Brixton Metals Corporation · TSXV:BBB

Brixton Metals — Investor Presentation (September 2021)

22 slides from Brixton Metals's investor presentation, Sep 7, 2021

  1. Slide 1: Hog Heaven Silver-Gold-Copper Project

    HOG HEAVEN SILVER-GOLD-COPPER PROJECT SEPTEMBER 2021 BBBXF. OTCQB BBB. TSX-V 8BX1. GR 1

  2. Slide 2: Safe Harbour Statement

    SAFE HARBOUR STATEMENT Information set forth in this presentation involves forward-looking statements, including but not limited to comments regarding planned drilling and other exploration, identification of new targets, funding by HPX of exploration on the Hog Heaven project, and timelines, predic

  3. Slide 3: Hog Heaven Location & Nearby Mines

    HOG HEAVEN LOCATION & NEARBY MINES Historic Production of 6.7Moz Ag from 0.23Mt Good road access & private lands 3

  4. Slide 4: Project History

    PROJECT HISTORY 1913 Anaconda sunk an exploration shaft 1913 – 1975 Anaconda Copper Mining and lessees produced 6.7 Moz Ag, 3,000 oz Au, 23M lbs Pb, and 0.6M lbs Cu from 0.23Mt of Direct Ship Ore grading 29 opt Ag. An additional 49,700 tons grading 9.35 opt silver was also produced. 1994 – 2017 Pan

  5. Slide 5: Hog Heaven - Ivanhoe Electric Earn-In

    HOG HEAVEN - IVANHOE ELECTRIC EARN-IN Stage 1 Brixton Metals Signs USD$44.5M Definitive Agreement for an Earn-in Pay Brixton USD$4.5M over 6 years Agreement with High Power Exploration (Ivanhoe Electric Inc) to HPX to fund expenditures up to USD$15M to earn 51% explore and develop the Hog Heaven Pro

  6. Slide 6: Hog Heaven Status

    HOG HEAVEN STATUS 724 line-km of helicopter-borne VTEM and horizontal magnetic gradiometer geophysical surveying completed 60 km2 LiDAR data and orthophoto acquisition completed Brixton-funded Montana Tech Research: geology, ore mineralogy, alteration, fluid inclusions, mineral paragenesis and isoto

  7. Slide 7: 2020 Maiden Drilling

    2020 MAIDEN DRILLING .f * = . ty - ete (50 100150 “200” teed : ty Leaend @ Maiden Drill Collars 2020 Drillhole trace © Historic Holes — Roads Hog Heaven Project Main Mine Area Project Location

  8. Slide 8: 2020 Maiden Drilling HH20-02 Cross-Section

    2020 MAIDEN DRILLING HH20-02 Cross-Section 8

  9. Slide 9: HH20-02 Results

    HH20-02 RESULTS From Total Hole ID Remarks (m) To (m) (m) Ag g/t Au g/t Cu % HH20-02 All Mineralization 75.07 299.92 224.85 78.16 0.66 0.24 HH20-02 Upper Zone 75.07 111.25 36.18 119.72 0.25 0.26 Porphyry Dyke including w/margin 105.77 111.25 5.48 445.79 1.41 1.50 containing Porphyry Dyke 105.77 107.

  10. Slide 10: Hog Heaven Volcanic Field

    HOG HEAVEN VOLCANIC FIELD Host rocks to the Montenore, Black Butte, and Rock Creek stratiform deposits 10 10

  11. Slide 11: Hog Heaven Geology

    HOG HEAVEN GEOLOGY Young Eocene Rifting opened-up the Belt Supergroup rocks driving new mineralization Main Mine Ole Hill Drill holes 11

  12. Slide 12: Hog Heaven Conceptual Deposits

    HOG HEAVEN CONCEPTUAL DEPOSITS Replacement mineralization Mineralization in zones of acid leaching and silicification diatreme breccia Volcaniclastics latite porphyry Under-explored targets at Belt unconformity Belt Supergroup/Precambrian Basement Belt Supergroup/Precambrian Basement 12

  13. Slide 13: Diatreme Breccia

    DIATREME BRECCIA HHC96-02 BOX #34 337-346’ 13

  14. Slide 14: Exploration Upside

    EXPLORATION UPSIDE Significant upside exists by expanding extents of known mineralization and discovering new zones Ole Hill Birdseye Mine WF Mine Mary Ann Bergman Mine Drill holes Martin Lease Donald Francis Mine Margarite Mine Martin Mine 0 1km 14

  15. Slide 15: WF Mine Area Target

    WF MINE AREA TARGET Production: Year Tons Au Ag Cu Source (dry) (oz/t) (oz/t) (%) 1938 143 0.035 43.3 No assays Anaconda 1939 225 0.013 44.2 No assays 1942 448 0.018 141.6 0.83 WF Mine 1943 250 0.025 50.9 1.0 1944 260 0.026 51.4 0.83 X 1959-1969 1884 0.045 112.3 No assays Lindbom Total 3210 0.029 98

  16. Slide 16: WF Mine Area Target

    WF MINE AREA TARGET Extreme high-grade silver 300 – 3,000 opt Ag 16

  17. Slide 17: Martin Mine Target

    MARTIN MINE TARGET Year Au Ag Cu Remarks (oz/t) (oz/t) (%) 1939 0.05 145.4 Truckload shipped to smelter 1939 0.12 414.8 Anaconda sample 1940 0.02 15.6 Face of adit near the shaft; highest of several samples 1940 40 to 1250 5 tons hand-sorted ore 1941 0.06 48.8 24.3 Sulfide ore with enargite; vein 18

  18. Slide 18: Total Magnetic Intensity 2018

    TOTAL MAGNETIC INTENSITY 2018 Coincidence of mapped argillic alteration with mag lows Additional mag lows along NW- Main Mine trending graben could indicate new targets WF Ole Hill x Historic mine workings Martin Mine 18 18

  19. Slide 19: Main Mine Metal Zonation

    MAIN MINE METAL ZONATION N-S long section > 70 g/t Ag >0.5% Pb >0.5% Zn Zn Pb Ag Au Note: zones are gradational outwards With overlapping boundaries Au+Ag, Ag, Ag+Pb, Pb+Zn, Zn (idealized vertical section – no scale) feeder zone 19 19

  20. Slide 20: Hog Heaven Main Mine Long Section - Silver

    HOG HEAVEN MAIN MINE LONG SECTION - SILVER 23.01m of 599 g/t Ag 18.29m of 633 g/t Ag 24.38 m of 438 g/t Ag Incl. 3.05m of 3075 g/t Ag Incl. 3.05m of 2571 g/t Ag A’ 7029 Incl. 3.05m of 987 g/t Ag 42.67m of 356 g/t Ag A Incl. 7.62m of 928 g/t Ag 12.19m of 1089 g/t Ag 15.24m of 230 g/t Ag Incl. 3.05m o

  21. Slide 21: Moving Hog Heaven Forward

    MOVING HOG HEAVEN FORWARD Ivanhoe Electric Operator Plans Typhoon™ Geophysics summer 2021, followed by drilling Targeting large-scale copper-gold-silver porphyry mineralization Systematic Exploration Relogging /resampling campaign of the historical drilling in support of a geological model Geologica

  22. Slide 22: Contact

    BBBXF. OTCQB BBB. TSX-V 8BX1. GR 1-604-630-9707 Email: info@brixtonmetals.com brixtonmetals.com Suite 551 – 409 Granville Street, Vancouver, BC, V6C 1T2 Canada 22

Brixton Metals — Investor Presentation (September 2021) on 6ix