Iamgold Corporation · TSX:IMG
Iamgold — Investor Day (June 2010)
55 slides from Iamgold's investor day presentation, Jun 22, 2010
Slide 1: Africa
2) IAMGOLD’ CORPORATION AFRICA Member of World Gold Council www.gold.org
Slide 2: Africa: Business Environment
Africa: Business Environment June 22, 2010 Larry Phillips Executive Vice President, Corporate Affairs
Slide 3: Burkina Faso: Core Principles in Action
Burkina Faso: Core Principles in Action Consistency: Building meaningful, long- term relationships Credibility: Demonstrating transparency and developing good governance Blending Cultures: Benefiting from broad perspective of stakeholders 43
Slide 4: Essakane Mine Project
Essakane Mine Project June 22, 2010 Denis Miville-Deschênes Senior Vice President, Project Development
Slide 5: Essakane Location
Essakane Location MAURITANIA W. Africa Office ESSAKANE Dakar SENEGAL YATELA MALI NIGER GAMBIA SADIOLA Ouagadougou Bamako GUINEA BURKINA FASO BISSAU GUINEA BENIN SIERRA GHANA TOGO LEONE CÔTE D'IVOIRE LIBERIA DAMANG Project Location: Accra 350 km NE of the Capital Ouagadougou TARKWA Located in ari
Slide 6: Accelerated Construction
Accelerated Construction 46
Slide 7: An Overview of Essakane
An Overview of Essakane PROJECT OVERVIEW Essakane is the largest investment ever made in Burkina Faso Up to 30Mt mined per year Mill design 9.0 Mtpa soft rock; 5.4 Mtpa hard rock Est. 1,300 employees during operation (peaked at 3,500 during construction) Essakane, Burkina Faso, Africa IMG Ow
Slide 8: Objectives of the Project
Objectives of the Project Develop a ‘World Class’ Operation Build the project, on time, on budget Respect ‘Best Practices’ Apply Corporate Social Responsibility Create sustainable development for the population 48
Slide 9: Project Challenges
Project Challenges Location Landlocked African country – 1,200km from the coast Isolated rural area, 360km from the capital Country new to mining and foreign investment Long and challenging supply chain Populations Relocated more than 12,000 people from one town and 7 small villages into o
Slide 10: Construction Strategy
Construction Strategy Transition from EPCM contract to IMG Project Team Main Engineering consultants: Minproc Mill Engineering Wartsilla Power Plant Design Golder Tailings and water storage design, QA/QC of all civil works Replan Village relocation 50
Slide 11: Construction Strategy
Construction Strategy Direct hire of construction employees for concrete, structural steel, tanks and piping, mechanical, electrical and instrumentation installations Mine department in place early to construct earthwork, reservoirs, dams and tailings basin Construction supported by our own Se
Slide 12: Site Plan
Site Plan ~ | ee ay
Slide 13: Processing Equipment
Processing Equipment Process Conventional Carbon-In-Leach (CIL) gold recovery plant Nameplate capacity 7.5Mtpa increased to 9Mtpa Average gold recovery 94% (varies with ore type and grade) High gravity recovery (40% in feasibility study) Leach time 24h with oxides; 36h with fresh ore LOM
Slide 14: Infrastructure
Infrastructure 27.5MW power plant (5 HFO generators) Truckshop, mill workshop and maintenance infrastructure Two warehouses Fuel reservoirs with a total capacity of 6 million litres Offices, camp and facilities 100Mt capacity tailings pond Water retention dam and three water reservoirs
Slide 15: Attributable Reserves and Resources
Attributable Reserves and Resources 000s ounces *Indicated resources are inclusive of probable reserves 55
Slide 16: Mineral Reserves by Type
Mineral Reserves by Type Essakane* Cut-off Tonnage Grade Au Dec 31, 2009 (g/t) (‘000 t) (g/t) (‘000 oz) 0.35 EMZ Saprolite 16,984 1.2 655 0.37 FAL 0.45 EMZ Transition 18,252 1.3 752 0.47 FAL 0.56 EMZ Fresh Rock 48,000 1.6 2,451 0.58 FAL Total 83,620 1.4 3,871 *includes Falagountou EMZ = Essakane Mai
Slide 17: Gold
Gold ERC1078D (89-90) 2mm ERC 1052 (33-34) 2mm 57
Slide 18: Grade Control Drilling
Grade Control Drilling 58
Slide 19: Mining
Mining Loading Units 2 x 15m3 shovels 1 x 10m3 backhoe 2 x 12m3 wheel loaders Haulers 6 x 100t trucks (CAT 777) 14 x 140t trucks (CAT 785) Pre-production: Total tonnes mined: 20.5M Ore tonnes stockpiled: 5.0M at 1.0 g/t Cost per tonne to date: $1.47 (includes construction) $1.33 (min
Slide 20: Village Relocation
Village Relocation New Essakane town site plus five small villages More than 2,000 houses 12,000 people Maintained daily interactions and engagement with populations Resettlement was completed successfully, as planned, in March 2010 Sustainability programs underway 60
Slide 21: Health & Safety
Health & Safety A constant priority… Committed to international standards Inexperienced workforce and a challenging climate Huge focus on training Excellent performance with 10.7M hours worked and a frequency of 0.17 injuries per 200,000 hours worked 61
Slide 22: What's Next?
What’s Next? Mill start-up June 2010 Completion of crusher for September 2010 not required initially for soft saprolite feed Aggressive exploration and delineation program 62
Slide 23: Essakane - Exploration
Essakane - Exploration June 22, 2010 Michael Donnelly Senior Vice President, Exploration
Slide 24: Essakane
Essakane Essakane Inata Taparko Kalsaka Mana Youga Mesoproterozoic and Younger Birimian Sediments Birimian Volcanics Granite / Gneiss Gold Operation 64
Slide 25: Essakane: 2010 Exploration Objectives
Essakane: 2010 Exploration Objectives As > 100ppm Budget $1.9M expensed Exploration $12.3M capitalized Concessions: 1,283 km² Exploration 30,500m DD and RC drilling 25,000m Air Core drilling over sand covered areas Resource Delineation 50,000m DD drilling EMZ Test strike extensions
Slide 26: Essakane: Mine Infrastructure and Exploration Targets
Essakane: Mine Infrastructure and Exploration Targets EMZ north extension EMZ East Dump Au≥ 117 ppb (in soils) West Dump Lay down Offices Air Strip Falangountou TSF EMZ South extension 66
Slide 27: Essakane: Schematic Cross Section
Essakane: Schematic Cross Section SW NE 67
Slide 28: Essakane: Mine Lease Air Core Drilling
Essakane: Mine Lease Air Core Drilling Au≥ 117 ppb (in soils) Falangountou Air Core results pending Anomalous Au in saprolite outlined by Air Core drilling 68
Slide 29: Essakane: 2010 Resource Delineation
Essakane: 2010 Resource Delineation MEDD0026 Section 52600N 50,000 m in multi-phased program MEDD0031 2m @ 20.0g/t Au 85 DD holes and 155 RC holes planned 6m @ 11.9g/t Au MEDD0056 Multi-phase 2010 drilling program: MEDD0061 2m @ 11.4g/t Au MEDD0063 Phase 1 designed to extend mineralization M
Slide 30: Essakane 52,600N Cross Section
Essakane 52,600N Cross Section SW NE 13.5m @ 1.62g/t Au 31.5m @ 3.56g/t Au from 163.5m from 180m 4.5m @ 0.9g/t Au from 198m 100m 70
Slide 31: Essakane Regional Targets (Historic Results)
Essakane Regional Targets (Historic Results) As > 100ppm Takabangou Tin Taradat 52 holes - 3,718m 23 holes - 1,460m TKC0975: 6m @ 5.12g/t Au TTC1699: 2m @ 1.35g/t Au TKC0965: 5m @ 3.54g/t Au Gossey Tin Zoubaratan 96 holes - 6,732m 11 holes – 726m GRC0980: 12m @ 1.01g/t Au TZC1629: 4m @ 0.86g/t Au GR
Slide 32: Africa Operations
Africa Operations June 22, 2010 Gordon Stothart Executive Vice President & Chief Operating Officer
Slide 33: Sadiola, Mali
Sadiola, Mali IMG Ownership: 41% JV Partner: AngloGold Ashanti Reserves & Resources (oz) P&P Reserves1 1,457,000 M&I Resources2 2,596,000 Inferred Resources 1,159,000 Attributable Production (oz) 2010 Q1 30,000 ‘Back to Basics’ safety initiative 2009 135,000 2008 172,000 Promising results from $
Slide 34: Sadiola Sulphide Project
Sadiola Sulphide Project Soft ore mining from current pits scheduled to end in 2014 IMG Prefeasibility Study approved Oct. 2009 • Different ‘vision’ than AGA prior studies: owner mining, simpler processing, power from grid, higher gold price Finish Joint Feasibility Study in Nov. 2010 Negoti
Slide 35: Sadiola Sulphide Project
Sadiola Sulphide Project Resource definition drilling campaign (7,850m) Condemnation drilling campaign (2,900m RC) Inferred resources converted to measured and indicated New hard rock plant required to complement existing facility: • Flexible plant arrangement based on ore feed • Test work c
Slide 36: Yatela, Mali
Yatela, Mali IMG Ownership: 40% JV Partner: AngloGold Ashanti Reserves & Resources (oz) P&P Reserves1 44,000 M&I Resources2 126,000 Inferred Resources 19,000 Attributable Production (oz) 2010 Q1 27,000 Drilling extended mine life to at 2009 89,000 2008 66,000 least end of 2011 Exploring Yatela,
Slide 37: Tarkwa, Ghana
Tarkwa, Ghana IMG Ownership: 18.9% JV Partner: Gold Fields Ltd. Reserves & Resources (oz) P&P Reserves1 2,018,000 M&I Resources2 2,573,000 Inferred Resources 486,000 Attributable Production (oz) 2010 Q1 33,000 2009 125,000 Long life open pit mine 2008 119,000 CIL expansion finished in 2009 Cash
Slide 38: Damang, Ghana
Damang, Ghana IMG Ownership: 18.9% JV Partner: Gold Fields Ltd. Reserves & Resources (oz) P&P Reserves1 344,000 M&I Resources2 551,000 Inferred Resources 258,000 Attributable Production (oz) 2010 Q1 10,000 2009 38,000 2008 37,000 Aggressive exploration extended Cash Cost ($/oz) mine life to at lea
Slide 39: Mupane, Botswana
Mupane, Botswana IMG Ownership: 100% Reserves & Resources (oz) P&P Reserves1 199,000 M&I Resources2 266,000 Inferred Resources 80,000 Production (oz) 2010 Q1 13,000 2009 51,000 2008 101,000 Strong safety culture Cash Cost ($/oz) Positive operating cash flow 2010 Q1 $826 2009 $735 Lower head gr
Slide 40: West Africa - Exploration
West Africa - Exploration June 22, 2010 Michael Donnelly Senior Vice President, Exploration
Slide 41: West Africa 2010 Exploration Portfolio
West Africa 2010 Exploration Portfolio Essakane • Budget $4.5M • 20,500m exploration drilling Sadiola - Yatela • IMG contribution $4.5M • 18 month exploration initiative Siribaya JV • Budget $2.5M • 14,500m drilling Kalana JV • Budget $4.6M • 20,000m drilling 81
Slide 42: Mali: Sadiola/Yatela Overview
Mali: Sadiola/Yatela Overview Yatela lease …….Extend the current mine life 18 month exploration program commenced KW-18 Yatela 2009 - $14.9M budget Program designed to evaluate remaining oxide potential 31 targets identified and ranked Alamoutala Work Completed 77,000m DD and RC drilling –
Slide 43: Mali: Yatela / Sadiola Remaining Opportunities
Mali: Yatela / Sadiola Remaining Opportunities Yatela North Yatela NE New resources identified Yatela • KW-18 expansion Yatela Exploration Targets KW-18 Gravity anomalies • Yatela – in-pit resource expansion • Yatela N and NE – additional resources • Alamoutala – resource expansion Alamoutala • 4
Slide 44: Mali: Siribaya JV
Mali: Siribaya JV 2010 Budget - $2.5 million Senegal Guemedji Trend 848 km2 concessions Mali Boto Merrex - IMG Option Agreement (100% IMG) SiribayaTrend signed December 2008 • IAMGOLD can earn 50% interest for Zone 1B Resource Area Cdn $10.5M spend over 4 years Siribaya Babara Trend • IAMGOLD ho
Slide 45: Mali: Siribaya JV
Mali: Siribaya JV Siribaya Trend 2009 drilling within the Zone1B resource area Zone 1B resource estimate (Merrex - Nov 09 ) Zone 1B Indicated Resources: 4.02 Mt @ 2.39g/t Au (308 Koz) Inferred Resources: 0.95 Mt @ 2.29g/t Au (70 Koz) 2010 drilling budget: 14,500m RC Drilling Explore full
Slide 46: Mali: Siribaya JV 2009 DD / 2010 RC Results
Mali: Siribaya JV 2009 DD / 2010 RC Results 33m@5.07g/t 2009 DD Intercept 17m@2.09g/t 2010 RC Intercept 11m@0.87g/t 11m@0.78g/t 5m@2.09g/t 4m@5.88g/t 30m@3.89g/t 14m@4.98g/t 26m@3.05g/t 30m@2.05g/t Zone 1B 20m@5.92g/t 26m@4.02g/t 24m@5.54g/t 33m@5.07g/t 22m@3.25g/t 8m@7.22g/t 21.5m@2.04g/t 12m@4.75g
Slide 47: Mali: Siribaya
Mali: Siribaya Siribaya JV MALI JV Drill Core Samples Au Hosted by Multistage Breccia - Qtz - Pyrite (Limonite) Carbonate Facies 3 g/t 10 g/t Greywacke Facies 15 g/t 2.5 g/t 87
Slide 48: Mali: Kalana JV
Mali: Kalana JV 2010 Budget - $4.6 million 370 km2 Mining Permit expires 2033 Avnel - IMG Option Agreement signed August 2009 • IAMGOLD can earn a 51% interest in Avnel’s share of SOMIKA (80%); Malian Government (20%) • $11M expenditure in 3 years • NI43-101 Compliant Resource of 2 Moz • IAMGOLD
Slide 49: Mali: Kalana JV
Mali: Kalana JV General Mine Geology : Veins are centered on a Diorite Intrusive 89
Slide 50: Mali: Kalana JV
Mali: Kalana JV Four high-grade shallow-dipping quartz lodes are exploited The total number of veins is unknown Presence of feeder zones unknown All mining is near-surface (< 200m) Shaft 1 Inter-vein stockworks offer bulk mineable targets Shaft 2 Underground workings Kalana Mine - All leve
Slide 51: Mali: Kalana JV
Mali: Kalana JV Grade of Grade the totalcompiled of quartz mining width vein (0.8-1.2 m)17 (map - Vein 17view) (map view) grade g/t 10180 1000 10160 500 10140 200 100 10120 50 10100 30 0 20 40 m 15 10080 UTM local datum Somika 0 9560 9580 9600 9620 9640 9660 9680 9700 9720 91
Slide 52: Mali: Kalana JV 2010 Drilling Results
Mali: Kalana JV 2010 Drilling Results DDH 2010 1m @ 7.3g/t Au RC planned 1m @ 8.0g/t Au 5m @ 1.1g/t Au RC completed 25m @ 0.6g/t Au 7m @ 3.7g/t Au 7m @ 3.6g/t Au 9m @ 2.2g/t Au 4m @ 3.8g/t Au 7m @ 1.8g/t Au 1m @ 11.1g/t Au 3m @ 2.6g/t Au 1m @ 9.6g/t Au 1m @ 6.4g/t Au 22m @ 1.0g/t Au 3m @ 3.6g/t Au 1
Slide 53: Mali: Kalana JV Regional Geochemistry
Mali: Kalana JV Regional Geochemistry Kalanako Kalana Permit 382 km² Kalana Dadjan Proposed RC lines Targets Artisanal Workings 93 2km
Slide 54: Mali: Kalana JV Kalanako Target
Mali: Kalana JV Kalanako Target Proposed RC drill holes Historic drill holes 1km Historic auger Artisanal Workings 3km Magnetic Anomaly Magnetic Anomaly 250 0 250 500m 94 94
Slide 55: Africa Q&A
# IAMGOLD’ CORPORATION AFRICA Q&A Member of World Gold Council www.gold.org