British Land Company PLC · LSE:BLND

British Land — Corporate Update (May 2024)

22 slides from British Land's corporate update, May 23, 2024

  1. Slide 1: Canada Water development Construction Liaison Forum

    Canada Water development Construction Liaison Forum Printworks and the surrounding area Thursday 23rd May 2024

  2. Slide 2: Canada Water development agenda

    Canada Water Construction The Printworks building Work completed by UK development management (Wates) Power Networks Enabling works for Printworks Street and Utility diversion works Q&A Reel Street (working names)

  3. Slide 3: Our team

    Our team SARAH WARD KEIR FREESTONE Construction Neighbourhood British Land Liaison Manager CHLOE DENNINGTON PATRICK GARDINER DAVID HARRISON DOMINIC PART Community Liaison Officer, Contractor, Wates (Printworks Contractor, Galldris (Enabling UK Power Networks (Substation Wates construction) works) an

  4. Slide 4: Canada Water development boundary

    Pictured: The red line on the image above reflects the Canada Water development boundary. Please note that the locations of t he labels are indicative.

  5. Slide 5: Vehicle access

    Vehicle access • Zone L - Below ground substation: Deliveries of electricity equipment are ongoing, accessing the site via Quebec Way. • The Printworks building: Vehicles access the site from Surrey Quays Road. • Enabling works for Printworks Street and Reel Street (working Aerial view of Printworks

  6. Slide 6: How are we reducing the impact of construction activity?

    How are we reducing the impact of construction activity?

  7. Slide 7: Common working practices

    Common working practices Standard construction working hours: • Monday – Friday: 8am – 6pm • Saturday: 8am – 2pm (no noisy works before 9am) • When work outside of standard hours is needed, this will be agreed with Southwark Council and communicated in advance via our website: Computer-generated ima

  8. Slide 8: How is construction progressing at the Printworks building?

    How is construction progressing at the Printworks building?

  9. Slide 9: Ongoing work

    Ongoing work • Removal of blockwork, cladding, roofing and internal fixtures. • Breaking out ground floor slabs. • Demolition of the building’s adjacent warehouses and the northern end of press halls. Construction underway at the Printworks building

  10. Slide 10: Construction management

    Construction management • Dust suppression using a variety of hoses and misters at source and at the site boundary. • Noise, dust, and vibration monitoring. • Wates is adhering to noise limits as agreed in Section 61, which allow a time average sound level of 75dB over 10 hours Monday- Computer-gene

  11. Slide 11: How are the enabling works for Printworks Street and Reel Street progressing?

    How are the enabling works for Printworks Street and Reel Street (working names) progressing?

  12. Slide 12: Upcoming work

    Upcoming work • Construction of the new access roads due to start in mid-June. Galldris work area • Works will include drainage and Quebec Way service installation, and asphalting. • The roads will open to the public upon completion of the main works Aerial view to show Galldris’ work area to the Pr

  13. Slide 13: What is happening at The Paper Yard?

    What is happening at The Paper Yard?

  14. Slide 14: Upcoming work

    Upcoming work • Construction of The Paper Yard completed last year. • In July, new footpath paving works along the footpath between TEDI-London and the Quebec Way Paper Yard building will take place. • Works are expected to take around two months. • Temporary suspension of a small number Plan of wor

  15. Slide 15: What is happening in the below ground substation (Zone L)?

    What is happening in the below ground substation (Zone L)?

  16. Slide 16: The below ground substation

    The below ground substation • The new below ground substation will supply power to the Canada Water development and wider community. • The site is expected to reach full operation in late 2025. • Scaffolding gantry was reconstructed in March 2024 to lower materials within the substation. • All other

  17. Slide 17: Current progress

    Current progress • UK Power Networks and its Alliance Partners are currently undertaking the substation fit out works below ground. • UK Power Networks have begun cable installation works in Southwark. These Switchgear installed, now being Louvres installed (March 2024) cables will supply electricit

  18. Slide 18: UK Power Networks cabling works

    UK Power Networks cabling works • UK Power Networks are undertaking cabling works. Surrey Quays Road Canada Water • Traffic management is in Library place at the junction of Deal Porters Way and Surrey Deal Porters Way Quays Road. • Works expected to complete later this summer, before moving east al

  19. Slide 19: What is happening along Surrey Quays Road and Redriff Road?

    What is happening along Surrey Quays Road and Redriff Road?

  20. Slide 20: Utility diversion works

    Utility diversion works • Utility investigation works to identify existing utility connections are ongoing. • Footway closures are in place along Surrey Quays Road and Redriff Road. • From June – early autumn, work will start in the carriageway of Surrey Quays Road. • Traffic management will be in p

  21. Slide 21: Do you have any questions?

    Do you have any questions? Contact us Tel: 0800 470 4593 (freephone) Email: team@canadawater.co.uk Website: www.canadawater.co.uk

  22. Slide 22: Key

    Key Pre-application COMPLETED In for planning/consented Under construction Completed CONSENTED CONSENTED CONSENTED H1 & H2: SUBMITTED MEANWHILE USE COMPLETED UNDER CONSTRUCTION CONSENTED UNDER CONSTRUCTION CONSENTED UNDER CONSTRUCTION CONSENTED CONSENTED ZONE D: PRE-APPLICATION ZONE B: PRE-APPLICATI