St. George Mining Ltd. · ASX:SGQ
St. George Mining — Investor Presentation (November 2012)
20 slides from St. George Mining's investor presentation, Nov 8, 2012
Slide 1: ASX / Media Release: Investor Presentation November 2012
ASX / MEDIA RELEASE For personal use only 8 November 2012 INVESTOR PRESENTATION – NOVEMBER 2012 St George Mining Limited (“St George Mining” or “Company”) is pleased to provide a copy of the Company's new Investor Presentation. This Investor Presentation will be used as from today for briefings by t
Slide 2: Investor Presentation November 2012
Investor Presentation November 2012 For personal use only
Slide 3: East Laverton Property
For personal use only East Laverton Property 2
Slide 4: East Laverton Property
East Laverton Property For personal use only • Over 2,000 sq km covering under-explored greenstone belts • Three extensive komatiite-ultramafic trends with high MgO units • Highly favourable geological setting for significant gold deposits on eastern edge of Yilgarn (Sunrise Dam and Tropicana) • Lar
Slide 5: For personal use only
br XR : ’ re nn Mt Keitir 1s Avene NOU eas ose =a, @) STGEORGE re s are > MINING LIMITED Waterloo’ ma 28° 1, "Ue mens ~ A lee ee “ Scotia (Go i 3 ie f 2 , ‘ae Legend Einoe Laterite@ _DBiack Swan | @ Nicket Mine ens ; + poe 5 | @ Nicke! Deposit pe ie A. Nickel Project Xa & \ ida eid me : = @ Nickel c
Slide 6: Nickel Assets (100% St George)
For personal use only Nickel Assets (100% St George) 5
Slide 7: Cambridge Nickel Prospect
Cambridge Nickel Prospect For personal use only • Advanced nickel target ready for drilling • Large ultramafic body (4km x 1.5km) on the Stella Range ultramafic horizon • Several EM conductors identified by new EM survey • Previous shallow drilling and soil geochemical surveys identified Ni values i
Slide 8: For personal use only
ST GEORGE MINING LIMITED , oe. SNRC-004 38 m @ 0.36 %Ni \szz,s00me, St George Mining Limited |
Slide 9: Project Dragon
For personal use only 8 Project Dragon
Slide 10: Farm-in Agreement
Farm-in Agreement • The Partner may earn a 70% interest by sole funding a bankable For personal use only feasibility study (BFS), with St George Mining free carried for its 30% interest up to completion of the BFS • The interest is earned over the nickel rights at 9 tenements covering 498 sq km, wit
Slide 11: 2012 Reconaissance RC Drilling
2012 Reconaissance RC Drilling For personal use only • Komatiite-hosted nickel sulphide mineralisation is the current exploration model at Project Dragon • 35 RC holes completed (April to July 2012) for 8,560m • 7 nickel targets tested along 3 ultramafic trends • 28 of 35 holes identified komatiite
Slide 12: Drill Results
Drill Results For personal use only • DRAC35 and DRAC38 are located in the Stella Range ultramafic horizon, extending for over 30 km • Identification of primary nickel mineralisation supports the presence of fertile, high-MgO ultramafic sequences • Disseminated nickel sulphides can be a peripheral e
Slide 13: Gold at East Laverton
For personal use only Gold at East Laverton 12
Slide 14: East Laverton Property
ze East Laverton Property ‘ Veconba e <a » Granny Smith ~ ®t weld ® sunrise Dam y ears ee @ Mie ke A Project [M) ere O Mulga Rock , iy — Bea: ~ en na Nort ‘ [HB stGeorge Lease [Ey Pbatiginal Reserve [ Rational Parc Nature Reserve Tropicana g ST GEORGE MINING LIMITED
Slide 15: East Laverton Project Tenements Over Aeromagnetics
6760000 n 6740000 L 6720000 i Legend * Prospect @ Target (1 Tenements — Fault == Fault; interpreted |, aA lh. Desert Dragon «© Au Prospect : Green Dragon Au Target rr rad sa! al, ih. & Au Target hs a . h Au Prospect |_| Wee y) 580000 St George Mining Limited - East Laverton Project Tenements Over Ae
Slide 16: Gold Prospects
Gold Prospects For personal use only • Desert Dragon: An extensive Au+Ag trend identified by soil geochemistry over a 2 km strike. Initial drilling encountered encouraging alteration and sulphide mineralisation. Located on Stella Range Fault and komatiite belt (Ni-Au association); a highly favor
Slide 17: 2012 Drilling Program
For personal use only 2012 Drilling Program 16
Slide 18: 2012 Drilling
2012 Drilling For personal use only • Drilling to start on 12 November 2012 • RC drilling to 250m depth • XRF spectral analysis of drill samples at site • Cambridge: Initial test drilling of nickel targets generated by the recent EM survey • Desert Dragon: Drilling of new high value Au+Ag anomaly on
Slide 19: Competent Person Statement
For personal use only COMPETENT PERSON STATEMENT: The information in this announcement that relates to Exploration Results and Mineral Resources is based on information compiled by Andrew Hawker of Hawker Geological Services Pty Ltd. Mr Hawker is a member of the Australasian Institute of Mining and
Slide 20: Disclaimer
Disclaimer For personal use only Certain statements contained in this presentation, including information as to the future financial or operating performance of St George Mining Limited (ASX:SGQ) and its projects, are forward looking statements: -may include, among other things, statements regarding
St George Mining — Investor Presentation (November 2012) on 6ix