New Dawn Mining — Investor Presentation (February 2011)
29 slides from New Dawn Mining's investor presentation, February 2011
Slide 1: New Dawn Mining Corp. – It's a New Day
New Dawn Mining Corp. i IT’S A NEW DAY
Slide 2: Cautionary Statement
CAUTIONARY STATEMENT THIS PRESENTATION CONTAINS ‚FORWARD-LOOKING INFORMATION‛ WHICH MAY INCLUDE, BUT IS NOT LIMITED TO, STATEMENTS WITH RESPECT TO THE FUTURE FINANCIAL OR OPERATING PERFORMANCES OF NEW DAWN, THE MATERIAL MINERAL PROPERTIES, THE FUTURE SUPPLY, DEMAND, INVENTORY, PRODUCTION AND PRICE O
Slide 3: Focused, Driven and Determined to Become a Major Gold Producer in Zimbabwe
FOCUSED, DRIVEN AND DETERMINED TO BECOME A MAJOR GOLD PRODUCER IN ZIMBABWE February 2011 3
Slide 4: Zimbabwe – A Compelling Opportunity
ZIMBABWE – A COMPELLING OPPORTUNITY Exceptional opportunity present Wide-ranging fiscal and monetary changes since 2009 Zimbabwe, economically is off a very low base and developing economies are growing much faster than first world economies Excellent risk/reward compared to recent first world
Slide 5: Key Investment Highlights
KEY INVESTMENT HIGHLIGHTS Zimbabwe focused gold producer with three significant gold camps Expanding substantial ‘in country’ existing gold assets and operations Targeted objective is to reach consolidated annualized gold production of: 38,000 to 40,000 annualized ounces of gold by late 2011 5
Slide 6: Corporate Structure
CORPORATE STRUCTURE 89% CONTROLLING 100% INTEREST OWNERSHIP TURK AND ANGELUS MINES 100% 85% OWNERSHIP OWNERSHIP OLYMPUS GOLD MINES LTD. FALCON GOLD ZIMBABWE LTD. • Old Nic • Dalny • Cam perdown • Golden Quarry (current processing plant for Camperdown) • Venice (dump) New Dawn, through a subsidiary,
Slide 7: Location Map
LOCATION MAP THREE SIGNIFICANT GOLD CAMPS WITHIN A 300KM RADIUS KARIBA HARARE Dalny Mine HWANGE Venice Mine MUTARE GWERU Golden Quarry Mine Turk and Angelus Mine Camperdown Mine BULAWAYO Old Nic Mine LEGEND MAJOR TOWNS BULAWAYO GOLD CAMP MAJOR GOLD MINES GWERU GOLD CAMP (>10000KG AU PRODUCED) KADOMA
Slide 8: Three Phase Growth Strategy
THREE PHASE GROWTH STRATEGY PRODUCTION EXPANSION • Profitable Turk Mine, - currently 15,000 ozs with 35,000 to 50,000 oz potential • Next growth phase near complete • CAG Assets – 2 mines now operational • 18 months to 25K to 30K Au oz of production • Cash costs decrease as production rises • Growth
Slide 9: Gold Mining Operations in Zimbabwe
GOLD MINING OPERATIONS IN ZIMBABWE A PORTFOLIO OF MINES IN THREE SIGNIFICANT GOLD CAMPS BULAWAYO GOLD CAMP GWERU GOLD CAMP KADOMA GOLD CAMP TURK AND ANGELUS CAMPERDOWN DALNY OLD NIC GOLDEN QUARRY VENICE 9
Slide 10: Substantial Increase to Gold Resource
SUBSTANTIAL INCREASE TO GOLD RESOURCE HIGHLIGHTS OF NEW DAWN’S TOTAL ATTRIBUTABLE GOLD RESERVES & RESOURCES: 32% increase to New Dawn’s total attributable gold reserves 220,000 ounces grading 3.81 g/t from 1,785,000 tonnes of mineralized material 92% increase to New Dawn’s total attributable m
Slide 11: Targeted Growth of Annualized Gold Production & Sales
TARGETED GROWTH OF ANNUALIZED GOLD PRODUCTION & SALES +$135M $68M to 100,000 $81M $51M to $54M 50,000 – $30M to 38,000 – 60,000 $31M 40,000 22,000 – 23,000 Early 2011 By late 2011 By mid to late 2012 Within 4 yrs or less * Revenue based on $1,350 per gold ounce * Estimated cash costs < US$550 per go
Slide 12: Experienced Management
EXPERIENCED MANAGEMENT Ian R. Saunders, BSc – President and CEO Resident of Zimbabwe 19 years mining experience with over 14 years at the Turk and Angelus Mines Originally Chief Metallurgist at Turk Mine - promotion to GM in 1997 2006 appointed President and COO of the Corporation 2008 app
Slide 13: International Board of Directors
INTERNATIONAL BOARD OF DIRECTORS Robert N. Weingarten, BA, MBA – Chairman CFO of New Dawn from July 2000 to August 2005 President from October 2002 to August 2005 Chairman since August 2006 Maintains various business interests internationally Philip G. MacDonnell, BA (Hons), CA 25 years of
Slide 14: International Board of Directors
INTERNATIONAL BOARD OF DIRECTORS Dr. Jon North, BSc, MSc, PhD International exploration geologist over 20 years of experience President and CEO of Northquest Ltd. TSX.V - NQ Chairman of Continental Nickel Limited, exploration company listed on the TSX.V - CNI Director of Bridgeport Ventures
Slide 15: Financial Highlights
FINANCIAL HIGHLIGHTS As at December 31, 2010 Working Capital US$8.2M Cash and Equivalents US$6.5M Management & Director Ownershi p 5.5%+ Institutional Ownershi p 80%+ Closed in Nov 2010 a C$7.6M financing @ C$1.80 – no warrants, no fees 15
Slide 16: Capital Structure
CAPITAL STRUCTURE Symbols TSX: ND Frankfurt 3DM Current Share Price (Feb 15, 2011) CDN $1.60 per share Euro €1.10 per share Shares Issued 42,204,843 Market Capitalization (Feb 15, 2011) CDN $67.5 Million Euro €46.4 Million Options and Warrants 2,297,033 @ US $0.59 – Sept 2011 75,000 @ CDN $1.80 – Se
Slide 17: Main Perceived Risk - Indigenization
MAIN PERCEIVED RISK - INDIGENIZATION Indigenization Economic Empowerment ‘IEE’ law requires ALL firms to have at least 51% shareholding by local Zimbabweans The Regulations allow for a Sector (Mining) or Sub Sector (Gold Mining) to have < 51% for ‚economically or socially beneficial reasons‛ To be
Slide 18: Conclusions
CONCLUSIONS Advancing production at 3 significant gold camps Gold production targets on an annualized basis 38,000 to 40,000 gold ozs in 12 months 50,000 to 60,000 gold ozs in 18 to 24 months 100,000 gold ozs in 4 years or less Normalized cash costs estimated at under US$550 per gold oz
Slide 19: Exploration at Turk and Angelus Mines
EXPLORATION AT TURK AND ANGELUS MINES Batyali Section Exploration Zone ~ 240 meters in down dip depth 100 meters of strike having average reef width of ~ 2.5 to 3.5 meters To contain ~ 650,000 to 900,000 tonnes of mineralized material MVS – Armenian Section Exploration Zone ~ 100 meters in d
Slide 20: Other Current Exploration Sites
OTHER CURRENT EXPLORATION SITES Ultimus Project Located in Shurugwi Mining District Broad geo chemical anomaly Anomaly measuring 26.74 hectares Excellent open pit potential ULTIMUS PROJECT RKB Property Located in Shurugwi Mining District Excellent geo chemical samples Open pit potentia
Slide 21: CAG Exploration – Falgold and Olympus
CAG EXPLORATION – FALGOLD AND OLYMPUS Camperdown Mine Large geological system Mainly open pit Excellent potential for further resources CAMPERDOWN Golden Quarry Mine Opportunity to expand open pit Potential at depth also present Under-explored GOLDEN QUARRY 21
Slide 22: CAG Exploration – Falgold and Olympus
CAG EXPLORATION – FALGOLD AND OLYMPUS Dalny Mine 15 km shear zone Numerous gold deposits Under-explored Presence of artisanal miners DALNY Venice Mine Large claim area Multiple exploration targets Currently under-explored VENICE 22
Slide 23: Appendix A - Turk and Angelus Mine
APPENDIX A - TURK AND ANGELUS MINE Location: 56 km northwest of Bulawayo ZIMBABWE Expanding to 22k to 23k oz of annualized production Turk and Angelus Mine New 3MVA power generators have been installed BULAWAYO Maximum output capacity estimated at 35k to 50k oz of annualized gold production
Slide 24: Appendix A - The Old Nic Mine
APPENDIX A - THE OLD NIC MINE Location: the eastern part of Bulawayo (one of ZIMBABWE the oldest gold mines in Matabeleland) Consists of 17 claims BULAWAYO The claims are 100% attributable to Olympus Old Nic Mine Historical production (to 2006) was 0.290M oz of gold from 0.98M tonnes of ore
Slide 25: Appendix A - The Camperdown Mine
APPENDIX A - THE CAMPERDOWN MINE Location: northeast of Shurugwi, approximately ZIMBABWE 30km southeast of Gweru Consists of 9 claims GWERU The claims are 100% attributable to Olympus Camperdown Mine The Camperdown Mine previously produced ore material from both a dual open pit and an underg
Slide 26: Appendix A - The Golden Quarry Mine
APPENDIX A - THE GOLDEN QUARRY MINE Location: approximately 180km northeast ZIMBABWE of Bulawayo Golden Quarry Mine Consists of over 1,250 claims GWERU The claims are 100% attributable to Falgold Production was sourced from a dual open pit (low grade to heap leach) and underground (milling –
Slide 27: Appendix A - The Dalny Mine
APPENDIX A - THE DALNY MINE Location: approximately 175km southwest of ZIMBABWE the capital, Harare Dalny Mine Consists of greater than 3,500 claims Strike length of approximately 15 kilometers The claims are 100% attributable to Falgold Underground operation with an associated ore treatme
Slide 28: Appendix A - The Venice Mine
APPENDIX A - THE VENICE MINE Location: approximately 28km south of Kadoma ZIMBABWE Consists of over 2,500 claims and numerous exploration targets Venice Mine 100% attributable to Falgold Currently on care and maintenance Historical production (to 2002) was 0.318M oz of gold from 2.5M tonne
Slide 29: Richard Buzbuzian, Investor Relations
Richard Buzbuzian Investor Relations New Dawn Mining Corp. rbuzbuzian@newdawnmining.com 29