Impala Platinum Holdings Limited · JSE:IMP

Impala Platinum — Fact Sheet (January 2022)

8 slides from Impala Platinum's fact sheet, January 2022

  1. Slide 1: Two Rivers: Respect, Care and Deliver Platinum

    RESPECT, CARE TWOPRIVERS AND DELIVER PLATINUM

  2. Slide 2: Two Rivers Fact Sheet

    FACTSHEET Two Rivers, a joint venture between African Rainbow Minerals (ARM) (54%) and Implats (46%), is managed by ARM. The operation is situated on the farm Dwarsrivier on the southern part of the eastern In FY2021 limb of the Bushveld Complex Two Rivers produced some 35 kilometers south-west of B

  3. Slide 3: Geology

    Impala GEOLOGY Both the Merensky and underlying UG2 Three distinct reef types have been Reefs occur on the property but only defined for the UG2 Reef at Two Rivers, the UG2 is currently exploited. The UG2 namely the ‘normal reef’ with a thick outcrops in the Klein Dwarsrivier valley main chromitite

  4. Slide 4: Mining

    FACTSHEET MINING The UG2 orebody is accessed via two decline shaft systems situated three kilometres apart, namely the Main Decline and the North Decline. Underground mining operations are fully mechanised and the bord and pillar mining method is employed where stoping widths average around 1.8 metr

  5. Slide 5: Sustainable Development and Metallurgy

    Impala SUSTAINABLE DEVELOPMENT Two Rivers is committed to social development initiatives and engages in, develops and builds community relationships. It takes responsibility for economic, social and environmental issues that impact its people, communities and environments and is involved in a number

  6. Slide 6: History and Black Economic Empowerment

    FACTSHEET HISTORY Platinum was first discovered in the area by renowned explorer Hans Merensky on the nearby farm Maandagshoek (now Modikwa Platinum) in the 1920s. During 2001, Assmang elected to dispose of its platinum interests at the Dwarsrivier Chrome mine. Two Rivers Platinum, the JV between Av

  7. Slide 7: Two Rivers – Key Statistics

    Impala TWO RIVERS – KEY STATISTICS TWO RIVERS – KEY STATISTICS FY2021 FY2020 FY2019 Production Tonnes milled ex mine (000t) 3 283 3 016 3 405 Headgrade (6E) (g/t) 3.43 3.45 3.52 6E in concentrate (000oz) 300 261 313 Labour efficiency Tonnes milled per employee costed** (t/man/ 947 911 1 070 annum) C

  8. Slide 8: Contact Details

    CONTACT DETAILS HEAD OFFICE 2 Fricker Road, Illovo, 2196 Private Bag X18, Northlands, 2116 Tel: +27 (11) 731 9000 E-mail: investor@implats.co.za www.implats.co.za Group Executive: Corporate Affairs Johan Theron Tel: +27 (11) 731 9013 E-mail: johan.theron@implats.co.za Executive: Corporate Affairs Em

Impala Platinum Holdings — Fact Sheet (January 2022) on 6ix