  1. Slide 1: Angas Mine – SCCC Presentation

    Angas Mine – SCCC Presentation  Welcome to all, our SCC Committee, local business owners, employees and interested community members.  Current Status – Care and Maintenance as of 31st October  Why Care and Maintenance - Economics – Currently mined 1.9Mt of the approved reserve of 2.5Mt. – Sunter

  2. Slide 2: What's happening at Angas Zinc?

    What's happening at Angas Zinc?  6 employees remaining on site  Mine has been placed under Care and Maintenance  Clean-up work, water and environmental management and monitoring to continue.  Processing plant including mill and floatation area receiving weekly maintenance  Mobile and other equi

  3. Slide 3: Focus for Current Operations

    Focus for Current Operations  Working with DMITRE to ensure ongoing compliance  Water, Dust and Environmental management  TSF management  Mine void AMD management TERRAMIN AUSTRALIA LIMITED

  4. Slide 4: Angas Zinc Mine — Long section

    Angas Zinc Mine — Long section Filled and unfilled voids Un-filled Voids Filled Voids i || Stopes gems | Drives (tunnels)

  5. Slide 5: The Future - Potential Bird-in-Hand

    The Future - Potential Bird-in-Hand  Terramin has acquired 100% of the Bird-in-Hand gold project and exploration tenements  Gold resource hosted in carbonate bedrock  Extensive studies, modeling and risk assessments are required for regulatory approvals for both Angas Zinc Mine and Bird-in-Hand p

  6. Slide 6: Mining and Processing (Quarter 3, 2013)

    Mining and Processing (Quarter 3, 2013)  Completed all development to the 380 metre level  A total 98,110 tonnes of ore was processed  10,933 tonnes of zinc concentrate  6,148 tonnes of lead copper concentrate Total ore mined to date (EOM Sept 2013): 1,989,251 tonnes TERRAMIN AUSTRALIA LIMITED

  7. Slide 7: AZM fast facts

    AZM fast facts  Commenced mining in March 2007  119 full time employees  120,000 tonnes of Zinc, 46,500 tonnes of Lead and 1,584,461 ounces of Silver produced  Remained operating despite the GFC induced zinc price fluctuations, from $5000/tonne to a low of $1500/tonne  Water management was a ch

  8. Slide 8: Quarterly Environment Report

    Angas Zinc Mine Quarterly Environment Report Quarter 3: July - Sept 2013 M. Daniel TERRAMIN AUSTRALIA LIMITED

  9. Slide 9: Environmental Activities

    Environmental Activities  Updated closure plan submitted  Fencing works to exclude hares from SEB areas  Weed control and fire management works  Native seed collection  Heritage tree photo monitoring TSF ET cap pseudo trial established and seeded (October) Waste Management in preparation for

  10. Slide 10: Community Activities

    Community Activities  Student placements for environmental work experience  UrrbraeTafe  University of Adelaide TERRAMIN AUSTRALIA LIMITED

  11. Slide 11: Community feedback & environmental incidents

    Community feedback & environmental incidents  No environmental incidents were recorded during quarter 3  9 registered community complaints:  Nine noise complaints from three local residents regarding noise at night – Three possibly from the paste plant, appeared to originate from the vibrator fit

  12. Slide 12: Noise September Monitoring - West results (Boxcut side)

    Noise September Monitoring - West results (Boxcut side) TERRAMIN AUSTRALIA LIMITED

  13. Slide 13: Noise September Monitoring - East results (Mill side)

    Noise September Monitoring -East results (Mill side) TERRAMIN AUSTRALIA LIMITED

  14. Slide 14: Acid Mine Drainage - TSF Decant Pond Surface Area

    Acid Mine Drainage - TSF Decant Pond Surface Area  The TSF Decant pond remains in compliance (<15,000m2)  Current surface area <4,000m2 at RL 66.89 on the 19th of November TERRAMIN AUSTRALIA LIMITED 7th March 2013 TSF Western Wall 19th November 2013 TSF Western Wall

  15. Slide 15: Acid Mine Drainage - TSF Decant Pond RL

    Acid Mine Drainage - TSF Decant Pond RL RL – 66.89m on 19th November 2010 2011 2012 2013 TERRAMIN AUSTRALIA LIMITED

  16. Slide 16: Upcoming Activities for Q3 2013

    Upcoming Activities for Q3 2013  Fencing out of hares from the SEB paddocks  Closure Plan Updating  Recycling of scrap steel and plastic  TSF monitoring, water management, & injecting bore water into the mine void  Grouting of exploration drill holes that are no longer required  Further weed a

  17. Slide 17: Mine Closure Plan

    Mine Closure Plan  The first stage plan is with the SCCC for comment, have incorporated FMEA risk assessment workshop identified risks and mitigation strategies  The ML is split into four discrete domains, each with its own final land use plan Some general comments on each domain is below North Do

  18. Slide 18: Mine Closure plan

    Mine Closure plan Central Domain  Land use will be industrial and Extractive Mineral Lease  Underground mining voids currently 93% filled (91% required), inject water into mine void for AMD management  Fill decline and vent raise, remove mill & water dams, undertake soil contamination assessment,

  19. Slide 19: Mine closure plan

    Mine closure plan Southern Domain  Landuse is to be open grassland/shrub-land with biodiversity value  Evaporate all remaining TSF water, when enough moisture removed, place fill onto tails and contour to design, re-vegetate Grazing excluded for 3 reasons;  Ecosystem Function Analysis required by