TransGlobe Energy — Shareholder Meeting (May 2016)
15 slides from TransGlobe Energy's shareholder meeting presentation, May 12, 2016
Slide 1: TransGlobe Energy AGM Presentation
TRANSGLOBE ENERGY AGM PRESENTATION May 12th 2016
Slide 2: Eastern Desert Development - K South Plan
EASTERN DESERT DEVELOPMENT-K SOUTH PLAN • South K OOIP: ~ 55 MMbo • Production to date: 5.8 MMbo (10.5% recovery) • Drilled K-48 in April Cased as Asl A oil well Encountered 33 meters (108 ft.) net oil pay* K-48 Targeting production in Q2 • Two additional K-South wells in the plan for 2016 • I
Slide 3: Cautionary Statement
CAUTIONARY STATEMENT This presentation may include certain statements that may be deemed to be “forward-looking statements” within the meaning of the U.S. Private Securities Litigation Reform Act of 1995. Such statements relate to possible future events. All statements other than statements of histo
Slide 4: Undervalued with Balance Sheet Strength
UNDERVALUED WITH BALANCE SHEET STRENGTH CAPITAL STRUCTURE (US$) Shares Outstanding (10/05/16) ~72.2 Million Market Capitalization (10/05/16) $140.1 Million Debt (31/03/16) $66.5 Million Working Capital (31/03/16) $75.2 Million Enterprise Value ~$64.9 Million RESERVES 2P Reserves (31/12/15) 28.7 MMBb
Slide 5: Oil Marketing
OIL MARKETING • Marketing has improved liquidity, $140,000 EGPC AR Outstanding decreased credit risk and $120,000 $100,000 resulted in West Bakr production $80,000 being sold at market price $60,000 $40,000 • TransGlobe marketed and sold $20,000 1,601,038 barrels during 2015 $0 Dec-14 Mar-15 Jun-15
Slide 6: Investment Highlights
INVESTMENT HIGHLIGHTS 1.5 Million gross acres of land • 2016 Exploration focus 8 Projects in Egypt (100% WI) In Eastern Desert, drill up to 22 exploration prospects Strong balance sheet with net working In Western Desert, interpret new 3-D in South capital of $75.2MM (31/03/16) Ghazalat and pr
Slide 7: Eastern Desert Exploration Program
EASTERN DESERT EXPLORATION PROGRAM Red Bed Prospects • 8 prospects (COS 17% avg) • 4-12 mmbbls prospective resource** NWG 29 - Drilling (1st well in 2016 program) Miocene Clastic Prospects • 8 prospects (COS 32% avg) • 2-8 mmbbls prospective resource** Pre-Rift Prospects • 6 prospects (COS 18% avg)
Slide 8: West Gharib/West Bakr: 100% WI - Operated
WEST GHARIB/WEST BAKR: 100% WI - OPERATED Eastern Desert Production • Q1-2016 – 12,058 Bopd • Q2-2016 Est - ~10,800 Bopd 2016 Plan • Optimization and cost reduction • Integration of the West Bakr and West Gharib JV’s • Maintenance/optimization projects • K South development at West Bakr Drilled K-
Slide 9: NW Gharib: 100% WI - Operated
NW GHARIB: 100% WI - OPERATED NWG #3 2016 Plan • Progress three (NWG #1, #3 & #5) oil developments toward first NWG #1 production in late 2016 1st 2016 Exploration • ~500-900 Bopd initial NWG Well production potential* #5 • Drill up to 13 new exploration prospects NWG SWG * Internally estimated 9
Slide 10: Eastern Desert Development - K South Plan
EASTERN DESERT DEVELOPMENT-K SOUTH PLAN • South K OOIP: ~ 55 MMbo • Production to date: 5.8 MMbo (10.5% recovery) • Drilled K-48 in April Cased as Asl A oil well Encountered 33 meters (108 ft.) net oil pay* K-48 Targeting production in Q2 • Two additional K-South wells in the plan for 2016 • I
Slide 11: Egypt Assets: Western Desert
EGYPT ASSETS: WESTERN DESERT • Three operated concessions • Map & evaluate the 2015 South Ghazalat 3-D • Prepare for NW Sitra 3-D seismic acquisition program 11
Slide 12: South Ghazalat Seismic Dip Line
SOUTH GHAZALAT SEISMIC DIP LINE Rift Margin Edge Several structures along rift margin • Excellent quality data from & Tertiary Seal U. Cretaceous 2015 3D acquisition • The rift margin is well imaged with good data to Jurassic U. Cretaceous Reservoirs level • Early work is showing several structures
Slide 13: South Ghazalat Seismic Strike Line
L. Jurassic U. Cretaceous U. Cretaceous Cretaceous Reservoirs & Tertiary Seal Reservoirs Reservoirs 13 SOUTH GHAZALAT SEISMIC STRIKE LINE L. Jurassic Cretaceous Reservoirs Reservoirs U. Cretaceous U. Cretaceous Reservoirs & Tertiary Seal
Slide 14: Summary
SUMMARY Opportunity rich Attractive valuation Average Q1 production of ~12,058 Bopd Strong balance sheet, $75.2MM positive working capital @ March 31st, 2016 $122.0MM in cash @ March 31st, 2016 Growth potential with a large drilling campaign in 2016 and 2017 14
Slide 15: TransGlobe Energy AGM Presentation
TRANSGLOBE ENERGY AGM PRESENTATION May 12th 2016