Tivan Limited · ASX:TVN

Tivan — TNG — Zinc Conference 2007

17 slides from Tivan's conference presentation, Jul 3, 2007

  1. Slide 1: Presentation to Zinc Conference in Sydney

    Slide 1: Presentation to Zinc Conference in Sydney

    PRESENTATION TO ZINC CONFERENCE IN SYDNEY 3 July 2007 TNG LTD (ASX: “TNG”) today announces that Paul Burton, the Company’s Exploration Manager, will be delivering the latest Company presentation at the Zinc Conference at the Radisson Plaza Hotel in Sydney today. The presentation is attached to this

  2. Slide 2: Manbarrum Zinc-Lead-Silver Project

    Slide 2: Manbarrum Zinc-Lead-Silver Project

    TNGLIMITED MANBARRUM PROJECT The Manbarrum Zinc-Lead-Silver Project Bonaparte Basin, NT, Australia Presented by Neil G Biddle Managing Director TNG Ltd

  3. Slide 3: Corporate

    Slide 3: Corporate

    CORPORATE Chairman John W Barr Managing Director Neil G Biddle Non-Exec Director Michael Bowen Non-Exec Director Edward Fry Non-Exec Director Terry Smith Shares on Issue 182 m ASX: TNG Cash on hand $10.0m Major Share Holders Directors 16.7% ANZ 14.7% CBH 8.0% RAB 7.7% Top 20 Shareholders hold 61% of

  4. Slide 4: Asset Summary

    Slide 4: Asset Summary

    ASSET SUMMARY CAWSE EXTENDED NICKEL PROJECT Managed by Norilsk Nickel TNG 20% free carried or 2% NSR Resource 84Mt @ 0.84% NiEq for 690,000t contained Ni Large income potential in short-medium term NORTHERN TERRITORY PROJECTS Manbarrum Zinc-Lead-Silver Rover Gold-Zinc-Copper Petermann Ranges Gold-Co

  5. Slide 5: NT Projects

    Slide 5: NT Projects

    ‘MANBARRUM 2n= Pb-Ag WGoddards | & cu 3 Alice Springs Ee Petermans “Au - Cu -U

  6. Slide 6: Location & Logistics

    Slide 6: Location & Logistics

    LOCATION & LOGISTICS • Large tenement position 100% TNG • Weaber Gas Field 10km • Kununurra 82km by SORBY road • Wyndham Port 180km by road • Darwin 400km by air

  7. Slide 7

    Slide 7

  8. Slide 8: 2007 Exploration Objectives

    Slide 8: 2007 Exploration Objectives

    2007 EXPLORATION OBJECTIVES Sandy Creek Main Zone Drill out and upgrade resource to measured status Complete metallurgical, geotechnical, environmental to prefeasibility standard Regional Demonstrate multiple MVT deposits by RC drilling advanced targets at NEIP, Browns, Djibitgun and Landandi Upgrad

  9. Slide 9: 2007 Exploration

    Slide 9: 2007 Exploration

    ENVIRONMENTAL 2007 EXPLORATION Baseline study flora, fauna & water Ongoing monitoring 10,000m DIAMOND DRILLING Sandy Creek Resource Infill, Metallurgical, Geotechnical Winchrope IP SURVEY Detailed survey from Sandy Creek to Browns +20,000m RC DRILLING NEIP Sandy Creek extension Regional testing defi

  10. Slide 10: 2007 Exploration Budget + $8M

    Slide 10: 2007 Exploration Budget + $8M

    2007 Exploration Budget + $8M

  11. Slide 11: TNG Policy – Traditional Owners

    Slide 11: TNG Policy – Traditional Owners

    TNG Policy – Traditional Owners • Health and wellbeing of elders • Youth education • Elder and community consultation • Employment and certified training

  12. Slide 12: o> <o x 9 of A DP coh -ob.ot o% A gl? ge ge

    Slide 12: o> <o x 9 of A DP coh -ob.ot o% A gl? ge ge

    8297400 8297300 8297200 8297100 8297000 8296900 8296800 o> <o x 9 of A DP coh -ob.ot o% A gl? ge ge & & oo & & & & Orac®™ 2c & G G G yw ye R\3 R\ we we Ww gorge’ We yt yw We ye RS Unconformity§ || 1 == 8 ee a 0 Base of || Oxidation = eel -— i z SSS. —-7 7 _||. Base o f || Oxidation | . Se =o ee Sy |

  13. Slide 13: fetes A ¥)

    Slide 13: fetes A ¥)

    | 520500 520600 520700 520800 p fetes A ¥) _— of = ri ém@2.69% -50—- = -100— Sandy Dolomite 6m@5.49% = -150—- a Sandstones inl i -250 -300-

  14. Slide 14: Resource Estimation Model – Looking East

    Slide 14: Resource Estimation Model – Looking East

    Resource Estimation Model – Looking East 3D model

  15. Slide 15: Resource Estimation - Results

    Slide 15: Resource Estimation - Results

    Resource Estimation - Results Resource Category Tonnes Zn % Pb% Ag g/t ZnEq% Estimation Mt (Zn+Pb) Pipes Indicated 3.3 3.5 0.9 6.4 3.9 Inferred 2.1 4.6 0.3 4.1 4.7 Stratabound Indicated 3.8 1.9 0.7 5.2 2.3 Inferred 1.3 2.0 1.3 6.4 2.6 Grand Total 10.5 3.0 0.7 5.5 3.3 Supergene Indicated 0.2 1.2 5.1

  16. Slide 16: Loading Sally Malay nickel concentrates at Wyndham Port

    Slide 16: Loading Sally Malay nickel concentrates at Wyndham Port

    Loading Sally Malay nickel concentrates at Wyndham Port. Wyndham Port is 180 road km’s from Sandy Creek resource

  17. Slide 17: Corporate Summary

    Slide 17: Corporate Summary

    CORPORATE SUMMARY Address: Level 1 282 Rokeby Road Subiaco WA 6008 Telephone: + 61 8 9327 0900 Fax: + 61 8 9327 0901 Share Registry: Computershare Investor Services Level 2 Reserve Bank Building 45 St Georges Terrace Perth WA 6000 Contacts: Neil Biddle: Managing Director Mobile: +61 (0)418 915 752 n

Source: Internet Archive copy of tngltd.com.au

More decks from Tivan Limited

All 42 Tivan decks