E To E Transportation Infrastructure Limited · NSE:E2ERAIL
E To E Transportation Infrastructure — Investor Presentation (September 2026)
26 slides from E To E Transportation Infrastructure's investor presentation, Sep 6, 2026
Slide 1: Exchange covering letter for investor presentation
REF:E2ERAIL:STATUT:LODR:2026 September 6, 2026 To, Exchange Plaza, 5th floor, Plot No. C/1, G Block Bandra-Kurla Complex, Bandra (E). Mumbai 400 051 Attn: Listing Compliance Dept. Sub.: Investor Presentation Ref: NSE E2ERAIL / ISIN - INE1CEJ01017 Dear Sir / Madam, In reference to our letter dated 1s
Slide 2: E To E Transportation Infrastructure Limited
E TO E TRANSPORTATION INFRASTRUCTURE LIMITED M INTEGRATOR: G MOBILITY INTELZIGENCE, oso Not just SYS | ~ ENGINE BUILDI
Slide 3: One company, four integrated capabilities
platform. 16: YEARS TH RATL INFRASTRUCTURE 65; CLIENTS SERVED 100. RESEARCH & DEVELOPMENT EXPERTS 155+ PRosecTs DELIVERED ONE COMPANY, 370+ ENGINEERS OW THE GROUND FOUR EDRC — Engineering Design interlockin de nfiguration jalists in electrification modelling, oprietary IP 60. IN-HOUSE DESIGN EXPERTS
Slide 4: Vision, Mission and Values
RESPONSIBILITY ccountability r commitments and act responsibly toward communities and en VISION TO BECOME THE INTELLIGENCE LAYER OF GLOBAL MOBILITY - AUTONOMOUS SYSTEMS THAT PREDICT, PROTECT AND DECIDE. SOVERIGN BY DESIGN. \, BUILT TO KEEP THE WORLD Ss _\wovine, UNINTERRUPTED. INNOVATION We operate
Slide 5: What we deliver
DIOEND. = 18:35 BENGALURU JN. WHAT WE DELIVER BOARD | PLATFORM .Q7 SERVICE DESCRIPTION STATUS SIGN & ENGINEERING NALLING PLANS + IFC « OU + TA SIGNALLING & TELECOM TEM INTEGRATION MUI TI-VFNNOR INTERFACES + STNGIF NT ACCNUINTART LLATION & W G INDO ITDOOR GE: (ATION EI SYSTEMS COMMISSION: N RATED TRI
Slide 6: Company journey and milestones
through EXECUTION Powered by INNO Founding Year Private Equity Funding - | First order BTC First Private Sidings eries A signalling system (Order & Chennai Metro signalling & PSD order Establishment of B2B Open Orderbook vertical - Private crossed 500 Cr. & pct Sidinge Transitioned to pe. Public Lim
Slide 7: Built on strength: delivering financial excellence
BUILT ON STRENGTH. DELIVERING FINANCIAL EXCELLENCE. Consistent Performance. Strong Fundamentals. Sustainable Value. “SEGRAIL FY26 REVENUE 380 Cr Ga) +51.5% REVENUE CAGR FY23-FY26 ~41% FY25 REVENUE FY24 REVENUE FY23 REVENUE %250.8 Cr 3173.7 Cr ~%106 Cr a a a EBITDA 38.0 Cr (10.0% MARGIN) ADJ. ¥39.5 C
Slide 8: Orderbook and growth outlook
BUILT ON STRENGTH. ACCELERATING WHAT’S NEXT. A stronger orderbook today. A bigger tomorrow. —~SERAIL ORDERBOOK =1,000 Cr+ Orderbook in FY27 already crossed FY27 %1,000 Cr+ A strong foundation for sustained, long-term growth. GROWTH OUTLOOK 45-48% Revenue CAGR (FY27 onwards) Gooch Sealing with India’
Slide 9: Investment case: proven in execution
ZT RAIL INVESTMENT CASE PROVEN IN EXECUTION. Structural Rail Tech Opportunity + Positioned across signalling, telecom, electrification, track and safety-critical systems as railway investment becomes increasing] technology-led. Established acc Railways, PSUs, metros, industrial rail and internationa
Slide 10: Board of Directors
“ag. Board of Directors Strategic oversight and long-term direction — capital, governance and deep railway domain expertise on one line. 083 9 6 SOURAJIT MUKHERJEE Whole Time Director & CLO VINAY RAO Non- Executive Director & Chairman ANSHUL GUPTA Non- Executive Director MUKUL GULATI Non- Executive
Slide 11: Trusted by India's leading railways and metros
Wao _ WAgamas Gite Signalling - T m - Electrification - Track — trusted by India's leading railways, metros and industrial infrastructure players @ RAILWAYS & PSUs METRO RAIL NETWORKS. RT r. © main MMRC | © | PRIVATE & INDUSTRIAL nts — IR zones, metros, DFCCs, ports & private sidings. 160+ 2,500+ pr
Slide 12: Business verticals
i eae BUSINESS VERTICALS B2G BUSINESS TO GOVERNMENT B2B BUSINESS TO BUSINESS * Direct Indian Railways, PSUs and Metros + Private Railway Sidings. + 300+ highly experienced engineers + 70+ highly experienced engineers + System Integration of S&T and Turnkey projects + Upgradation and Modernization +
Slide 13: B2G turnkey signalling projects
Turnkey signalling, telecom and electrification delivered = B2G directly to zonal railways and government PSUs. B2E RAIL Indian Railways - PSUs SIGNALLING UPGRADATION 567 Cr. Rewiring the nerve centre of Indian Railways, one station at a time. MISSION RAFTAAR -ABS 438 Cr. More trains on the same tra
Slide 14: B2B ongoing key projects
B2 ON-GOING KEY PROJECTS NEED PAL, 4 235 7 Private sidings & industrial clients - Consulting based Solutions and System Integrator Projects Crore live value Client groups CEMENT €74.87 Cr POWER 752.73 Cr 37.73 Adani Power, Raigarh 24.97 ambuja Cements, Bhatapara OHE & S&T to 600 MW TPP P-way, OHE &
Slide 15: Engineering Design & Research Centre
A SG RAIL ° ENGINEERING DESIGN & RESEARCH CENTRE 50+ MILLION ORDERBOOK FOR EDRC PROJECTS EDRC is the engineering backbone of e2E Rail’s integrated railway platform. Embedded from the pre-bid stage, the Centre brings together multidisciplinary expertise across Railways to translate complex project re
Slide 16: SUTRA: the thread that runs through every project
SZ RAIL SUTRA — the thread that runs through every project. / Aasanskrit, SUTRA means two things: a thread, and the formula that holds a system together. Both are what EDRC built — six tools Binding six _/__/ design disciplines into one continuous line from first bid to final sanction. SUTRA — SIGNA
Slide 17: New initiatives: technology, intelligence, partnerships
FEZ RAIL | CNEWINITIATIVES 9% 2 HNOLOGY. INTELLIGENCE. PARTNERSHIPS.” Cian: ©
Slide 18: From integrator to OEM: NOVA Control Tecnologix
SET RAIL For fifteen years we integrated other people's technology. After several years of Research & Development - this year we started building our own. (tt NOVA Control Tecnologix is an OEM along with the product and technology arm of e2E z Rail — created to design, build, manufacture and certify
Slide 19: NOVA & Tata Elxsi: Co-developing KAVACH 4.0
NOVA & Tata Elxsi: Co-Developing KAVACH 4.0 Complementary strengths in rail system integration and safety-critical product engineering e2E Rail / NOVA ~~ag Tata Elxsi TATA ELXS! Rail system integration, delivery and lifecycle support Safety-critical product engineering at global scale 2500+ km 400+
Slide 20: KAVACH 4.0 roadmap
KAVACH 4.0 - ROADMAP Every layer between a bare component and a running section of railway sits inside one accountable organisation. SIX LAYERS, ONE OWNER Field Deployment, NMS & AMC e2E Rail System Integration & Commissioning e2E Rail KAVACH System Build & FAT NOVA —12-gate QA Embedded Safety Softw
Slide 21: Slide 21
Slide 22: One Platform: suite of SIL-4 products
One Platform. THE PLATFORM BENEATH A Universe of Rail Safety. THE FUTURE OF RAIL SAFETY. j al A single SIL-4 certified compute core—engineered in India—powering train protection interlocking, CBTC and the next generation of signalling systems. Built once. Proven once. Reused everywhere. SUITE OF SIL
Slide 23: NOVA RAKSHA SIL-4 safety platform
NOVA RAKSHA - SIL-~4 SAFETY PLATFORM A SOVEREIGN PLATFORM, BUILT FOR WHAT'S NEXT. 01 Indigenous & Sovereign Designed and built in India on RDSO-aligned standards — without foreign IP dependency. 03 Faster to Field Module reuse compresses development and certification timelines for every new system.
Slide 24: NOVA RAKSHA roadmap
NOVA RAKSHA - ROADMAP FY'27 to FY’31 - Each bucket shown as a single track — the span across its products from first development to full commercialisation. FY26-27 FY27-28 FY28-29 FY29-30 FY30-31 01 Train Protection Systems 11,00,000r KAVACH 4.0 - Interlocking & Train Detection - Platform Screen Doo
Slide 25: Not just systems
Not just SY = ENGINEERING BUILDING
Slide 26: Annexure: refer to Annual Report
SEI RAIL ANNEXURE For more details, please refer to our Annual Report. Comprehensive information on our business, strategy, financial performance, governance, ESG inilialives and more is available in our Annual Report on the e2E Rail website. (@ READ OUR ANNUAL REPORT | >) hittps://etoerail.com/annu
E To E Transportation Infrastructure — Investor Presentation (September 2026) on 6ix