  1. Slide 1: South Branch Wind Farm Construction Progress

    South Branch Wind Farm Construction Progress

  2. Slide 2: South Branch Wind Farm Project Basics

    South Branch Wind Farm Project Basics • 10 Siemens SWT-3.0-113 Turbines • 3.0 MW Capacity per turbine • 99.5 meter height to nacelle • 113 meter rotor diameter • Direct drive turbine, no gearbox needed • Connecting with Hydro One at 44 kV distribution lines • H.B. White is Engineering and Constructi

  3. Slide 3: Domestic Content

    Domestic Content • Tower sections were built by CS Wind in Windsor, ON • Blades were manufactured by Siemens in Tillsonburg, ON plant (SE of London) • 95% of project man-hours must be from Ontario • 105 employees on site at peak • Concrete and gravel sourced locally • Significant local spend has bee

  4. Slide 4: Project Progress Update

    Project Progress Update • Project began commercial operations on March 4th, 2014 • Site restoration begins in April 2014 • Public turning radii removal • Private access road clean-up and restoration • Public road surveys • Establish South Branch Community Fund • Discussing fund guidelines at April 1

  5. Slide 5: Cutting of Access Road

    Cutting of Access Road & renewables

  6. Slide 6: Underground Cable Trenching

    Underground Cable Trenching 6

  7. Slide 7: Foundation Mudmat

    Foundation Mudmat pa SOUTH a WIND FARM & renewables 7

  8. Slide 8: Poured Foundation

    Poured Foundation pa BRANCH a WIND FARM & renewables 8

  9. Slide 9: Finished Foundation and Base

    Finished Foundation and Base 9

  10. Slide 10: Tower Erection

    a WIND FARM Tower Erection pa BRANCH & renewables 10

  11. Slide 11: Delivery of Tower Component

    Delivery of Tower Component 11

  12. Slide 12: Substation Transformer Delivery

    Substation Transformer Delivery 12

  13. Slide 13: Permanent Met Tower

    Permanent Met Tower & renewables 13

  14. Slide 14: Stacked to Nacelle

    Stacked to Nacelle pa BRANCH a WIND FARM 7% renewables \“ 14

  15. Slide 15: Rotor Prior to Lift

    Rotor Prior to Lift & renewables

  16. Slide 16: Rotor Lift

    Rotor Lift aS SOUTH WIND FARM ~ BRANCH By & renewables 16

  17. Slide 17: Final Rotor Lift

    Final Rotor Lift Crane Equipment Used • Hub Height Crane • Liebherr LR 1600 • 600 short ton/544 metric ton crawler • Total Boom Length • 360 ft/110 m • Standing Height • 340 ft/104 m • Mid/Base Crane • Manitowoc 999 • 250 short ton/227 metric ton crawler crane • Total Boom Length • 180 ft/55 m • Sta

  18. Slide 18: Fully Assembled

    Fully Assembled a 1 > Why renewables i“ Bae Qo‘ SOUTH BRANCH WIND FARM 18