Elixir Energy Limited · ASX:EXR

Elixir Energy — Discover Mongolia Conference 2019

22 slides from Elixir Energy's conference presentation, Sep 27, 2019

  1. Slide 1: Discover Mongolia Conference: Coal Bed Methane for Multiple Markets

    For personal use only ELIXIR ENERGY (ASX:EXR) Discover Mongolia Conference Coal Bed Methane for Multiple Markets 27 September 2019

  2. Slide 2: Important Notice & Disclaimer

    Important Notice & Disclaimer For personal use only This document has been prepared by Elixir Energy Limited (ABN 51 108 230 995) (“Elixir”) in connection with providing an overview of its business to interested analysts/investors. This presentation is being provided for the sole purpose of providin

  3. Slide 3: Company Overview

    Company Overview For personal use only Exploring for Coal Bed Methane (CBM*) in the South of Mongolia • Focused on the 100% owned Nomgon CAPITAL STRUCTURE Current (A$million) IX Coal Bed Methane (CBM*) Production Ordinary Shares (ASX:EXR) 487.2 Sharing Contract (PSC) project in the Unlisted Options

  4. Slide 4: Board of Directors

    Board of Directors For personal use only Highly experienced CSG team Richard Cottee Neil Young Stephen Kelemen Bayanjargal Non-Executive Chairman Managing Director Non-Executive Director Byambasaikhan Strategic Adviser • Former Managing Director • Former Business • Extensive technical and • Chairman

  5. Slide 5: Nomgon IX CBM PSC

    Nomgon IX CBM PSC For personal use only PSC gives long term and robust tenure over massive licence area • CBM PSC signed in September Exploration term 10 – 15 years 2018 with a 10 year+ exploration Production term 30 years + term Royalty 5 – 10 % • 100% ownership and no back-in Up to 40%. rights as

  6. Slide 6: Export Scale Acreage Package

    Export Scale Acreage Package For personal use only Extensive licence area and globally short pipeline distance Nomgon IX Gladstone GLNG Acreage Fairview 410km Roma 100km 100km West East Pipeline |6|

  7. Slide 7: Regulatory Approvals Completed

    Regulatory Approvals Completed For personal use only Significant work completed, exploration underway PSC executed APPROVALS SEQUENTIALLY Exploration Plan approved Baseline EIA approved SECURED Archaeological Study completed Paleontological Study completed Exploration licence awarded Detailed EIA &

  8. Slide 8: 2019 Exploration Program

    2019 Exploration Program For personal use only Timeline on track, history of delivery 2D Seismic 2019 Drilling Campaign Acquisition* (2 +1 wells) Q1 2019 Q2 2019 Q3 2019 Q4 2019 Various approvals Seismic Processing Gas Desorption secured & Seismic and Interpretation and Testing Planning complete 201

  9. Slide 9: Seismic Acquisition Completed

    Seismic Acquisition Completed For personal use only Targeted 2D seismic acquisition • Commenced seismic acquisition in August 2019 – finished in September • Partnered with Mongolian contractor Micro Seismic LLC - who has substantial experience in the region • Acquired 131 km of 2D seismic over key C

  10. Slide 10: Drilling Imminent

    Drilling Imminent For personal use only Two core holes scheduled, option for a third • First well (Ugtaal-1) due to spud late September/start of October • Elixir and Mongolian contractor Erdenedrilling LLC have sourced testing equipment and experienced personnel from the USA and Australia • Program

  11. Slide 11: Multiple Market Opportunities

    Multiple Market Opportunities For personal use only Nomgon PSC has multiple sources of potential demand • Proximity to China – the largest global importer of energy and mineral resources, a key strategic advantage for Mongolia • Multiple other market opportunities include: • Mongolia’s largest energ

  12. Slide 12: Next Door to China's Gas Market

    Next Door to China’s Gas Market For personal use only China has a rapidly growing appetite for gas • The Chinese Government plans to increase gas demand by 300% over the next 15 years • China imports gas from every direction and seeks to continually diversify its sources of supply • The Nomgon IX CB

  13. Slide 13: Gas to Electricity

    Gas to Electricity For personal use only Gas can generate electricity locally to supply the Nation • The Nomgon PSC contains considerable existing electricity transmission infrastructure • A large scale 220 kV line runs South from Ulaanbaatar to Oyu Tolgoi with substantial spare capacity • A 330 kV

  14. Slide 14: Oyu Tolgoi

    Oyu Tolgoi For personal use only Gas is an alternative power source for Oyu Tolgoi • Oyu Tolgoi required to seek power from within Mongolia under the Investment Agreement • Progress to date has been slow, with delays from various stakeholders • International financial institutions increasingly movin

  15. Slide 15: Gas & Renewables

    Gas & Renewables For personal use only The South Gobi hosts significant renewable resources • Maximising the benefits of Mongolia’s renewable resources (centered in the South Gobi) requires greater regional connectivity • Substantial progress is being made in promoting the “Asian Super Grid” with Mo

  16. Slide 16: Creating New Demand

    Creating New Demand For personal use only Cheap sources of gas attract new demand • Gas can be delivered to existing markets by pipeline or electricity networks • Cheap & large-scale gas resources attract new industries to co-locate • The Moranbah CBM field in North Queensland now hosts a large expl

  17. Slide 17: The Hydrogen Economy

    The Hydrogen Economy For personal use only Hydrogen is increasingly seen as a key tool to deal with climate change • In the long term, a green steel industry will require coking coal to be replaced with hydrogen • Hydrogen is not available naturally and needs to be created in a clean fashion to be a

  18. Slide 18: Investment Highlights

    Investment Highlights For personal use only Elixir has a highly favourable risk-reward profile • First CBM PSC in Mongolia, signed in 2018 with 10 year+ exploration term • High Quality Board & Management with history of success in CBM • Massive PSC with large prospective resources (Appendix 1) • Cap

  19. Slide 19: Contact Us

    For personal use only Contact Us INVESTORS & MEDIA Neil Young Managing Director neil.young@elixirenergy.net.au Phone +61 8 6001 6938 www.elixirenergy.net.au | 19 |

  20. Slide 20: Appendix 1: Independent Prospective Resource Report

    Appendix 1: Independent Prospective Resource Report For personal use only • First independent prospective resource report completed by ERC Equipoise Pte Ltd (ERCE) using 2018 SPE PRMS standards1 • Giant resource identified with Geological Risk likely to be significantly reduced following 2019 explor

  21. Slide 21: Appendix 2: The Bowen and South Gobi Basins Compared

    Appendix 2: The Bowen and South Gobi Basins Compared For personal use only PROPERTIES BOWEN BASIN SOUTH GOBI COMMENTS (QUEENSLAND) (MONGOLIA) Seam thickness Maximum single seam >55m found in multiple ü World class seam thickness and thickness 30m locations hence very high GIP per acre Gas content 7-

  22. Slide 22: Appendix 3: Road to Contingent Resource Booking

    Appendix 3: Road to Contingent Resource Booking For personal use only ACTIVITY OUTCOME RESOURCE CATEGORISATION UPON SUCCESS Geological Modelling 40 TCF unrisked) Recoverable Prospective Resource (Lead)1 COMPLETED (Best Case)* COS: 19% * Additional Data from Mineral More evidence of coal - COS could

Elixir Energy — Discover Mongolia Conference 2019 on 6ix