Norsk Hydro Asa · OSL:NHY

Norsk Hydro Asa — Technical Presentation (November 2012)

16 slides from Norsk Hydro Asa's technical presentation, Nov 8, 2012

  1. Slide 1: Alunorte

    Alunorte Geraldo Brittes, Plant Manager Alunorte November 8, 2012

  2. Slide 2: Welcome to Alunorte

    Welcome to Alunorte

  3. Slide 3: Location

    Location Pará Total area:1.247.689,515 km² Population: 7.431.020 Belém Total area: 1.819 Km² Population: 2.105.621 (Metropolitan Area) Barcarena Total area:1.310Km² Population: 92.567

  4. Slide 4: Location

    Location HYDRO

  5. Slide 5: Plant Overview

    Plant Overview

  6. Slide 6: Shareholders – Before Closing / After Closing

    Shareholders – Before Closing Shareholders – After Closing 2,19% 2,59% 0,54% 3,62% 2,19% 2,59% 0,54% 3,62% 34,03% 57,03% 91,06% Vale S.A. Hydro Aluminium Brasil Investment B.V. Hydro Aluminium Brasil Investment B.V. Companhia Brasileira de Alumínio Companhia Brasileira de Alumínio Nippon Amazon Alum

  7. Slide 7: General information

    General information Start up in 1995, with the design capacity of 1.1 million tpy The current capacity is 6.26 millions tpy, after the completion of expansion 3 Around 4,500 total employees, direct plus permanent and temporary contractors

  8. Slide 8: Alunorte production process

    Alunorte production process PORT Albras MINE PORT ALUMINA STORAGE MRN BAUXITE STORAGE Capacity: 225,000 t BAUXITE DEWATERING Capacity: 300,000 t Moisture: 14,5% Capacity:70,000 t POWERHOUSE Soda Steam Production: 1,500 t/h EVAPORATION Spent liquor + steam Temp: 133°C Steam DIGESTION MILLING PRECIPIT

  9. Slide 9: Safety and Health

    Safety and Health Safety and Health Management System certified by the OHSAS 18.001 since February 2004 ABS (Safety Brazilian Agency) GOLD Top Award in 2009 and 2010. ABS (Safety Brazilian Agency) Silver Top Award in 2000, 2001, 2002, 2003, 2004, 2005, 2006, 2007 and 2008. Serious Injuries Frequency

  10. Slide 10: Environment

    Environment ABS (Safety Brazilian Agency) Enviromental GOLD Top Award in 2010 and 2011. 2010 - Energy efficiency recognition at Hannover Messe Environment Management System certified by the ISO 14001 since January 2004 Red Mud treatment developed with the most modern environmental technology CNI (In

  11. Slide 11: Liquid Effluent Treatment Station

    Liquid Effluent Treatment Station Rain Rain RMDA Plant Environmental Law pH 6 to 9 Effluent Treatment < 40º C < 100 NTU Station ETE 82 Pará River Results 2011 pH 7.5 34.8º C 1.7NTU

  12. Slide 12: Corporate Social Responsibility - Main Projects Ongoing

    Corporate Social Responsibility - Main Projects Ongoing Green house Project Partnership with the Brazilian Agricultural Institute. Green Houses construction with recycled tubes from Alunorte. Several families generating incoming from this project. The Green Houses allow the families to increase sign

  13. Slide 13: Bola pra Frente, Educação para Gente

    Bola pra Frente, Educação para Gente The main objective is to use the sport to improve the performance of the local students, contributing for their Social Behavior and Health education and also for the environment. Educational prize to the best students of Barcarena Selection made during the Alunor

  14. Slide 14: Production Performance

    Production Performance (000 tpy) 7000 ~6000 5910 5806 5827 6000 Expansion 3 5028 5000 4253 Expansion 2 3939 4000 Expansion 1 3000 2548 2570 Firm-up Project 2323 2000 1656 1627 1605 1436 1527 Original Design 1186 Capacity (1.1 Mi tpy) 1000 876 215 0 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2

  15. Slide 15: Alunorte Historical Evolution

    Alunorte Historical Evolution SA SA 8000 8000 Certification. Certification. Expansion Expansion 33 start start up up w/ w/ 1600 1600 employees. employees. Expansion Expansion 22 start-up. start-up. Implementation Implementation of of Lines Lines 66 and and 7. 7. 2008 2007 Expansion Expansion 11 star

  16. Slide 16: www.hydro.com

    www.hydro.com HYDRO

Norsk Hydro — Technical Presentation (November 2012) on 6ix