Patagonia Gold Corp · TSXV:PGDC

Patagonia Gold — Investor Presentation (June 2014)

21 slides from Patagonia Gold's investor presentation, June 2014

  1. Slide 1: Investor Presentation June 2014

    INVESTOR PRESENTATION June 2014 AIM:PGD

  2. Slide 2: Patagonia Gold Plc

    Patagonia Gold Plc Patagonia Gold Plc is a Producing Mining and Exploration company with its primary objective to increase shareholder value through the acquisition, exploration and development of gold and silver projects in the Deseado Massif region of Argentina 2

  3. Slide 3: Footprint in the Deseado Massif

    Footprint in the Deseado Massif 3

  4. Slide 4: Resources

    Resources NI 43-101 Compliant (oz) – 4 Projects INDICATED GRADE (g/t) METAL (Oz) PROJECT Tonnes Au Ag AuEq Au Ag AuEq Cap-Oeste 7,790,000 2.93 99.0 4.79 734,000 24,801,000 1,197,000 COSE 20,637 60.06 1,933.07 96.21 39,850 1,282,582 63,835 La Manchuria 425,705 2.95 135.00 4.07 40,317 1,848,211 55,684

  5. Slide 5: Production at Lomada de Leiva

    Production at Lomada de Leiva 5

  6. Slide 6: 2013 achievements

    2013 achievements Cut Back 2 started in main pit Main Plant Commissioned New Ponds and pumps commissioned HL Pad 3 Producing Jan 2014 6

  7. Slide 7: Lomada de Leiva Project Full production Achieved

    Lomada de Leiva Project Full production Achieved Main heap leach Pad 3 now producing Trial HL pad 400,000T loaded, with recovery performance of gold as expected Increased production to 33k ounces from nameplate 21k per annum targeted for Q2 2014 Additional 2.1M $USD capital spend required to expand

  8. Slide 8: Lomada de Leiva Project: Increasing Production

    Lomada de Leiva Project: Increasing Production Lomada Au Production by Month since May 2013 2500 2353 $3.0 Name plate Production 1750/Oz 1751 1877 1991 $2.5 1796 1679 2000 1549 Au Ounces poured Monthly 1449 1718 Revenue monthly M $US 1270 $2.0 1500 899 $1.5 1000 599 620 $1.0 500 $0.5 0 $0.0 Month 21

  9. Slide 9: Forecast expansion targets by Quarter Lomada

    Forecast expansion targets by Quarter Lomada Future Forecast production and Cashflow @ $1200 Au/Oz Lomada 10000 $13 9100 9100 9000 $11 8000 Au Ounces poured Quarterly 7000 6544 $9 Revenue Quarterly M $US 6000 5193 5178 $7 5000 $5 4000 3618 3000 $3 2000 1219 $1 1000 0 -$1 Q2 2013 Q3 2013 Q4 2013 Q1 2

  10. Slide 10: Low Cash Cost in current environment

    Low Cash Cost in current environment OPEX excluding Tax, Royalties, G&A Explosives 7% Cyanide 3% Equipment 20% Consumables 15% Maintenance 9% Lodging 6% Salaries 26% Vehicles Fuel 14% Explosives Cyanide Consumables Salaries Vehicles Fuel Lodging Maintenance Equipment  February 2014 Cash cost $649 p

  11. Slide 11: Advanced Projects

    Advanced Projects 11

  12. Slide 12: Cap-Oeste-COSE Project

    Cap-Oeste-COSE Project Two Phase development strategy 1.4Km Open Pit Ind Oxide- 195K OzEq @0.50 g/t Cut-off Potential Underground Sulphide Ind 823K Oz/Eq @ COSE 1.8km’s 3.00g/t Cut-Off 105Koz’s AuEq 12

  13. Slide 13: Cap-Oeste-COSE Staged Approach to Development

    Cap-Oeste-COSE Staged Approach to Development Staged Development Approach Stage 1 project: Develop Oxide Heap Leach Continue Feasibility and optimise testwork for selection of process route for > 1M oz Au-Eq Sulphide material Design and construct plant capable of processing both COSE and Cap-Oeste o

  14. Slide 14: Cap-Oeste-COSE Feasibility underway

    Cap-Oeste- Cap-Oeste process design and engineering well advanced, HL process route for oxide chosen COSE-Cap-Oeste Feasibility underway Agglomerated recovery curves vastly improved leach rate 76% Au in 16 days 14

  15. Slide 15: CAPEX requirement CAP-Oeste Project Stage 1 Oxide

    CAPEX requirement CAP-Oeste Project STAGE 1 OXIDE Total Stage 1 CAPEX required, 33.7M Complete Construction Final Fleet payments Design + 5-6 months and sustaining capital Testwork $13.2M $11.7M STAGE 2 2014 2015 2016 2017 $5.2M First $3.6M Place Fleet, Liner + Production Crusher and Piping Plant Or

  16. Slide 16: Growth Strategy

    Growth Strategy Key Milestones Permitting and Lomada Full construction Cap-Oeste Studies Lomada production Trial Cap-Oeste complete Decision on HL Pad 3 Stage 1 Oxide Process Route 2013 2014 2015 $US 16M $US 39M $US 96M Pre-Feasibility and Start Construction First Production Engineering Studies Cap-

  17. Slide 17: Forecast Production + Cashflow at $1,200 for 2014-2015

    Forecast Production + Cashflow at $1,200 for 2014-2105 Lomada-Cap Oeste Future Forecast production and Cashflow @ $1200 Au/Oz 25000 $30 21600 21600 21600 $25 20000 Au Ounces poured Quarterly Revenue Quarterly M $US Lomada only $20 15000 13150 $15 9100 9100 10000 6544 $10 5193 5178 5000 3618 $5 1219

  18. Slide 18: Exploration

    Exploration MT LEON CAP-OESTE 18

  19. Slide 19: Footprint in the Deseado Massif

    Footprint in the Deseado Massif 19

  20. Slide 20: Unexplored El Tranquilo block

    Unexplored El Tranquilo block  2Moz delineated within La Pampa 2.3m at 5.7ppm a very small portion of Au Felix the 80K hectare block 1.0m at 63.7ppm Au  Felix, Monte Leon and Boundary Fault to be Don Pancho CO 5.0m at 8.1ppm drilled Q2 Au COSE  Main targets are oxide Bx Valentina deposits with He

  21. Slide 21: Monte Leon, High Grade Low Sulphidation

    Monte Leon, High Grade Low Sulphidation  Excellent High Grade Au target, Ginguri style with free gold discovered in second round of drilling  2,000m follow up drilling designed to test down-dip extent of mineralisation  Monte Leon is within trucking distance of proposed Cap-Oeste processing site