Critica Limited · ASX:CRI
Critica — Venture Minerals — Investor Presentation (October 2007)
27 slides from Critica's investor presentation, October 2007
Slide 1: Venture Minerals Ltd (VMS) – Mount Lindsay Project Company Presentation
Venture Minerals Ltd (VMS) Mount Lindsay (Renison West) Project Company Presentation October 2007
Slide 2: Location of Projects
Location of Projects 1,000Km
Slide 3: Capital Structure
Capital Structure Listed on ASX: 22 Sep 2006 Shares on issue: 51.5 million (34.3 million tradeable) Market Cap $18.0 million Management Ownership: 33% Current Cash in bank: A$3.7 million Maximum Share Price: 63c
Slide 4: Directors/Management
Directors/Management Experienced management team in all areas of operations, with a focus on accelerated drill programs M M Mr Mell Ashton; A ht N Non-Executive E ti Chairman Ch i R i Regionall Ch Chairman i att th the IInstitute tit t off Chartered Accountants, a number of other Board Appointment
Slide 5: Location of Mount Lindsay (Renison West) Project
Location of Mount Lindsay (Renison West) Project 1,000Km
Slide 6: Tenement Locations
Ocean Power Station O Mine © Prospect —— Highways ——— Minor Road HE stars 0 10 [__] Granite — (2) uttramate Kilometres EL33/2007 ! Rosebery JO °FS
Slide 7: Savage River Mine
Savage River Mine VENTURE
Slide 8: Magnetite Potential
Magnetite Potential Only 17 of the 81 historic holes have been assayed for Iron in the mineralised Tin zones. 15 of those drill intersections have an average width of 24m at a weighted g average g ggrade of 32%Fe. One drill intersection was selected for initial metallurgical testwork, results
Slide 9: Drill Plan – No.2 Zone
% me " No dl iar 4 + * 5 Granite - Sh es Ss MOUNT LINDSAY-* Drilling —— Faults || MERE Targets Area \ hs VENTURE
Slide 10: Drill Plan – No.2 Zone
Se A +3 PELE Y OSS Granite , » ¢ Me. Sa s4 ° . ‘0, 4 : KO " “ 3 ey ‘ 1% , 3 \ ' : ’ : } H 7 eee i WF. ~~ MOUNT—~ LINDSAY-*” a PSS ee Zi, Res ( Drilling } 0 500 —— Faults | GE Targets Area Meters 4 Cop, € 4 ey CROWN LAND £L21/2005 we ML37 30.5m @ 40.5%Fe from 268 5m} ML41 54.5m @ 34.8%Fe from 270 5m}
Slide 11: ML41,49 & 64 Drill Section
33m @ 31.6%Fe, 0.16%Sn &f Y) 0.05%Cu from 153m Ne 7m @ 24.5% Fe, 0.19%Sn, 4q J/0.08%Cu & 0.14%WO3 from 189m | 4 “a XU 5m @ 22.7%Fe & || —_— 0.12%Sn from 443.3m 2250m RL Hornfels, Sandstones and Mudstones. No2 Carbonate horizon. ca Host to skarn magnetite mineralisation. 54.5m @ 34.8%Fe & 0.17%Sn} fr
Slide 12: 250m NW-ML37 Drill Section
2400m RL Hornfels, Sandstones and Mudstones. 2250m RL No2 Carbonate horizon. Host to skarn magnetite mineralisation. 30.5m @ 40.5%Fe, 0.08%Sn & 0.03%WO3 | 4 < S xc
Slide 13: Long Section-No.2 Zone
Long Section-No.2 Zone N Oe) = ~/ Up 23miof.Skarn Ntersected ~~ = 2300m RL Hornfels, } Sandstones and Mudstones. se 1900m RL Surface ¥ 23.0m @ 29.5%Fe
Slide 14: Drill Plan-Main Zone with No.1 & 2 Zones
Drill Plan-Main Zone with No.1 & 2 Zones
Slide 15: Mount Lindsay Project
Drilling Faults Meters V//, Target Area
Slide 16: Regional Magnetics With Target Zones
Regional Magnetics With Target Zones
Slide 17: Power
» ~<A VENTURE
Slide 18: Road and Rail
Road and Rail we es » ~<A VENTURE
Slide 19: Water
» <4 VENTURE
Slide 20: Port at Burnie
Port at Burnie VENTURE
Slide 21: Current Work Program
Current Work Program ProMet Engineers to do further testwork to determine optimum grind establishment, bond work index and coarse liberation characteristics. Venture has contracted two Drill Rigs with an initial campaign of up to 10,000 metres of Diamond Core and Reverse Circulation Drilling. Th
Slide 22: Location of Churchill Dam
Location of Churchill Dam 1,000Km
Slide 23: Churchill Dam- Drill Targets
Churchill Dam- Drill Targets
Slide 24: Location of Maitland Channel
Location of Maitland Channel 1,000Km
Slide 25: Maitland Channel- Uranium
ee 25 Kilometres Hi © Uranium deposits GSWA Regolith Sampling 3% 5-30ppm Uranium rl >30ppm Uranium t V/A, Drill target areas H LC] Sedimentary basin q [__] Greenstone } N\ [-_] Granite and Gneiss [|__| Tertiary Palaeochannel i uel 1:250 000 Sheet] t= Spmus ek ee
Slide 26: Maitland West Drill Program on Uranium Channel Radiometrics
Maitland West Drill Program on Uranium Channel Radiometrics
Slide 27: THE END
THE END For up to date information please click to our website www.ventureminerals.com.au
Venture Minerals — Investor Presentation (October 2007) on 6ix