  1. Slide 1: PWRcell AC Coupling Technical Webinar

    PWRcell AC Coupling Technical Webinar CONFIDENTIAL

  2. Slide 2: Agenda

    Agenda • AC-Coupled PV • AC Generator Integration • Overview • Overview • Equipment Requirements • Equipment Requirements • System Behavior • PWRcell <> Gen Communication • Managing AC-Coupled PV • Generator Control Modes • Operating Modes • Battery Charging • Install Configurations CONFIDENTIAL 8/1

  3. Slide 3: AC-Coupled PV

    AC-Coupled PV With PWRcell Battery Storage CONFIDENTIAL 8/18/2022 3

  4. Slide 4: Feature Overview

    Feature Overview AC PV with PWRcell Though designed specifically for DC-coupled applications, the PWRcell ESS has historically had a level of flexibility to utilize power produced by AC- coupled PV while connected to the grid. With this FW update, the following functionality is made available: 1) Up

  5. Slide 5: Equipment Requirements

    Equipment Requirements AC PV with PWRcell Required Equipment • XVT076A03 PWRcell Inverter • M6 PWRcell Battery • 1Ø PWRcell ATS, 100-200A (CXS series or field-upgrade RXS/RXG series) • Up to 7.6kW of AC-coupled PV Load Management Options (NOTE: Load Management is not supported with AC-coupled PWRcel

  6. Slide 6: Equipment Requirements

    Equipment Requirements AC PV with PWRcell Incompatible Equipment • 3Ø Equipment • X7602 or older 1Ø Generac/Pika Inverters • M3-M5 PWRcell Battery Configurations • Dual-Cabinet PWRcell Battery Configurations • PWRcell systems with an AC or DC Generator • PWRcell systems with DC-coupled PV (i.e., PWR

  7. Slide 7: Grid Connected Behavior

    Grid Connected Behavior AC PV with PWRcell ③ Power from ACcPV may be directed to (shown in order of priority): ① 1. Support Home Loads 2. Charge Batteries 3. Export to the grid ② CONFIDENTIAL 8/18/2022 7

  8. Slide 8: Grid Outage Behavior

    Grid Outage Behavior AC PV with PWRcell When in Island Mode, PWRcell will generate If power cannot be exported to the grid… a simulated grid to maintain power to home loads. This will allow AC PV load-side of the ATS to maintain operation. Since grid export is not possible, when the AC PV has the po

  9. Slide 9: Management Criteria

    Management Criteria AC PV with PWRcell • A new inverter setpoint – ACPVPower – will allow PWRcell to determine when AC-coupled PV production should be managed OFF, and when it can be safely allowed to resume operation. • ACPVPower may be set between 0 and 7.6kW (0 indicates no AC-coupled PV is conne

  10. Slide 10: Cutoff Thresholds

    Cutoff Thresholds AC PV with PWRcell High SoC; Low BACP • Battery Available Charging Power (BACP) is based on the ACPVPower Setting and the State of BACP is lower than Charge (SoC) of the Battery. ACPVPower Setting • As Battery State-of-Charge (SoC) increases, AC PV is BACP will decrease. managed OF

  11. Slide 11: Frequency Modulations

    Frequency Modulations AC PV with PWRcell Condition Frequency It is the installer's responsibility to ensure that AC-coupled PV will be responsive to PWRcell. AC PV OFF (trip) 65.1 Hz Pulse Failure of third-party equipment to respond to PWRcell frequency 60 Hz avg., 58.7-64.1 Hz AC PV OFF (hold-off)

  12. Slide 12: Operating Modes

    Operating Modes AC PV with PWRcell These three PWRcell System Modes are compatible with AC-coupled PV: • AC-coupled PV may be used to support local loads and charge Self Supply batteries • AC power – both utility and PV – will be used to charge batteries. Priority Backup “Zero Import” may be used to

  13. Slide 13: Self Supply

    Self Supply AC PV with PWRcell AC PV usage in Self Supply Support home loads. AC PV will supply power directly to home loads but will be supplemented with battery power if unable to support all home loads. Charge PWRcell batteries. AC PV power in excess of what is needed by home loads will be used b

  14. Slide 14: Priority Backup

    Priority Backup AC PV with PWRcell AC PV usage in Priority Backup Support home loads. AC PV will supply power directly to home loads. Battery power will not discharge to support local loads while grid connected. Charge PWRcell batteries. PWRcell will use AC power (both PV and Grid) to charge batteri

  15. Slide 15: Priority Backup + Zero Import

    Priority Backup + Zero Import AC PV with PWRcell AC PV usage in Priority Backup with Zero Import enabled Support home loads. AC PV will supply power directly to home loads. Battery power will not discharge to support local loads while grid connected. Charge PWRcell batteries. When ACcPV production e

  16. Slide 16: Sell

    Sell AC PV with PWRcell AC PV usage in Sell mode Support home loads. AC PV will supply power directly to home loads while the PWRcell Battery is simultaneously discharging at the highest possible discharge rate. Export to the grid. When home loads are covered, excess PV power will be exported to the

  17. Slide 17: Questions?

    Questions? AC PV with PWRcell CONFIDENTIAL 8/18/2022 17

  18. Slide 18: AC Generator Integration

    AC Generator Integration With a PWRcell Energy Storage System CONFIDENTIAL 8/18/2022 18

  19. Slide 19: Feature Overview

    Feature Overview AC Generator Integration Flexible Coverage Whole-Home Partial-home PWRcell + HSB Generator Whole-Home PWRcell + HSB Generator CONFIDENTIAL 8/18/2022 19

  20. Slide 20: Feature Overview

    Feature Overview AC Generator Integration With this FW update, the following functionality is made available: 1) The PWRcell Inverter now includes settings to indicate the presence (and size) of an integrated generator. 2) During an outage, PWRcell can inhibit the HSB Generator from turning on while

  21. Slide 21: Equipment Requirements

    Equipment Requirements AC Generator Integration Required Equipment • XVT076A03 PWRcell Inverter • M6 PWRcell Battery (single and dual-cabinet configurations supported) • 1Ø Air-cooled Generac HSB Generator, 9kW-26kW, w/ Evolution controller • 1Ø PWRcell ATS, 100-200A (CXS series or field-upgrade RXS

  22. Slide 22: Equipment Requirements

    Equipment Requirements AC Generator Integration Incompatible Equipment • AC-coupled PWRcell systems • PWRcell systems with a DC-coupled PWRgenerator • 3Ø equipment • X7602 or older Generac/Pika inverters • Older PWRcell ATS models • Non-PWRcell Generac ATS models • M3, M4, M5 PWRcell Configurations

  23. Slide 23: ATS Controllers

    ATS Controllers AC Generator Integration Not Compatible with Generator Integration COMPATIBLE with Generator Integration Blue PCB indicates Generator Integration SACM Relays Removed Part #: A0000520273 Part #: A0001243729 Part #: A0002059820 Part #: A0002532225 Used in Existing PWRcell Used in New P

  24. Slide 24: Field Upgrade Kit

    Field Upgrade Kit AC Generator Integration • Model – G0080060 • Description Upgrade your existing PWRcell or Generator ATS with Generator Integration capabilities. • Contents • PWRcell ATS Controller (Useable for Whole-Home Generator Integration) • Installation Instructions • Mounting Hardware • Com

  25. Slide 25: Inverter Fuse Replacement

    Inverter Fuse Replacement AC Generator Integration • When integrating an AC Generator with a PWRcell ESS, it is required to replace the 1A fuses in the PWRcell Inverter with 3.15A fuses. • 2x 3.15A fuses – along with a small instructional decal – will be fixed to the front surface of all ATS control

  26. Slide 26: Load Management

    Load Management AC Generator Integration All backup power sources – PWRcell and Generator – MUST be sized appropriately for the loads that will be protected in an outage. Protected loads in excess of PWRcell or Generator capacity must be managed using an appropriate load-management device. ATS Smart

  27. Slide 27: Wiring Scheme – Single ATS

    Wiring Scheme – Single ATS AC Generator Integration PWRcell ATS Controller XVT076A03 Inverter – Wiring Compartment ATS Accessory Port Gen Inhibit L1 & L2 Inverter ATS Control Min. Cat 5 cable with 600 V insulation The PWRcell Inverter uses high/low digital signals to 26-16 AWG wire control whether t

  28. Slide 28: Wiring Scheme – Dual ATS

    Wiring Scheme – Dual ATS AC Generator Integration “Generator ATS” “Inverter ATS” XVT076A03 Inverter – Wiring Compartment Must use G0080060 Kit ATS Accessory Port Gen Inhibit L1 & L2 Gen Gen Control Control 1&2 1&2 Inverter P1 & ATS 26-16 AWG wire P2 Control Generator Control Wires Min. Cat 5 cable w

  29. Slide 29: Inverter Setpoints

    Inverter Setpoints AC Generator Integration Setpoint Range Default Notes EnaIslanding on / off on Must be set to “on” when integrating an AC generator into a PWRcell installation. NumTranSwtchs For Flexible Coverage installations, this must be “1” (Formally called 0/1/2 0 For Whole-Home installation

  30. Slide 30: Generator Control Modes

    Generator Control Modes AC Generator Integration Generator Control Mode Grid Outage Behavior • Support backup loads initially with PWRcell Single Transfer (0) • When needed, transfer backup loads to the Generator for the rest of the outage • Support backup loads initially PWRcell • When needed, tran

  31. Slide 31: Generator Control Criteria

    Generator Control Criteria AC Generator Integration While using “Single Transfer” or “Source Cycling” control modes, PWRcell will use a number of conditions to determine when the generator should be automatically turned ON or OFF. Turning the generator ON • Either of these conditions must be met: •

  32. Slide 32: Manual Override

    Manual Override AC Generator Integration • Manual Override commands for an integrated generator can be accessed from the Inverter device page on the ICM. • Manual Override commands will not modify the selected generator control mode. • PWRcell must be in Island mode for the generator to turn on. Com

  33. Slide 33: Flexible Coverage

    Flexible Coverage AC Generator Integration Flexible Coverage Homeowners who have opted for Target sub-panel backup but would like Customer the option for whole-home coverage as needed. • Automatic Standby Generator sized for application Hardware • SE-rated PWRcell ATS* Requirements • Protected Loads

  34. Slide 34: Whole Home

    Whole Home AC Generator Integration Flexible Coverage Homeowners with extended PWRcell battery capacity who Target desire whole-home coverage at all Customer times in an outage regardless of the power source. • Automatic Standby Generator sized for application Hardware • 200A SE-Rated PWRcell ATS* R

  35. Slide 35: Questions?

    Questions? AC Generator Integration CONFIDENTIAL 8/18/2022 35

  36. Slide 36: Ongoing Support:

    Ongoing Support: Follow Up email will be sent 1-2 days post Technical Webinar – will include: • Technical Webinar Specific Materials AC Coupling Technical AC Coupling Technical Webinar Slides Webinar Recording CONFIDENTIAL 8/18/2022 36

  37. Slide 37: & ALL AC Coupling Materials

    & ALL AC Coupling Materials AC PV Coupling AC Coupling with Firmware Update AC Gen Integration PWRcell Overview How-To Video Spec Sheet Spec Sheet Video PWRgenerator vs. AC Gen Integration Single Line Application Social Media Posts Email Assets for Comparison Sheet Diagrams Note for Installers Insta

  38. Slide 38: Ongoing Support

    Ongoing Support • Generac.com/ceinstaller • Manuals, spec sheets, SLDs, and more! • Technical Service • 855-635-5186 > Option #3 • Pwrcelltechsupport@generac.com • Inside Sales • 855-635-5186 > Option #1 • Pwrcellsales@generac.com CONFIDENTIAL 8/18/2022 38