Alamos Gold Inc. · TSX:AGI

Alamos Gold — Investor Presentation (December 2014)

32 slides from Alamos Gold's investor presentation, December 2014

  1. Slide 1: December 2014 Corporate Presentation

    December 2014 Corporate Presentation

  2. Slide 2: Cautionary Notes

    Cautionary Notes Cautionary Notes No stock exchange, securities commission or other regulatory authority has approved or disapproved the information contained herein. Certain statements in this presentation are “forward-looking statements”, including within the meaning of the United States Securitie

  3. Slide 3: Alamos Well Positioned for Low-Cost Growth

    Alamos Well Positioned for Low‐Cost Growth • Mid‐tier gold producer • Mexico (Sonora State): own and operate the Mulatos Mine • 2014 guidance of 150,000‐170,000 ounces at all‐in sustaining costs1 below $1,000 per ounce • Low cost production growth from Cerro Pelon and La Yaqui in 2016 • Low‐cost gro

  4. Slide 4: Mulatos – Proven, Low Risk, High Reward Strategy

    Mulatos – Proven, Low Risk, High Reward Strategy $10m $70m $350m cost to acquire initial capital raised to free cash flow Mulatos in 2003 build Mulatos generated to date Long term track record of capital discipline…. 1 Please refer to Cautionary Notes on non‐GAAP Measures and Additional GAAP Measure

  5. Slide 5: Track Record of Delivering Shareholder Value

    Track Record of Delivering Shareholder Value Return on Equity – 5 Year Average 20 15.2% 15 13.9% 12.8% 10 8.8% 4.5% 4.2% 5 3.3% 2.8% 2.6% 0.5% 0 AGI SMF CG NEM BTO ELD YRI G IMG NGD AEM AUQ ABX K ‐1.2% ‐5 ‐5.7% ‐10 ‐8.2% ‐11.8% ‐15 Source: Capital IQ 5

  6. Slide 6: Strong Growth Profile – Proven Strategy

    Strong Growth Profile – Proven Strategy We intend on replicating this success many times over… Cerro Pelon & La Yaqui Open pit, heap leach projects Kirazlı Total acquisition cost • Low capital intensity Ağı Dağı • <$150m Çamyurt • ~$20/oz of • Low operating costs Esperanza resource1,2 • Low technica

  7. Slide 7: Strong Growth Profile – Fully Funded

    Strong Growth Profile – Fully Funded • Fully funded growth – $375m cash and ongoing cash flow generation • Further potential upside through Çamyurt & Quartz Mountain 500 400 Production (000 oz Au) 300 200 100 0 Esperanza 2006 2007 2008 2009 2010 2011 2012 2013E 2014E Kirazlı & Ağı Dağı Mulatos 7

  8. Slide 8: Mulatos Mine – Our Foundation

    Mulatos Mine – Our Foundation Project: Open pit, heap leach Location: Sonora State, Mexico Ownership: 100% interest Stage: Producing Total Throughput: 17,700 tpd • Mine life of 8 years based on YE 2013 reserves • Generated ~$350m in free cash flow to date • Large exploration package (30,325 ha/117 s

  9. Slide 9: Mulatos Mine – Q3 2014 Highlights & 2014 Guidance

    Mulatos Mine – Q3 2014 Highlights & 2014 Guidance Operating Data Q1 2014 Q2 2014 Q3 2014 YTD 2014 2014E Guidance Production oz Au 37,000 33,000 28,000 98,000 150,000 ‐ 170,000 Cash Operating Costs1 US$/oz $546 $595 $719 $617 $630‐670 Total Cash Costs1 US$/oz $617 $663 $784 $686 $700‐740 All‐in Susta

  10. Slide 10: Mulatos Mine – Transition Year

    Mulatos Mine – Transition Year See mineral reserve and resource estimates and associated footnotes in appendix. 10

  11. Slide 11: Mulatos Mine – San Carlos on Track

    Mulatos Mine – San Carlos on Track Transitioning to San Carlos underground for high grade mill feed • Initial mill production achieved in October 2014 • 25,000 t stockpiled at the end of Q3 above mineral reserve grade of 7 g/t San Carlos UG1 Tonnes Grade Ounces (Au) (g/t Au) Contained Recoverable2 2

  12. Slide 12: Mulatos Mine – Cerro Pelon & La Yaqui Satellite Projects

    Mulatos Mine – Cerro Pelon & La Yaqui Satellite Projects Incremental low‐cost production growth starting in 2016 • Production additive • Independent crushing circuit & heap leach pads • Average production of 33,000 oz per year over 5 year mine life • Peak production of ~50,000 oz per year • Higher g

  13. Slide 13: Turkey – Low-Cost Production Growth

    Turkey – Low‐Cost Production Growth Projects: Open pit, heap leach Location: Turkey Ownership: 100% interest Stage: Development • Excellent infrastructure; low technical risk • Ağı Dağı EIA approved August 2014 2012 Positive Pre‐feasibility Study – Summary1 Kirazlı Ağı Dağı Mine Life Years 5 7 Avera

  14. Slide 14: Esperanza Gold Project – Significant Growth Potential

    Esperanza Gold Project – Significant Growth Potential Project: Open pit, heap leach Location: Morelos State, Mexico Ownership: 100% interest Stage: Development • Excellent infrastructure; low technical risk • Low capital intensity and operating costs • Average annual production potential > 100,000 o

  15. Slide 15: Quartz Mountain Property – Compelling Opportunity

    Quartz Mountain Property – Compelling Opportunity Location: Oregon, United States Ownership: Right to earn a 100% interest Stage: Advanced Exploration • Located on northern extension of the prolific Basin and Range Province of Nevada • Low strip ratio, favourable metallurgy2 • Aligned with our strat

  16. Slide 16: Alamos – Value Proposition

    Alamos – Value Proposition 8.00 7.00 6.00 5.00 $4.42 US$/share 4.00 $7.37 3.00 2.00 $3.32 $2.95 1.00 0.00 3 2 2 Current Share Price Cash/Share Working Capital/Share Implied Value for Mulatos, Turkey, Esperanza & Quartz Mountain 3 1 Please refer to Cautionary Notes on non‐GAAP Measures and Additional

  17. Slide 17: Alamos – Investment Case

    Alamos – Investment Case • Mid‐tier gold producer with strong, low‐cost growth profile • Robust balance sheet – fully funded development pipeline • Track record of delivering shareholder value • Catalysts  Q2 2014: Acquired surface rights at La Yaqui & Cerro Pelon  Q3 2014: Initial drill permit gr

  18. Slide 18: Appendices

    Appendices 18

  19. Slide 19: Robust Balance Sheet

    Robust Balance Sheet Cash & Cash Equivalents1 ~US$375 million Working Capital1 ~US$425 million Debt None Gold Hedging None Semi‐Annual Dividend US$0.10/share Shares Outstanding1 127.4 million Warrants1 7.2 million Employee Options1 4.8 million Fully Diluted 139.3 million Recent Share Price (TSX)2 C$

  20. Slide 20: Board of Directors and Executive and Management Team

    Board of Directors and Executive and Management Team Board of Directors Executive and Management Team Paul J. Murphy Chairman John A. McCluskey President and Chief Executive Officer John A. McCluskey Director Jamie Porter Chief Financial Officer David Gower Director Manley Guarducci Vice President a

  21. Slide 21: Growing Resource Base Enables Production Growth

    Growing Resource Base Enables Production Growth1 12 P&P Reserves 2.03 Measured & Indicated 10 Inferred 8 2.37 M&I resources Au oz (millions) 2.39 6.67 increased 24%1 2.39 6 2.39 4 5.08 Inferred resources1 2.05 1.69 4.98 increased 142% 1.92 3.18 4.40 reflecting 2 acquisitions of 1.66 3.68 1.58 1.93 E

  22. Slide 22: Resource Growth on an Aggregate and Per Share Basis

    Resource Growth on an Aggregate and Per Share Basis1 100 P&P Reserves (per 1,000 shares) 90 Measured & Indicated (per 1,000 shares) 16 Inferred (per 1,000 shares) 80 70 Au oz per 1,000 shares 20 60 20 22 21 52 50 40 21 18 42 30 29 42 38 20 17 20 29 10 11 14 13 5 8 8 0 2007 2008 2009 2010 2011 2012 2

  23. Slide 23: Mulatos: The High-Grade Story Continues

    Cerro Pelon Mulatos: The High‐Grade Story Continues East Estrella Estrella PdA El Salto/ PdA Mina Vieja Extension Escondida Gap El Victor April 2013 LEGEND Mineralized trends San Carlos +1 opt intercepts

  24. Slide 24: Mulatos District Alteration Map

    Mulatos District Mulatos Alteration Map 24

  25. Slide 25: Ağı Dağı Project: Map

    N Ağı Dağı Project: Map Deli Pit Alteration Types Baba Pit Propylitic Argillic Çamyurt Pit Advanced Argillic Silica 2012 Resource Pit Outlines 25 25 1 Please refer to press release dated April 1, 2013 on Reserve and Resource calculations for 2012.

  26. Slide 26: Kirazlı Project: Map

    N Kirazlı Project: Map Kirazlı Pit Alteration Types Argillic Advanced Argillic Silica 2012 Resource Pit Outlines 1 Please refer to press release dated April 1, 2013 on Reserve and Resource calculations for 2012. 26 26

  27. Slide 27: Sustainability

    Sustainability Our commitment to principles of sustainable development has been a critical factor in our success to date, enabling us to maintain our social license from a broad range of stakeholders, including our employees, our shareholders, and our host communities and countries.

  28. Slide 28: Sustainability

    Sustainability • Completed first Annual Sustainability Report pursuant to GRI framework • Our Objectives • As we pursue further growth, we will continue to measure our success as an organization by our performance in achievement of our sustainability objectives: • protecting the health and well‐bein

  29. Slide 29: 2013 Mulatos Proven and Probable Mineral Reserves

    2013 Mulatos Proven and Probable Mineral Reserves 1,2,3,4,5,6,8,9 Proven and Probable Reserves as at December 31, 2013 2 2 2 Proven Probable Proven + Probable Tonnes Grade Contained Tonnes Grade Contained Tonnes Grade Contained Reserve Area (000s) (g/t Au) Ounces (000s) (g/t Au) Ounces (000s) (g/t A

  30. Slide 30: 2013 Total Measured and Indicated Mineral Resources

    2013 Total Measured and Indicated Mineral Resources 1,2,3,4,5,6,7,8,9 Total Measured & Indicated Mineral Resources as at December 31, 2013 Cut‐off (g/t Tonnes Grade Grade Contained Contained Au) (000s) (g/t Au) (g/t Ag) Ounces Au Ounces Ag Mexico Mulatos 0.5 70,200 1.02 2,302,044 San Carlos UG 2.5 6

  31. Slide 31: 2013 Total Inferred Mineral Resources

    2013 Total Inferred Mineral Resources 1,3,4,5,6,7,8,9 Total Inferred Mineral Resources as at December 31, 2013 Cut‐off (g/t Tonnes Grade Grade Contained Contained Au) (000s) (g/t Au) (g/t Ag) Ounces Au Ounces Ag Mexico Mulatos 0.5 9,690 0.95 295,803 San Carlos UG 2.5 8 5.79 1,488 El Realito 0.3 91 0

  32. Slide 32: Scott K. Parsons, CFA

    Scott K. Parsons, CFA Director, Investor Relations 416.368.9932 x 439 sparsons@alamosgold.com

Alamos Gold — Investor Presentation (December 2014) on 6ix