Parkway Corporate Limited · ASX:PWN

Parkway Corporate — Potash West NL — Mines and Money Australia Day 2012

18 slides from Parkway Corporate's conference presentation, Dec 3, 2012

  1. Slide 1: Disclaimer

    Disclaimer Disclaimer This document has been prepared by Potash West NL (“Potash” or the “Company”). It should not be considered as an offer or invitation to subscribe for or purchase any securities in the Company or as an inducement to make an offer or invitation with respect to those securities. N

  2. Slide 2: Disclaimer

    Disclaimer This document has been prepared by Potash West NL (“Potash” or the “Company”). It should not be considered as an offer or invitation to subscribe for or purchase any securities in the Company or as an inducement to make an offer or invitation with respect to those securities. No agreement

  3. Slide 3: Company Snapshot

    Company Snapshot Snapshot Capital Structure ASX Code: PWN Elsinore Energy 15% 12.5m ADR OTC-QX Code: PWNNY Contingent Entitlement 18% 15m Share Price: (As at 22 Nov 2012) AU$0.28 Shares Market Cap: AU$23m Other shares 67% 56.4m Shares on Issue: 84m TOTAL 100% 83.9m 12 Month range: AU$0.15 – 0.35 % E

  4. Slide 4: Investment Case

    Investment Case • Potash West is creating an opportunity in the global fertiliser industry, by: • Making potash from one of the worlds largest glauconite deposits Sulphate Chloride Greensand Glauconite Potash products 4

  5. Slide 5: Fertiliser Business

    Fertiliser Business • Three elements are needed in 10s and 100s of kg per hectare: • N, Nitrogen • P, Phosphorous • K, Potassium • Not interchangeable ACN 147 346 334 Image (Above): Effect on wheat crops • Different crops = different ratios • Fertiliser blenders mix products for Image (Below): Effec

  6. Slide 6: Potash Usage Rates

    Potash Usage Rates Kg KCl per hectare Bananas Sugar Cane Tomatoes ACN 147 346 334 Oil Palm Corn Wheat Rice Soybeans 0 500 1000 1500 2000 2500 3000 Image (Above): Effect of K on rice 6

  7. Slide 7: Population Dynamics

    Population Dynamics 10 0.45 Population (Billions) LHS 9 0.4 Arable Land per person (hectares) RHS 8 0.35 7 0.3 6 0.25 5 0.2 4 0.15 3 2 0.1 1 0.05 0 0 1960 1970 1980 1990 2000 2010 2020 F 2030 F 2040 F 2050 F 7

  8. Slide 8: Potash Market

    Potash Market Price of Potash 1000 900 KCl US$/t, FOB Vancouver 800 700 600 500 400 300 200 100 0 8

  9. Slide 9: Market Opportunities

    Market Opportunities • Australia consumes ~ half a million tpa potash, all imported • WA and QLD 40% each. WA prefers K2SO4 (price premium) • There is no potash production in Australia, • Project located within Australia’s largest potash consuming area • Established domestic infrastructure • Establi

  10. Slide 10: Project Location

    Project Location • +2900 km2 of prospective area • ~150km of strike • ~+20km width • Many intersections +20m • Great infrastructure • Close to local markets • Close to rail and export ports 10

  11. Slide 11: Aggressive Work Programme

    Aggressive Aggressive Work Work Programme Programme • IPO • Stratigraphic drilling • Commence process testwork 100% 90% 80% • Resource targets identified K, % extraction… Extraction (%) 70% 60% • Flowsheet identified 50% 40% 30% • JORC resource 20% 10% 0% • Scoping study results (Dec 2012) 0 2 4 6 8

  12. Slide 12: Results to Date, Drilling

    Results to Date, Drilling • Target areas identified from stratigraphic drilling, throughout Dandaragan Trough • Most areas fit geological model, shown below • Initial JORC resource of 122 Mt @ 4.6%K2O announced, 11 October 2012 12

  13. Slide 13: Dinner Hill

    Dinner Hill • Total Resource 244 Mt @ 3.0%K2O (October 2012) • Including 122 Mt @ 4.6%K2O Within less than 20% of Dinner Hill target area 13

  14. Slide 14: Flow Sheet

    Flow Sheet Chemical Greensands ore Glauconite plant Concentrate Bulldozer mining, pumping Primary Leaching Crystallisation Primary Upgrade Plant Co-Product Co-Product Separation Recovery Leach residue Aluminium, Potash Iron & products Phosphate Tails back Co-products to pit 14

  15. Slide 15: Medium Term Plan

    Medium Aggressive termWork PlanProgramme ACTIVITY COMPLETION Scoping study results Dec 2012 Bankable feasible study Dec 2013 Financing June 2014 Construction Dec 2015 Commissioning Early 2016 250,000 tpa Potash production Mid 2016 15

  16. Slide 16: Value Proposition, Potash Explorers

    Value Proposition, Potash Explorers Company Projects Location Status Market Cap Western Potash (TSX: WPX) 2 MOP Canada 1 Expl C$88M 1 Resource Athabasca Potash (TSX: API) MOP Canada Takeover by BHP, C$341M 2009 Sirius Minerals (AIM: SXX) 3 MOP UK, Australia, Resource 1 MOP/SOP USA 1.35 Bt@ 25.6 % K2

  17. Slide 17: Investment Highlights

    Investment Highlights • Exposure to the booming potash business • Tight capital structure • The company has a skilled & experienced management team • High extraction possible with simple technology • technical programme well advanced • Techniques applicable to other deposits, • valuable IP being dev

  18. Slide 18: Questions?

    Questions? Patrick McManus Unit 3 Managing Director 23 Belgravia Street Mobile +61 (0) 408 956 798 Belmont WA 6104 patrick.mcmanus@potashwest.com.au PO Box 588 Adrian Griffin Belmont WA 6984 Chairman Mobile +61 (0) 418 927 658 Phone +61 (0) 8 9479 5386 adrian.griffin@potashwest.com.au Fax +61 (0) 8

Potash West NL — Mines and Money Australia Day 2012 on 6ix