  1. Slide 1: Booming deal activity headlines terrific Q3 for Houston industrial

    FIGURES | HOUSTON INDUSTRIAL | Q3 2026 FIGURES | HOUSTON INDUSTRIAL | Q3 2026 Booming deal activity headlines terrific Q3 for Houston industrial 8.2% 6.3% 7.2M 4.9M 18.4M Availability Rate Vacancy Rate SF Net Absorption SF Construction Delivered SF Under Construction Note: Arrows indicate change fro

  2. Slide 2: Vacancy & Net Absorption

    FIGURES | HOUSTON INDUSTRIAL | Q3 2026 FIGURE 2: Quarterly Net Absorption by Building Size Vacancy & Net Absorption 3 After 7 million sq. ft. of absorption in Q2, Q3 continued the trend with 7.2 million sq. ft. of SF Millions 2 occupancy. The combined 14.2 million sq. ft. of absorption between Q2 an

  3. Slide 3: Construction & Deliveries

    FIGURES | HOUSTON INDUSTRIAL | Q3 2026 Construction & Deliveries With year-end around the corner, the Houston industrial pipeline consists of 90 projects totaling FIGURE 6: Deliveries by Year about 18.4 million sq. ft. – a slight increase from Q2. Q3’s pipeline pre-lease rate was 31%, which is also

  4. Slide 4: Leasing Activity and Economic Outlook

    FIGURES | HOUSTON INDUSTRIAL | Q3 2026 Leasing Activity FIGURE 8: Leasing Activity Trend – Leases 50,000 sq. ft. and up After two straight quarters of at least 8 million sq. ft. in leasing activity, Q3’s deal volume skyrocketed Sq. Ft. millions to 14.7 million sq. ft. in leases over 50,000 sq. ft. Q

  5. Slide 5: Market Statistics by Snapshot and Size

    FIGURES | HOUSTON INDUSTRIAL | Q3 2026 FIGURE 10: Market Statistics by Snapshot Total Total Direct Sublease Current Quarter Net YTD Net Submarket Net Rentable Area Deliveries Under Construction Vacancy % Availability % Availability % Availability % Absorption Absorption CBD 41.23M 7.0 9.4 8.0 1.4 (1

  6. Slide 6: Market Area Overview, Definitions, Contacts

    FIGURES | HOUSTON INDUSTRIAL | Q3 2026 Market Area Overview Definitions Available Sq. Ft.: Space in a building, ready for occupancy within six months; can be occupied or vacant. Availability Rate: Total Available Sq. Ft. divided by the total building Area. Building Area: The total floor area sq. ft.