  1. Slide 1: Chairman's Address & Presentation to 2021 Annual General Meeting

    ASX ANNOUNCEMENT 29 NOVEMBER 2021 CHAIRMAN’S ADDRESS & PRESENTATION TO 2021 ANNUAL GENERAL MEETING In accordance with Listing Rule 3.13.3 we attach a copy of the Chairman’s Address and the Company Presentation to be delivered today at the 2021 Annual General Meeting. This report has been authorised

  2. Slide 2: Chairman's Address Annual General Meeting 2021

    CHAIRMAN’S ADDRESS ANNUAL GENERAL MEETING 2021 Welcome, Ladies and Gentlemen. My name is Peter Schubert, Chairman and CEO of Magnetite Mines Limited, and on behalf of the Board, I want to thank you for participating in today’s Magnetite Mines Annual General Meeting, being held physically in Perth an

  3. Slide 3: Chairman's Address: PFS, DFS and team appointments

    The PFS study work completed and announced in July this year was a transformational moment for the Razorback project demonstrating the opportunity for a high-grade, high-return, long-life operation which leverages the advantages of staged development, available infrastructure and low-cost sustainabl

  4. Slide 4: Chairman's Address: stakeholders, Muster Dam and iron ore market

    driving our integration of grid-connected renewable power supply while simultaneously delivering value to shareholders, stakeholders and supply chain partners alike. Engagement is deepening with key stakeholders, including multiple SA government agencies, local landholders and Ngadjuri Nation native

  5. Slide 5: Chairman's Address: staged development and closing

    We believe our low-capital staged development approach, and the fact that your Company owns 100% of the Razorback Iron Ore Project, will stand us in good stead as we advance financing options. Finally, I would like to thank all members of the Magnetite team for their efforts and focus on acceleratin

  6. Slide 6: Magnetite Mines Limited Annual General Meeting

    Magnetite Mines Limited (ASX:MGT) Annual General Meeting November 29, 2021

  7. Slide 7: Disclaimer

    Disclaimer IMPORTANT NOTICE The purpose of this presentation is to provide general information about Magnetite Mines Limited ("MGT"). It is not recommended that any person makes any investment decision in relation to MGT based on this presentation. This presentation contains certain statements which

  8. Slide 8: Company Strategy

    Company Strategy Opening up the Braemar in stages SOUTH AUSTRALIA Low capital, long Favourable life development business setting is readily with growing iron fundable with ore demand, high returns5 premiums for high grade products and Large Razorback Experienced team limited new supply resource with

  9. Slide 9: Premium Grade is a Major Advantage

    Premium Grade is a Major Advantage The Iron Ore Market “ CRU: “Steelmakers need to adopt best practices that prioritise decarbonisation with existing assets. Some of these best practices include installation of energy efficient technology, optimisation of the blast furnace (BF) burden (e.g. with hig

  10. Slide 10: Favourable Location

    Favourable Location LARGE, ACCESSIBLE MINERAL RESOURCES  Company Mineral Resources of 5.7Bt including Muster Dam1,2,3*  240km to Adelaide from Razorback ESTABLISHED INFRASTRUCTURE NEARBY  Heavy freight open access rail  High voltage powerlines connected to main Australian grid FAVOURABLE REGION

  11. Slide 11: Simple Mining with Head Grade Upside

    Simple Mining with Head Grade Upside  Ore mined from surface – minimal pre-strip5  Ore haul for initial box cut all downhill, flat waste dumps  Low PFS strip ratio of 0.16:1  Grade uplift potential from selective mining and/or ore sorting  Lateral stratigraphic continuity  New geophysics regre

  12. Slide 12: Existing Transport Infrastructure

    Existing Transport Infrastructure Minimal Capital • 50km purpose built private all weather haul road and rail siding – vicinity Yunta5 • Existing open access heavy freight network – 25t axle loads • Existing iron ore ports (i.e Whyalla) with capacity 7 7

  13. Slide 13: Existing Power Infrastructure

    Existing Power Infrastructure Minimal Capital • 132kV Transmission Line connecting to grid at Robertstown5 • Access to competitive energy with high renewables content • Built under long term Transmission Service Tariff – no upfront capex 8 8

  14. Slide 14: Successful Razorback PFS

    Successful Razorback PFS Focused on Development Key Financial and Production Metrics Unit Head Grade Improvement Case* Razorback PFS confirmed long life Iron ore price (62% Fe) US$/t 110 150 initial development leveraging LOM Ore mined (100% reserves) Mt 472.7 472.7 resource scale, low stripping rat

  15. Slide 15: Unlocking the Braemar

    Unlocking the Braemar Large Resource, Long Life AREA (KM2) STRIKE (KM) TONNES (MT) TENURE1,2,3 1700 13 5700 PFS RELIES ON ONLY RAZORBACK REGION1,2 1500 20 4200 8% 4% 0.3% RAZORBACK RESOURCE1 20 12 3000 of resource of Braemar strike of tenure area PFS RESERVE4 5 5 473 10

  16. Slide 16: Robust Economics

    $- $50 $100 $150 $200 $250 Jul-05 Dec-05 May-06 Oct-06 Mar-07 Aug-07 Jan-08 Jun-08 Nov-08 Apr-09 Sep-09 Feb-10 Jul-10 Dec-10 May-11 Oct-11 Mar-12 Aug-12 Jan-13 Jun-13 Nov-13 Apr-14 Robust Economics Sep-14 Feb-15 Jul-15 Dec-15 May-16 Oct-16 Mar-17 Aug-17 Iron Ore prices, 62% CFR Jan-18 Jun-18 Nov-18

  17. Slide 17: Financing

    Financing Attractive Risk Profile for Lenders CONVENTIONAL EQUITY PROJECT A$670M CAPEX ENGAGE WITH FUNDING FINANCE (incl. $120m DEBT SENIOR DEBT TO FOLLOW based capital structure contingency) – within FINANCIERS market capacity5 PROJECT envisaged for mine Q4 2021 construction funding FINANCING 25+ y

  18. Slide 18: Building strong ESG platform

    Building strong ESG platform Environmental Social & Accountable People Sustainability Community Inclusion Governance & Culture • GHG accountability • Free, prior and informed • Planned ESG framework • Teamwork • Maximising renewable consent model – informed and reporting system • Individual capacity

  19. Slide 19: Advancing Project Approvals and Access

    Advancing Project Approvals and Access Area Status Upcoming Activities SA Government approvals pathway confirmed, Preparation of approvals documentation Approvals with supportive regulator (low jurisdictional risk). Targeted approval award – 2023 SA Government consultation underway Broad and targete

  20. Slide 20: Indicative Development Schedule

    Indicative Development Schedule 1 1. Schedule subject to review as part of DFS currently underway 15

  21. Slide 21: Key Milestones

    Key Milestones Progress & Critical Work Planned Progress on key milestones:  Delivered a successful PFS in July 2021 demonstrating financial and technical viability of Razorback project  Assembled Owners Team and commenced DFS  Commenced drilling programs at Razorback, appointed drilling contract

  22. Slide 22: Delivering Premium Iron Ore to high demand markets

    Delivering Premium Iron Ore to high demand markets Long Life Low Initial High Grade with Optionality Project Capital Product Delivering Large 5.7Bt Staged Razorback 68% Fe product5 First ore on ship resources development with • Higher than any of the planned for late routinely with expansion ESG adv

  23. Slide 23: Magnetite Mines: High Grade Iron Ore Concentrate

    MAGNETITE MINES High Grade Iron Ore Concentrate

  24. Slide 24: References

    References 1. ASX Announcement – 24/05/21 – Razorback Iron Project Mineral Resource Upgrade 2. ASX Announcement – 20/11/18 – Ironback Hill Deposit – JORC 2012 Resource Update 3. ASX Announcement – 01/03/21 – Muster Dam Iron Project Tenements awarded to Magnetite Mines 4. ASX Announcement – 30/06/21

  25. Slide 25: Mineral Resources & Ore Reserves

    Mineral Resources & Ore Reserves • May Razorback resource upgrade5 (JORC 2012) delivered 50% of total resource in the Indicated category JORC Million Mass Re Fe% SiO2% Al2O3% P% LOI% Magnetite % Resources Tonnes (eDTR%) Classification (dry) Indicated 1,494 15.6 18.5 47.9 8.0 0.18 5.4 15.0 Inferred 1