Yancoal Australia Ltd. · ASX:YAL
Yancoal Australia — Corporate Update (May 2021)
19 slides from Yancoal Australia's corporate update, May 2021
Slide 1: Duralie Coal CCC Meeting Presentation – Company Report & Overview of Activities
Duralie Coal CCC Meeting Presentation – Company Report & Overview of Activities May 2021 Michael Plain Environment & Community Superintendent
Slide 2: Table of Contents
Table of Contents 1. Agenda Item 7a - Progress at the Mine 2. Agenda Item 7b - Environmental Reporting 3. Agenda Item 7c - Environmental Management Plans & Monitoring 4. Agenda Item 7d - Community Complaints 5. Agenda Item 7e - Community Programs 2 17 May 2021 2
Slide 3: 1. Progress at the Mine
1. Progress at the Mine Total Waste Total ROM Coal (BCM) (T) Q1 2021 190,600 0 Quarter 1 2021 ▪ Mining operations re-commenced at Duralie during in February 2021. ▪ Blasting recommenced in February 2021. ▪ PAF rehandle continued. ▪ First coal mined in April 2021. Railing proposed July 2021. ▪ Rehabi
Slide 4: 2. Environmental Reporting & Regulators
2. Environmental Reporting & Regulators Management Project Status Area Reporting • Duralie Coal Mine Independent • 3-yearly audit undertaken in December 2020 by Ken Holmes of Barnett & May. The Environmental Audit audit report has been finalised and submitted in March 2021. Copies will be made publi
Slide 5: 3. Environmental Management Plans & Monitoring
3. Environmental Management Plans & Monitoring a) Air Quality Management b) Blast Management c) Noise Management d) Water Management e) Rehabilitation Management f) Biodiversity Management g) Mine Closure Planning 5 17 May 2021 5
Slide 6: 3a. Air Quality Management
3a. Air Quality Management Management Area Project Status Air quality monitoring • Real-time air quality system • The real-time air quality TEOM monitor on Martins Crossing Rd continues to operate. • HVAS & dust gauge • General ambient PM10 dust levels have been very low throughout monitoring networ
Slide 7: 3a. Air Quality Management – Dust Gauge Monitoring
3a. Air Quality Management Duralie Dust Gauge Monitoring - Annual Rolling Average 12 Months to March 2021 4.5 Dust (g/m2/month) 4.0 3.5 3.0 2.5 2.0 1.5 1.0 0.5 0.0 Apr-20 May-20 Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Jan-21 Feb-21 Mar-21 D3 D4 D5 D7 D8 D9 D10 D12 D13 DP&E limit Jun-20 D3 V
Slide 8: 3a. Air Quality Management – HVAS Monitoring (PM10)
3a. Air Quality Management Duralie HVAS Monitoring (PM10) 60 12 Months to March 2021 50 PM10 (µg/m3) 40 30 20 10 0 10-Mar-20 29-Apr-20 18-Jun-20 7-Aug-20 26-Sep-20 15-Nov-20 4-Jan-21 23-Feb-21 14-Apr-21 High Noon Twin Houses Hattam Edwards DP&E Limit Duralie HVAS Monitoring (PM10) Annual Rolling Ave
Slide 9: 3b. Blast Management
3b. Blast Management Management Project Status Area Blasting • Blast monitoring • Blast activities at the DCM were recommenced on 17/3/2021 • Blasting will be undertaken in discrete periods during 2021 with only a limited number of blasts required. Ground Overpressure Overpressure Ground Fisher-Webs
Slide 10: 3c. Noise Management
3c. Noise Management Management Project Status Area Noise • Routine Monitoring • Quarterly monitoring continued during Q1 2021. All results were compliant with noise Monitoring criteria. • Noise reports are made available on the Duralie Coal website. • Routine quarterly noise monitoring of operation
Slide 11: 3d. Water Management
3d. Water Management Management Project Status Area Site Water • Annual water balance review. • The 2020 annual site water balanced has been prepared. A summary will be included in Management the Annual Review 2020/21 and will be available on the Duralie Coal website. Surface Water • Rainfall events
Slide 12: 3d. Water Management – Rainfall and Surface Water Monitoring
3d. Water Management Duralie Mine Site - Monthly Rainfall Duralie Surface Water Monitoring - pH 3 months to March 2021 600 10 9 Rainfall (mm) 400 8 7 200 6 0 5 04-Jan-21 03-Feb-21 05-Mar-21 04-Apr-21 2021 JAN MAR 2020 MAY JUL SW2 - DCPL (CSC) SW2 RC - Rail Culvert DCPL (CSC) SW6 - DCPL 2019 SEP NOV
Slide 13: 3e. Rehabilitation Management
3e. Rehabilitation Management Management Area Project Status Rehabilitated Waste • Rehabilitation Works • Currently rehabilitation works involve bulk shaping to achieve final landform designs. emplacements Bulk shaping near the water fill point area has been completed during Q1 2021. • Rehabilitatio
Slide 14: 3f. Biodiversity Management
3f. Biodiversity Management Management Project Status Area Biodiversity • Revegetation works • 2021 Revegetation planting has been completed. Approximately 36,100 native tubestock over Offset 114 hectares on the eastern side of Johnsons Creek Road have been planted during H1 2021 in the biodiversity
Slide 15: 3f. Biodiversity Management – Flora/Fauna and Weed Control
3f. Biodiversity Management Management Project Status Area Flora/Fauna • Nest Box Program • Annual Nest box monitoring was undertaken during November 2020 including the new nest boxes in the rehabilitation area . A summary of the nest box progress will be included in the next Annual Review. Approxim
Slide 16: 3g. Mine Closure Planning
3g. Mine Closure Planning Note: *Refer to Duralie Mining Operations Plan & Rehabilitation Management Plan Table 13 Mine Closure Planning Schedule. *Further detail on mine closure planning progress is included in the Annual Review 2019/20. Management Project Status Area Mine Closure • Stakeholder • C
Slide 17: 3g. Mine Closure Planning – Environmental Management Plans
3g. Mine Closure Planning Note: *Refer to Duralie Mining Operations Plan & Rehabilitation Management Plan Table 13 Mine Closure Planning Schedule. *Further detail on mine closure planning progress is included in the Annual Review 2019/20. Management Project Status Area Environmental • EMP reviews fo
Slide 18: 4. Community Complaints
4. Community Complaints Duralie Complaint Summary Period: 01/01/2021 - 30/4/2021 Period: 3 Months Total No. of Complaints: 0 (0 noise, 0 blast, 0 air quality, 0 other) Total No. of Complainants: 0 Date/Time of Method of Nature of Complaint Complainant Location Complaint Complaint Investigation/Outco
Slide 19: 5. Community Programs
5. Community Programs Management Area Project Status Support Programs Stratford Coal • The presentation night for Stratford Coal Community Support Program for 2021 was held on Community Support Thursday, 29th April 2021 at the Stroud Country Club. Stratford Coal has granted over $84,000 Program in f