Alkane Resources Ltd · ASX:ALK

Alkane Resources — Alkane Exploration — Shareholder Meeting (May 2005)

48 slides from Alkane Resources's shareholder meeting presentation, May 26, 2005

  1. Slide 1: Annual General Meeting Operations Presentation

    LKANE EXPLORATION LTD ABN 35 000 689 216 ANNUAL GENERAL MEETING Operations Presentation 26 May 2005

  2. Slide 2: Central West - New South Wales

    Central West - New South Wales LKANE

  3. Slide 3: Central West NSW Projects

    Dubbo Central West Bodangora Au-Cu Tomingley Au NSW Dubbo Wellin gton Wellington Cu-Au Peak Hill Au-Cu Rockley Gulgong Projects Junee Molong Volcanic Volcanic Belt Na rrowmine NORTHPARKES Belt Volcanic Parkes Molong Cu-Au Belt Orange Cudal Cu-Au Bathurst Forbes CADIA Moorilda Au-Cu COWAL Younger gra

  4. Slide 4: Peak Hill Gold Mine

    PEAK HILL GOLD MINE Conventional Open Cut Mining Agglomeration Heap Leach recovery of gold Production Commenced 1996 at Capital Cost $5 million 1996-2005 Output 153,000 ounces Cash Operating Surplus $15 million 100,000-500,000 ounces in sulphide deposit from 100m to 300m moderately refractory ore –

  5. Slide 5: Peak Hill Gold Mine rehabilitation

    PEAK HILL GOLD MINE Rehabilitation program Heap pads Waste rock emplacement commence complete July 2005 Open pits Complete OCE LKANE

  6. Slide 6: Tomingley Gold Project Regional Outcrop Geology

    Tomingley Gold Project Regional Outcrop Geology Cover Wyoming Hervey Group Myalls United Dulladerry Rhyolite Yeoval Granite Forbes Group Mungincoble Chert Cotton Formation Goonumbla (Mingelo) Volcanics LKANE

  7. Slide 7: Tomingley Gold Project Wyoming History

    TOMINGLEY GOLD PROJECT Wyoming History Acquisition: Separate production royalties Compass March 2001; Golden Cross August 2001; Climax January 2004 Area: 366km2 Drilling: First intercept May 2001 – Wyoming One 2001 – 13,939m (223) - exploration 2002 – 24,871m (279) – evaluation - Wyo Three discov Ju

  8. Slide 8: Wyoming Geological Summary

    Wyoming Geological Summary Pelitic sediments Feldspar porphyry Volcaniclastic sediments Andesite lava Chlorite-talc schist Mineralisation LKANE

  9. Slide 9: Wyoming One Simplified

    Wyoming One Simplified Interpretation 376 Structure Pelitic sediments Volcaniclastic sediments Feldspar porphyry 200m RL (-70m) Feldspar porphyry 100m RL (-170m) Feldspar porphyry 0m RL (-270m) Alkane drillhole till end 2002 Alkane drillhole 2003 LKANE

  10. Slide 10: Wyoming One North-South Section

    21 Wyoming Y8 W One North – South 85m @ 2.15g/t Au Section 9m @ 12.45g/t Au 614075mE 6m @ 9.53g/t Au 12m @ 6.22g/t Au Alluvium 12.5m @ 7.88g/t Au Volcaniclastic sediments Feldspar porphyry 18.4m @ 5.74g/t Au 7.2m @ 11.06g/t Au Mineralisation 4.1m @ 4.59g/t Au LKANE

  11. Slide 11: Wyoming One East-West Section

    Wyoming 8m @ 3.24g/t Au One 7m @ 3.52g/t Au 5m @ 0.93g/t Au East - West 10m @ 2.91g/t Au 3m @ 3.85g/t Au Section 4m @ 2.27g/t Au 32m @ 1.75g/t Au 4m @ 2.56g/t Au 6393300mN 23m @ 2.08g/t Au Alluvium Pelitic sediments 17m @ 4.72g/t Au Feldspar porphyry 9m @ 6.70g/t Au Volcaniclastic sediments Volcanic

  12. Slide 12: Wyoming One 3D Model

    Wyoming One 3D Model LKANE

  13. Slide 13: Tomingley Gold Project Resource Summary

    TOMINGLEY GOLD PROJECT Resource Summary Wyoming One and Three Dec` 04 0.75g/t gold cut off Measured 4.835 mt @ 2.24g/t gold 348,350 oz 58% Indicated 1.025 mt @ 2.76g/t gold 91,000 oz 15% Inferred 1.270 mt @ 4.09g/t gold 167,000 oz 27% TOTAL(0.75) 7.130 mt @ 2.70g/t gold 606,350 oz 100% LKANE

  14. Slide 14: Wyoming Development Summary

    TOMINGLEY GOLD PROJECT Wyoming Development Summary Current program: Remodelling of ore system optimise open pit grade Examine u/g options based on high grade shoots Drilling down dip - down plunge extensions at Wyoming One, initially in HWZ Additional drilling to target high grade zones in the Wyomi

  15. Slide 15: Wyoming One Hangingwall

    Wyoming One Hangingwall gram/metre contours WY 822D Recent hole 12m @ 3.45g/t Planned hole 4m @ 5.37g/t LKANE

  16. Slide 16: Wyoming One '376' Structure

    Wyoming One ‘376’ Structure gram/metre contours LKANE

  17. Slide 17: Wyoming One Conceptual Pit and Underground Development

    Wyoming One Conceptual Pit and U/G development 3D Model LKANE

  18. Slide 18: pmd CRC Numerical modelling of Wyoming One porphyry

    pmd CRC Numerical modelling of the Wyoming One porphyry and generic porphyry shapes Peter Schaubs May 2nd, 2005

  19. Slide 19: Project Goals

    predictive redictive mineral ineral discovery iscovery Project Goals pmd CRC • “Reverse engineer” Wyoming One so that a predictive understanding of vein distribution is gained • Predict fracture and vein distribution around other idealised porphyry bodies to guide future drilling efforts

  20. Slide 20: Objectives - Stage 1

    predictive redictive mineral ineral discovery iscovery Objectives - Stage 1 pmd CRC • Reverse engineering Wyoming One: mechanical modelling tests on various parameters (geometry, rock properties, pore pressure gradients etc) using the simplified shape of the Wyoming One porphyry in a uniform host ro

  21. Slide 21: Wyoming One Models - scenarios

    predictive redictive mineral ineral discovery iscovery Wyoming One Models - scenarios pmd CRC • Porphyry and matrix only – 080, N-S, NE-SW, NW-SE contraction – Dextral and sinistral strike slip deformation • With 376 structure • With Hanging Wall structures • Extended 75 m downplunge • Extended 75 m

  22. Slide 22: Tomingley Gold Project Regional Exploration

    Tomingley Gold Project 3m @ 4.59g/t Au 102m @ 0.66g/tAu 12m @ 1.52g/t Au 3m @ 2.22g/tAu Regional Exploration 6m @ 2.25g/t Au 7m @ 3.22g/t Au 6m @ 2.03g/tAu 66,500oz from two reefs average grade 8g/t Au Mined over 450m to a 2m @ 4.17g/t Au depth of 230m 18m @ 1.38g/t Au 3m @ 5.02g/tAu LKANE

  23. Slide 23: Wellington Bodangora Project Location

    Wellington Dubbo Bodangora Bodangora Wellin gton Wellington Project Rockley Gulgong Volcanic Belt Location Molong Junee Volcanic Na rrowmine Belt Parkes Volcanic Belt Orange Forbes Bathurst Younger granites Monzonitic intrusions Ordovician arc volcanics Fifield complexes LKANE

  24. Slide 24: Wellington Bodangora Regional Geology

    Wellington Bodangora Comobella 18m 18m@ @0.95g/t 0.95g/tAu, Au,0.15%Cu 0.15%Cu Regional EL4022 450m 450mxx150m 150mAu Au++Cu Geology Cu Bodangora Bodangora 0.2M oz target +0.5M oz Great Australian Basin Permian sediments EL5493 Wellington Federal Carboniferous granite Devonian – Silurian sediments a

  25. Slide 25: Wellington Project Galwadgere Geological Interpretation

    Wellington Project Galwadgere Geological Interpretation with Recent Resource Drill Holes LKANE

  26. Slide 26: Galwadgere October 2004 RC Drill Holes

    Wellington Project Galwadgere October 2004 RC Drill Holes LKANE

  27. Slide 27: Wellington Project Galwadgere Program

    WELLINGTON PROJECT Galwadgere Program Drilling: 4,030m RC/core tested ore system over strike length of 400m, completed to depth of 150m 50m sections to Indicated Resource status Further drilling to be scheduled Resource: 2.09Mt @ 0.99% copper and 0.30 g/t Gold Scoping study: Basic open pit concept a

  28. Slide 28: Orange Area Regional Geology

    Orange Area 1m @ 3.36g/t Au and 0.65% Zn 1m @ 3.36g/t Au and 0.65% Zn 1m @ 9.69g/t Au and 0.20% Zn Regional 1m @ 9.69g/t Au and 0.20% Zn 1m @ 9.91g/t Au and 0.56% Cu 550m x 150m porphyry 1m @ 9.91g/t Au and 0.56% Cu 550m x 150m porphyry 48m @ 0.31g/t Au 0.35 % Cu 48m @ 0.31g/t Au 0.35 % Cu Geology 3

  29. Slide 29: Central West Conceptual Development

    Wyoming 1 & 3 Bodangora Central West 600,000 ozs Dubbo Dubbo Historic 0.2M oz Target +0.5Moz Conceptual Tomingley Wellington Hub Wellin gton Peak Hill Development Peak Hill Rockley Gulgong Galwadgere Volcanic Belt +20,000t Cu Hubs Northparkes Molong Peak HillJunee Sulphide +25koz Au Volcanic Na ozs

  30. Slide 30: Dubbo Zirconia Project Summary

    DUBBO ZIRCONIA PROJECT SUMMARY • One of the worlds largest zirconium, yttrium and tantalum resources (+ 100 million tonnes) - also contains significant niobium and rare earth elements • Project based upon large Jurassic aged alkaline volcanic complex with highly metal enriched vertical trachyte intr

  31. Slide 31: Dubbo Zirconia Project Site and Infrastructure Location

    DUBBO ZIRCONIA PROJECT Project Site and Infrastructure Location

  32. Slide 32: Dubbo Zirconia Project Resources

    DUBBO ZIRCONIA PROJECT RESOURCES Measured Resource : 35.7 million tonnes grading 0 - 55 metres 1.96% Zr02, 0.04%HfO2, 0.14% Y 2O3 0.46% Nb2O5, 0.03% Ta2O5 and 0.75% REO Inferred Resource : 37.5 million tonnes at similar grades 55 - 100 metres TOTAL : 73.2 million tonnes LKANE

  33. Slide 33: Dubbo Zirconia Project Process Flow Sheet

    DUBBO ZIRCONIA PROJECT PROCESS FLOW SHEET LKANE LKANE

  34. Slide 34: Structure of the Zirconia Industry

    DUBBO ZIRCONIA PROJECT Structure of the Zirconia Industry RAW MATERIALS PROCESSED PRODUCTS END USES BADDELYITE ZIRCONIA PRODUCTS (Generally increasing purity) (5000 tonnes) FUSED Refractories ZIRCONIA Ceramic Pigments CHEMICAL Glass/Gemstones PURIFICATION Catalysts ZIRCON Oxygen Sensors SOFC (60000

  35. Slide 35: Dubbo Zirconia Project Current Strategy

    DUBBO ZIRCONIA PROJECT Current Strategy Lack of action from Astron has resulted in termination of JV Alkane in discussions to float 50% of AZL (the holding subsidiary) or enter into new JV with existing producer/end user Raise/inject sufficient capital to complete process optimisations, and construc

  36. Slide 36: Western Australian Projects

    Western Australian Projects Nullagine Nullagine and Leinster Leinster JV LKANE

  37. Slide 37: Leinster Area Jubilee Mines JV

    WESTERN AUSTRALIAN MT KEITH PROJECTS Leinster Area McDONOUGH LOOKOUT Jubilee Mines JV MIRANDA 9m 9m@ @0.51% 0.51%Ni Ni WELL 0.15m 0.15m@@2.9% 2.9%NiNi 0.2m 0.2m@@8.1% 8.1%Ni Ni 10km 10kmkomatiite komatiite LEINSTER DOWNS Four Fourchannel channelzones zones LEINSTER 0.5-1.0% 0.5-1.0%Ni Niover over+m+

  38. Slide 38: Nullagine

    Nullagine Nullagine LKANE

  39. Slide 39: Nullagine Project satellite image

    Nullagine Project – satellite image Nullagine Bonnie Creek Palaeochannel LKANE

  40. Slide 40: Nullagine Project Bonnie Creek System

    Nullagine Project Bonnie Creek System Channel Iron Deposits NULLAGINE LKANE

  41. Slide 41: Nullagine Project Bonnie Creek Palaeochannel

    Nullagine Project – Bonnie Creek Palaeochannel Mesa deposits LKANE

  42. Slide 42: Nullagine Project Bonnie Creek Iron Deposit

    Nullagine Project – Bonnie Creek Iron Deposit Residual mesa deposit LKANE

  43. Slide 43: Nullagine Project Bonnie Creek Mesa CID

    Nullagine Project Bonnie Creek Mesa CID LKANE

  44. Slide 44: Nullagine Project Robe River CID Deposits

    Nullagine Project – Robe River CID Deposits Typical residual mesa deposit LKANE From Robe River Iron Associates web site www.roberiver.com

  45. Slide 45: Nullagine Project Tertiary Palaeochannel

    Nullagine Project - Tertiary Palaeochannel Bonnie Well Drill Traverse LKANE

  46. Slide 46: Nullagine Project Channel Iron Deposits

    Nullagine Project Channel Iron Deposits Bonnie Creek System Potential 150 - 220M tonnes CID pisolite iron 58.48 57.28 58.57 Surface sampling 58.27 55.56 Fe Si02 Al2 O3 P LOI Fe (C) 58 3.23 3.95 0.03 9.07 63 59.83 Robe River CID Ore 57.87 Fe Si02 Al2 O3 P LOI Fe (C) 57 5.50 2.50 0.04 9.20 63 58.13 Av

  47. Slide 47: Nullagine Project Location and Rail Corridors

    Nullagine Project Location and Rail Corridors Nullagine LKANE From Fortescue Metals Group web site www.fmgl.com.au

  48. Slide 48: Alkane Strategy 2004-06

    ALKANE STRATEGY 2004-06 Strategic focus remains on Central West Region in New South Wales with the aim of developing a resource inventory and substantial production output. Centralise operations management GOLD: to build a 100,000 oz per year or cash flow equivalent with copper, output based upon pr