Slide 1: South Branch Wind Farm Construction Progress
South Branch Wind Farm Construction Progress
Slide 2: South Branch Wind Farm Project Basics
South Branch Wind Farm Project Basics • 10 Siemens SWT-3.0-113 Turbines • 3.0 MW Capacity per turbine • 99.5 meter height to nacelle • 113 meter rotor diameter • Direct drive turbine, no gearbox needed • Connecting with Hydro One at 44 kV distribution lines • H.B. White is Engineering and Constructi
Slide 3: Domestic Content
Domestic Content • Tower sections were built by CS Wind in Windsor, ON • Blades were manufactured by Siemens in Tillsonburg, ON plant (SE of London) • 95% of project man-hours must be from Ontario • 105 employees on site at peak • Concrete and gravel sourced locally • Significant local spend has bee
Slide 4: Project Progress Update
Project Progress Update • Project began commercial operations on March 4th, 2014 • Site restoration begins in April 2014 • Public turning radii removal • Private access road clean-up and restoration • Public road surveys • Establish South Branch Community Fund • Discussing fund guidelines at April 1
Slide 5: Cutting of Access Road
Cutting of Access Road & renewables
Slide 6: Underground Cable Trenching
Underground Cable Trenching 6
Slide 7: Foundation Mudmat
Foundation Mudmat pa SOUTH a WIND FARM & renewables 7
Slide 8: Poured Foundation
Poured Foundation pa BRANCH a WIND FARM & renewables 8
Slide 9: Finished Foundation and Base
Finished Foundation and Base 9
Slide 10: Tower Erection
a WIND FARM Tower Erection pa BRANCH & renewables 10
Slide 11: Delivery of Tower Component
Delivery of Tower Component 11
Slide 12: Substation Transformer Delivery
Substation Transformer Delivery 12
Slide 13: Permanent Met Tower
Permanent Met Tower & renewables 13
Slide 14: Stacked to Nacelle
Stacked to Nacelle pa BRANCH a WIND FARM 7% renewables \“ 14
Slide 15: Rotor Prior to Lift
Rotor Prior to Lift & renewables
Slide 16: Rotor Lift
Rotor Lift aS SOUTH WIND FARM ~ BRANCH By & renewables 16
Slide 17: Final Rotor Lift
Final Rotor Lift Crane Equipment Used • Hub Height Crane • Liebherr LR 1600 • 600 short ton/544 metric ton crawler • Total Boom Length • 360 ft/110 m • Standing Height • 340 ft/104 m • Mid/Base Crane • Manitowoc 999 • 250 short ton/227 metric ton crawler crane • Total Boom Length • 180 ft/55 m • Sta
Slide 18: Fully Assembled
Fully Assembled a 1 > Why renewables i“ Bae Qo‘ SOUTH BRANCH WIND FARM 18