  1. Slide 1: Silica Sand: Essential to World Growth – AGM November 2024

    VRX SILICA For personal use only Silica Sand Essential to World Growth AGM November 2024

  2. Slide 2: Important Information – Disclaimer

    Important Information Disclaimer This document has been prepared by VRX Silica Limited. The information contained in this document is for information purposes only and has been prepared for use in conjunction with a verbal For personal use only presentation and should be read in that context. The in

  3. Slide 3: Silica Sand: The Second-most Consumed Material on Earth

    Silica Sand: The Second-most Consumed Material on Earth For personal use only 3

  4. Slide 4: The world is facing a global sand supply crisis

    For personal use only The world is facing a global sand supply crisis 4

  5. Slide 5: World Class Silica Sand Projects

    World Class Silica Sand Projects Project development pipeline to ensure disciplined, staged development of world- For personal use only class assets ❑ Five very large scale, high grade and low impurity silica sand projects each project capable of independent operation to supply processed material to

  6. Slide 6: Market Outlook

    Market Outlook Asian glass making production increasing 5-6% per year (~8 - 10Mtpa Growth) VRX Target Market - Float, Container, Solar Panel, and; For personal use only Metal Casting/Foundry for Automobile Parts Glassmaking silica sand demand by region* Market in Growth in Use Spec 4% Asia Asia 5% F

  7. Slide 7: WA Leading Silica Sand Projects

    WA Leading Silica Sand Projects Arrowsmith North (100%) • High-grade with exceptional financial metrics For personal use only • Close proximity to port and rail infrastructure • Glass making and foundry products • Potential +100 year mine life: - JORC Proved and Probable Reserve of - 221Mt @ 99.5% S

  8. Slide 8: Exploration: Arrowsmith North Silica Sand Project

    Exploration Arrowsmith North Silica Sand Project For personal use only Project Site Vegetation Kwongan Heath Loose sand/shallow root systems suitable for VDT 8

  9. Slide 9: Arrowsmith North

    Arrowsmith North Near-term development opportunity for a world-class silica sand project ❑ Production expected to commence 8-12 months following final environmental approvals For personal use only ❑ 221Mt Ore Reserve @99.5% SiO2 (100-year production) (See Reserve Table) ❑ Grade controlled Proved Ore

  10. Slide 10: Updated BFS (March 2024)

    Updated BFS (March 2024) Arrowsmith North Updated BFS Results For personal use only ❑ Demonstrates robust financial metrics for a World-class silica sand project ❑ 221Mt Ore Reserve @99.5% SiO2 (100-year production) ❑ Ungeared NPV10 of $167m based on 25 years mining of a +100 year Resource ❑ Proved

  11. Slide 11: Environmental and Mining Approvals

    Environmental and Mining Approvals ❑ Confirmation by Commonwealth Department of Agriculture, Water and the Environment of For personal use only accredited State assessment under the EPBC Act ❑ State Department of Water and Environmental Regulation and Environmental Protection Authority (EPA) require

  12. Slide 12: Responsible Mining – the VRX Way

    Responsible Mining – the VRX Way A made-for-purpose mining method designed around continuous rehabilitation For personal use only ❑ VRX has developed a unique and progressive mining method for its silica sand projects ❑ The Vegetation Direct Transfer (VDT) method provides a rapid and comprehensive r

  13. Slide 13: Environmental Approvals: Changes to Proposal

    Environmental Approvals: Changes to Proposal Original Revised ❑ Approved amendments since For personal use only referral ❑ Mine development envelopes reduced from >1,000ha to 353ha ❑ Clearing reduced from 412.2ha to 299.1ha ❑ Relocation of infrastructure to within the mine area ❑ Redesign of access

  14. Slide 14: Environmental Approvals: Terrestrial Fauna

    Environmental Approvals: Terrestrial Fauna Carnaby’s Cockatoo (Endangered) For personal use only ❑ Clearing 299.1 ha of foraging habitat. Avoided roosts or breeding sites ❑ Extent of clearing reduced significantly from original Proposal ❑ Impact is 0.5% of foraging habitat within 12 km, Cumulative <

  15. Slide 15: Environmental Approvals: Social Surroundings

    Environmental Approvals: Social Surroundings ❑ Entire site has been surveyed for Aboriginal Heritage – no sites found within For personal use only current Development Envelope ❑ One registered Aboriginal Heritage site near the Proposal – Development Envelope amended to avoid boundary ❑ Arrowsmith La

  16. Slide 16: Environmental Approvals: Offset Sites

    Environmental Approvals: Offset Sites ❑ Offsets proposed to counterbalance the For personal use only medium-term loss of 299.1 ha of Carnaby’s Cockatoo (CC) foraging habitat ❑ Two vegetated lots proposed ❑ Contain 958.2 ha of Excellent quality CC foraging habitat ❑ Area to be revegetated within prev

  17. Slide 17: Environmental Approvals: Avoidance and Minimisation of Impacts

    Environmental Approvals: Avoidance and Minimisation of Impacts ❑ Reduce Development Envelopes from to avoid Priority Flora and Aboriginal Heritage site For personal use only ❑ Reduced impact to Carnaby’s Cockatoo foraging habitat ❑ “Gold Standard” VDT rehabilitation method proposed – slow, progressi

  18. Slide 18: Environmental Approvals: Priority Flora

    Environmental Approvals: Priority Flora ❑ 7 species recorded within Development Envelope, of For personal use only which 5 will have >5% local records disturbed ❑ Development Envelope revised to keep impacts to local records <21% ❑ Proposal impacts to regional records all <6.1% ❑ Cumulative losses o

  19. Slide 19: Muchea Silica Sand Project Site

    Muchea Silica Sand Project Site For personal use only Vegetation: Banksia Woodland Low grasses and sedges suitable for VDT VRX Silica 19

  20. Slide 20: Muchea

    Muchea Large scale, world class high-grade and low impurity silica sand project For personal use only ❑Production to follow Arrowsmith North subject to EPA approval ❑Utilise VDT and duplicate plant ❑Access to established infrastructure ❑Underutilised railway connects to Kwinana (100km) ❑Grid power ❑

  21. Slide 21: Muchea: Downstream processing capabilities

    Muchea Downstream processing capabilities For personal use only ❑Critical Minerals Prospectus – VRX Muchea project is included in the 2024 Critical Minerals Prospectus published by Austrade (now online) ❑Raw material for premium ultra-clear cover glass production for solar panels ❑Potential for prod

  22. Slide 22: Processing Flowsheet

    Processing Flowsheet Simplified wet processing, multiple products, no dust, 2mtpa processing plant at each site For personal use only Processing Plant Design ▪ Arrowsmith North, Arrowsmith Central and Muchea to each have 2 Mtpa processing capacity ▪ No toxic reagents required 22

  23. Slide 23: Processing Plant Design

    For personal use only Processing Plant Design No dust No toxic chemicals

  24. Slide 24: Sustainability, Environment, Social and Governance (ESG)

    Sustainability, Environment, Social and Governance (ESG) For personal use only VRX is delivering on its ESG responsibilities aligned to the UN’s Sustainable Development Goals CLEAN ENERGY ECONOMIC INDUSTRY SUSTAINABLE RESPONSIBLE CLIMATE REHABILITATION GROWTH INNOVATION COMMUNITIES PRODUCTION ACTION

  25. Slide 25: Corporate Summary

    Corporate Summary Capital Structure For personal use only Share Price A$0.054* Ordinary Shares on Issue 628 million Options on Issue 92 million Market Capitalisation A$34 million* Cash A$1.8 million** Debt Nil Enterprise Value A$32.2 million Shareholders Board and Management 12% Top 20 Total 33% * C

  26. Slide 26: Our Team

    Our Team Board Executive For personal use only Person Role Experience Person Role Experience Governance: over 30 years’ Production: 15 years’ experience Paul experience in investment, equity General Chairman markets and managing public Ryan Baxter in mining and construction with Boyatzis Manager 10

  27. Slide 27: Right Time, Right Place

    Right Time, Right Place Opportunity for WA to capture its economic advantages of abundant silica sand and domestic gas reserves to build world-class glass manufacturing and For personal use only downstream processing industries ❑ Very long life, high-grade silica sand supply with combined 1.4 billio

  28. Slide 28: Thank you

    For personal use only Thank you Bruce Maluish Managing Director Ground Floor, 52 Kings Park Road West Perth WA 6005 Phone: 08 9226 3780 Email: info@vrxsilica.com.au

  29. Slide 29: Silica Sand Resources and Reserves

    Silica Sand Resources and Reserves Mineral Resources - as at 30/06/2024 Ore Reserves - as at 30/06/2024 For personal use only SiO₂ Al₂O₃ TiO₂ LOI SiO2 Al2O3 Fe2O3 TiO2 LOI Project Classification Mt Fe₂O₃ % Project Classification Product Mt % % % % % % % % % Indicated 29 99.6 0.1 0.03 0.1 0.2 F80 10.