaster Prospect 66.86g/t Au Undrilled 1km ■ Limited strike extent drilling remaining Money Pit: N open along strike Undrilled ■ ~95% of drilling testing continuity

  14. Slide 14: Arakaka Gold Project 2017 Exploration Program

    A L I C A N T O Arakaka Gold Project US$2.5m approved 2017 expenditure MI NE RALS L IMI TE D  Arakaka Drilling Campaign - 7,500m o ~2,000m diamond drilling - 14 mile reconnaissance In Progress o Prospect rating and ranking March - April o ~1,000m Initial drill test at Xenopsaris April o ~4,000m dri

  15. Slide 15: Summary

    A L I C A N T O MI NE RALS L IMI TE D ■ Arakaka Gold Project – Currently progressing a 7,500m drilling program for 2017 ■ Total funding requirement of US$10m over four years for Barrick to acquire a 65% interest in Arakaka o Barrick funded exploration program: US$2.5m in 2017 o Alicanto the project

  16. Slide 16: Contact Details

    A L I C A N T O MI NE RALS L IMI TE D Registered Office Guyana Office 288 Churchill Avenue 63 Middle and Main Street, Subiaco WA 6008 North Cummingsburg, Georgetown, Guyana Telephone:+ 61 8 6489 0700 Facsimile: + 61 8 6489 0710 Email: admin@alicantominerals.com.au Website: www.alicantominerals.com.a

Alicanto Minerals — PDAC International Convention 2017 on 6ix