Yancoal Australia Ltd. · ASX:YAL
Yancoal Australia — Corporate Update (March 2016)
35 slides from Yancoal Australia's corporate update, Mar 15, 2016
Slide 1: Ashton Coal Operations Community Consultative Committee Presentation
Ashton Coal Operations Pty Ltd Community Consultative Committee Presentation – 15 March 2016
Slide 2: Action List
Action List ITEM RESPONSIBILITY PROGRESS UPDATE Tree Screen at New England Hwy – Optic fibre has been DS Complete located and the area needs to be archeologically cleared to allow for the tree screens to commence. Poor housekeeping at a privately tenanted, Ashton owned DS Complete residence, in Camb
Slide 3: Ashton Statistics
Ashton Statistics Ashton Coal Statistics 2016 Budget (YTD) 2016 Actual ROM (t) 371,669 381,381 Product Coal (t) 161,448 183,517 Total Coal Sales (t) 163,750 265,795 Lost Time Injury (LTIFR) 9.5 14.74 Total Recordable Injuries (TRIFR) 25.53 29.48 Total Employees (FTE) 201 198 3 20 December 2024 3
Slide 4: Current Operations
Current Operations • ACOL is approximately 75% of the way through LW104 in the Upper Liddell Seam. • South East Open Cut – no further movement. • Development is continuing in the Upper Lower Liddell seam forming longwall blocks and main headings. 4 20 December 2024 4
Slide 5: Exploration Activities
Exploration Activities No exploration was conducted in EL5860 or EL4918. 5 20 December 2024 5
Slide 6: Approvals Update
Approvals Update As mining at ACOL progresses additional approvals are required to continue operations. Recent Approval determinations include: • Extraction Plan (EP) for LW 105-107 in the Upper Liddell Seam. • Bore licence for the South East Open Cut Ashton DA Mod 5 – Integration with SEOC currentl
Slide 7: Modification 5 – PAC review
Modification 5 – PAC review 7 20 December 2024 7
Slide 8: Environment Monitoring Data
Environment Monitoring Data ▪ The following slides present environmental monitoring data for the reporting period ▪ Meteorological • Rainfall ▪ Air Quality • Depositional Dust Gauges – Total suspended dust • PM10 – Tapered Element Oscillating Microbalance (TEOM) ▪ Surface Water – Glennies Ck, Bowman
Slide 9: Rainfall
Rainfall YTD Rainfall: 228mm 9 20 December 2024 9
Slide 10: Air Quality & Noise Monitoring Locations
Air Quality & Noise Monitoring Locations 10 20 December 2024 10
Slide 11: Depositional Dust
Depositional Dust On-site Dust Gauges 11 20 December 2024 11
Slide 12: Total Suspended Dust
Total Suspended Dust 12 20 December 2024 12
Slide 13: Total Suspended Dust
Total Suspended Dust 13 20 December 2024 13
Slide 14: PM10 Dust – Site 1
PM10 Dust – Site 1 14 20 December 2024 14
Slide 15: PM10 Dust – Site 2
PM10 Dust – Site 2 15 20 December 2024 15
Slide 16: PM10 Dust – Site 3
PM10 Dust – Site 3 16 20 December 2024 16
Slide 17: PM10 Dust – Site 8
PM10 Dust – Site 8 17 20 December 2024 17
Slide 18: Surface Water Sampling Locations
Surface Water Sampling Locations 18 20 December 2024 18
Slide 19: Surface Water Quality – pH
Surface Water Quality – pH 19 20 December 2024 19
Slide 20: Surface Water Quality – EC
Surface Water Quality – EC 20 20 December 2024 20
Slide 21: Surface Water Quality – pH
Surface Water Quality – pH 21 20 December 2024 21
Slide 22: Surface Water Quality – EC
Surface Water Quality – EC 22 20 December 2024 22
Slide 23: Surface Water Quality – pH
Surface Water Quality – pH 23 20 December 2024 23
Slide 24: Surface Water Quality – EC
Surface Water Quality – EC 24 20 December 2024 24
Slide 25: Groundwater Sampling Locations
Groundwater Sampling Locations 25 20 December 2024 25
Slide 26: Groundwater – Standing Depth
Groundwater – Standing Depth 26 20 December 2024 26
Slide 27: Groundwater – EC
Groundwater – EC 27 20 December 2024 27
Slide 28: Noise Monitoring
Noise Monitoring Attended noise monitoring is conducted Monthly. There were no exceedances during the reporting period 28 20 December 2024 28
Slide 29: What else is going on?
What else is going on? ▪ Groundwater Bore Installation ▪ Weed Spraying ▪ Gas Well Drilling ▪ Archaeological salvaging works ▪ Clean water diversion from the NEOC 29 20 December 2024 29
Slide 30: Clean water diversion from the NEOC
Clean water diversion from the NEOC 30 20 December 2024 30
Slide 31: Community Support Program
Community Support Program ▪ Application forms available on Ashton website – next round 31 March 2016 ▪ Community projects supported by Ashton Coal in the Upper Hunter are during Q4 2015 include: Equipment for gardening services Whitmore Enterprises Inc. business Singleton Strikers Football Club Shad
Slide 32: New debt financing arrangement
New debt financing arrangement 32 20 December 2024 32
Slide 33: Donaldson into care and maintenance
Donaldson into care and maintenance 33 20 December 2024 33
Slide 34: Other matters
Other matters ▪ 32 Lethbridge St, Camberwell ▪ 2016 Annual Environmental Management Report 34 20 December 2024 34
Slide 35: Any Questions?
Any Questions? 35 20 December 2024 35