Wesdome Gold Mines Ltd. · TSX:WDO

Wesdome Gold Mines — Investor Presentation (March 2020)

39 slides from Wesdome Gold Mines's investor presentation, March 2020

  1. Slide 1: Building Canada's Next Mid-Tier Gold Producer

    March 2020 Building Canada’s Next Mid-Tier Gold Producer

  2. Slide 2: Cautionary Statements

    Cautionary Statements Forward-Looking Information This presentation contains statements or information concerning the business, operations and financial performance and condition of Wesdome Gold Mines Ltd. (“Wesdome” or the “Company”) which constitute forward-looking statements or information (colle

  3. Slide 3: Building Canada's Next Mid-Tier Gold Producer

    Building Canada’s Next Mid-Tier Gold Producer Proven building blocks to increase shareholder value New high-grade gold discovery in permitted, de- watered former producing mine Low risk expansion of existing mines in proven mining camps Assets in top rated jurisdictions – Ontario and Quebec TSX:WDO

  4. Slide 4: Corporate Structure

    Corporate Structure Symbol 52 Week High/Low Analyst Coverage TSX:WDO $11.07/$3.97 (Average daily BMO Capital Markets volume 1,00,000 shares) Canaccord Genuity Shares Outstanding Echelon Wealth Partners 138.0 M Market Capitalization Eight Capital Partners C$ 1.0 B Options and RSU’s Industrial Allianc

  5. Slide 5: One Year Share Price Performance

    One Year Share Price Performance WDO vs GDX WDO vs GDXJ WDO vs Global Gold Index WDO vs Gold Price TSX:WDO | 5

  6. Slide 6: Canadian Gold Company with Three 100% Owned Projects

    Canadian Gold Company with Three 100% Owned Projects • Over 30 years of continuous gold production • 2019 Production: 91,688 Ounces (upwards revised guidance: 88,000 – 93,000 ounces) • 2020 Guidance: 90,000 – 100,000 ounces • Eagle River Mine free cash flow generation of 3 1 2 1 $48.4 M • Eagle Rive

  7. Slide 7: Eagle River Overview

    Eagle River Overview Reserves 303 Zone Rock Sample Category Tonnes Grade Contained Ounces (g/t Au) Proven 331,000 15.5 165,000 Probable 855,000 14.0 385,000 Proven 1,186,000 14.4 550,000 and Probable Resources Category Tonnes Grade Contained (g/t Au) Ounces Measured 25,000 10.1 8,000 Indicated 355,0

  8. Slide 8: 2019 Upwards Revised Guidance Achieved and 2020 Guidance

    2019 Upwards Revised Guidance Achieved and 2020 Guidance 2020 Guidance 2019 Upwards Revised 2019 Guidance Achievement Gold production Eagle River 87,000 – 96,000 ounces 85,000 – 89,000 ounces 88,617 ounces Mishi 3,000 – 4,000 ounces 3,000 – 4,000 ounces 3,072 ounces 90,000 – 100,000 ounces 88,000 –

  9. Slide 9: Q4 and 2019 Financial Results

    Q4 and 2019 Financial Results In 000s, except per units and per share amounts Q4 2019 Q3 2019 Q2 2019 Q1 2019 FY 2019 Q4 2018 FY 2018 Financial results Revenues 43,223 45,940 42,276 32,535 163,974 29,462 116,042 Mine operating profit 1 25,816 26,770 22,055 16,259 90,900 12,495 52,124 Net income 12,0

  10. Slide 10: Eagle River In Mine Exploration

    Eagle River In Mine Exploration TSX:WDO | 10

  11. Slide 11: 300 Zone/303 Lens Recent Drilling

    300 Zone/303 Lens Recent Drilling • Hole 925-E-113: 49.1 g/t Au over 6.4 m core length (13.7 g/t Au cut, 4.1 m true width) 13.7 g/t Au cut, 4.1 m • Hole 925-E-132: 128.8 true width g/t Au over 5.0 m core length (51.6 g/t Au cut, 2.5 m true width) 51.6 g/t Au cut, 2.5 m true width • Hole 925-E-134: 2

  12. Slide 12: Eagle Exploration Targeting – Parallel Zones

    Eagle Exploration Targeting – Parallel Zones Targeting areas where E-W structures intersection WNW structures, and areas where structures enter/exit Diorite 7 Zone 300 Zone N Potential Extension of 300 and 7 Zones 8 Zone Plan View TSX:WDO | 12

  13. Slide 13: Eagle River Surface Exploration – Falcon Zones

    Eagle River Surface Exploration – Falcon Zones Falcon Zones Highlights: • Hole ERM-2019-60: 2,690.0 g/t over 0.5 m core length (60.0 g/t Au cut, 0.4 m true width) • Hole ERM-2019-63: 49.4 g/t Au over 3.0 m core length (23.2 g/t Au cut, 2.2 m width) • Hole ERM-2019-02: 16.0 g/t Au over 6.4 m core len

  14. Slide 14: Kiena Complex, Val d'Or, Quebec

    Kiena Complex, Val d’Or, Quebec • Mine on care and maintenance since mid-2013 • 2,000 TPD permitted mill • 930 Metre shaft • Ramp system to 1050 m • Underground fully accessible • Past production 1981 – 2013 12,500,000 mt @ 4.5 g/t = 1.75 M ounces produced TSX:WDO | 14

  15. Slide 15: Kiena Complex Overview

    Kiena Complex Overview Kiena Mineral Resources Proximal to Mine Development (A, B, Resources – Kiena Deep A Zone only South, VC and S 50 Zones – includes A Zone table) Category Tonnes Grade Contained Ounces Category Tonnes Grade Contained Ounces (g/t Au) (g/t Au) Measured - - - Measured - - - Indica

  16. Slide 16: Kiena Complex – Location, Location, Location!

    Kiena Complex – Location, Location, Location! Property Size: 65 Square Kilometres TSX:WDO | 16

  17. Slide 17: Kiena Complex – Regional Geological Potential

    Kiena Complex – Regional Geological Potential Siscoe Mine Wesdome Deposit 0.9 M oz prod Presqu’ile Deposit Kiena Deep Kiena Mine 1.8 M oz prod TSX:WDO | 17

  18. Slide 18: Kiena Deep A Zone

    Kiena Deep A Zone Kiena Deep A Zone •Hole 6456: 68.2 g/t Au over 19.0 m core length (28.1 g/t Au cut, 14.4 m true width) •Hole 6450: 126.3 g/t Au over 4.3 m core length (23.6 g/t Au cut, 3.8 m true width) A2 Zone •Hole 6449: 44.5 g/t Au over 9.0 m core length (17.0 g/t Au cut, 7.3 m true width) •Hol

  19. Slide 19: Kiena Deep A Zone Recent Drilling

    Kiena Deep A Zone Recent Drilling TSX:WDO | 19

  20. Slide 20: Kiena Deep A Zone – Flattens at Depth with Multiple Zones

    Kiena Deep A Zone – Flattens at Depth with Multiple Zones TSX:WDO | 20

  21. Slide 21: A Zone and Exploration Potential

    A Zone and Exploration Potential TSX:WDO | 21

  22. Slide 22: Moss Lake – Optionality on Gold Price

    Moss Lake – Optionality on Gold Price • Dominant land holdings, 36 km along Shebandowan Gold Belt containing four deposits open for expansion • 2017 drilling extends strike length mineralization from 2.5 kms to 8.0 kms • Geophysical expression (IP) extends over a strike length of 8 kms • Potential t

  23. Slide 23: 2020 Exploration Summary – Sustained Investment

    2020 Exploration Summary – Sustained Investment Eagle: Kiena: $19.8 M Exploration 5 Underground Drills 7 Underground Drills Drilling Budget 1 Surface Drill 2 Surface Drills 2020 2019 2018 2017 2016 2015 Property Metres Metres Metres Metres Metres Metres Eagle Underground 72,000 51,000 25,000 24,000

  24. Slide 24: Summary

    Summary LOW CAPEX: HIGHLY EXECUTABLE: LOW RISK: Kiena: New gold discovery Eagle River: new high- Expansion of existing in existing, permitted, de- grade parallel zones close mines in proven watered former producing to infrastructure mining camps mine Aggressive Exploration Operations in safe Pipelin

  25. Slide 25: Contact Info

    Contact Info Duncan Middlemiss Lindsay Dunlop President and CEO Vice President, Investor Relations 416.360.3743 ext. 2029 416.360.3743 ext. 2025 Duncan.middlemiss@wesdome.com Lindsay.dunlop@wesdome.com

  26. Slide 26: Appendix

    Appendix TSX:WDO WESDOME wesdome.com

  27. Slide 27: Executive Management Team

    Executive Management Team - Professional engineer with over 25 years experience in operational management, mine rehabilitation, development Duncan Middlemiss, P. Eng and gold production Chief Executive Officer - Over 10 years of executive management experience - Most recently Chief Executive Officer

  28. Slide 28: Board of Directors

    Board of Directors - Over 35 years experience in the mining industry within operations, project and business Warwick Morely-Jepson development Chairman - Formerly Chief Operating Officer and Executive VP of Kinross Gold Corp - Chartered Professional Accountant and member of the Chartered Professiona

  29. Slide 29: Cautionary Statements

    Cautionary Statements Estimates of Mineral Resources This presentation contains information regarding the mineral resource estimate at the Company’s Kiena Mine Complex, which has been classified in accordance with the Canadian Institute of Mining, Metallurgy and Petroleum’s “CIM Definition Standards

  30. Slide 30: Eagle River Parallel Structure Reserve Breakdown

    Eagle River Parallel Structure Reserve Breakdown December 31, 2019 December 31, 2018 Structure Grade Tonnes Grade Contained Tonnes (g/t Contained (000s) (g/t Au) Ounces % (000s) Au) Ounces % No.300 798 15.5 397,000 72 503 12.4 201,000 50 No. 7 267 12.9 110,500 20 300 13.1 126,000 31 No. 8 103 11.6 3

  31. Slide 31: Eagle River Mineral Resources (2019 Year End)

    Eagle River Mineral Resources (2019 Year End) MINERAL December 31, 2019 December 31, 2018 RESOURCES (Exclusive of Mineral Reserves) (see notes) Tonnes Grade Contained Tonnes Grade Contained (000s) (g/t Au) ounces (000s) (g/t Au) ounces Eagle River Measured 25.0 10.1 8,000 11.0 10.4 4,000 Indicated 3

  32. Slide 32: Kiena Resource Update

    Kiena Resource Update Mineral Resources Proximal to Kiena Mine A Zone Mineral Resource Estimate Development (A, B, South, VC, S50 Zones Gold Grade Gold Grade Gold Tonnes Gold Ounces g/t Au Tonnes g/t Au Ounces Indicated 679,200 18.55 405,100 Indicated 968,900 14.46 450,400 Total M+I 679,200 18.55 40

  33. Slide 33: Eagle River/Mishi Complex Central Ontario

    Eagle River/Mishi Complex Central Ontario • Located in Hemlo/Wawa Gold Camp • Celebrating 20 years of production • 1,000,000+ oz @ 9.1 g/t Au • Current operations ~800 tpd Mill located adjacent to Mishi open pit deposit (permitted to 1,200 tpd) • Eagle River underground mine located 15 kms to south

  34. Slide 34: Latest Drifting Results 300E Structure 864 m Level

    Latest Drifting Results 300E Structure 864 m Level 155.4 m of strike length/2.8 m average width/19.6 g/t Au cut/28.3 g/t Au uncut TSX:WDO | 34

  35. Slide 35: Kiena Deep A Zone Up Plunge Extension to VC Zone

    Kiena Deep A Zone Up Plunge Extension to VC Zone TSX:WDO | 35

  36. Slide 36: 2013 Moss Lake – PEA (2.5 M oz. study)

    2013 Moss Lake – PEA (2.5 M oz. study) open NE SW NE open 300 m 2.5 km SW General View of Mineralized Zones Longitudinal and Plan View of Moss Lake Pit Highlights • Open pit mine and CIL Processing at 40,000 tpd • Pre-production Capital: $543 M CDN • Life of mine strip ratio of 2.5 : 1 • Operating c

  37. Slide 37: Moss Lake Resources

    Moss Lake Resources Category Tonnes Grade (gAu/Tonne) Contained Ounces Moss Lake Resources Total M + I 39,795,000 1.1 1,377,000 Resources Total Inferred 50,364,000 1.1 1,751,000 Resources • Reserves and Resources as at December 31, 2016. • Mineral Resources exclusive of Mineral Reserves • The conten

  38. Slide 38: Kiena Deep A Zone

    Kiena Deep A Zone TSX:WDO | 38

  39. Slide 39: Kiena Complex Drill Core August 2016

    Kiena Complex Drill Core August 2016 TSX:WDO | 39

Wesdome Gold Mines — Investor Presentation (March 2020) on 6ix