Bannerman Energy Ltd · ASX:BMN

Bannerman Energy — Bannerman Resources — Australian Uranium Conference 2011

24 slides from Bannerman Energy's conference presentation, Jul 20, 2011

  1. Slide 1: Australian Uranium Conference

    For personal use only Australian Uranium Conference Fremantle, Western Australia 20 July 2011

  2. Slide 2: Technical Disclosures and Forward-Looking Disclaimers

    Technical Disclosures and Forward-Looking Disclaimers For personal use only Certain disclosures in this presentation, including management's assessment of Bannerman Resources Ltd’s plans and projects, constitute forward-looking statements that are subject to numerous risks, uncertainties and other f

  3. Slide 3: Corporate Snapshot

    Corporate Snapshot As at July 19, 2011 For personal use only Share price A$0.43 Shares - currently on issue 234 M Shares – fully diluted (for options, rights, convertible note and contingent issues) 276 M Market capitalisation (undiluted) A$101M / US$107M Average daily traded volume in last 14 month

  4. Slide 4: Objectives for 2011

    Objectives for 2011 For personal use only 1. Progress the Etango DFS. 2. Continue to improve project economics. 3. Secure development partner(s). 4. Obtain permitting approvals and licences. 5. Exploration program. 4

  5. Slide 5: Acquisition Proposal

    Acquisition Proposal For personal use only • July 9, 2011 – conditional proposal submitted by Chinese group Hanlong to acquire 100% of Bannerman for A$0.612 cash per share by way of a scheme of arrangement. • Hanlong is one of China’s largest privately-owned enterprises. • Indicative of China’s inte

  6. Slide 6: The Etango Difference

    The Etango Difference For personal use only Scale  5-7 Mlbs U3O8 per year over +20 year open pit mine life.  212 Mlbs U3O8 deposit defined (top 15 largest undeveloped deposit). Simplicity  Shallow deposit and close to established infrastructure.  Uniform and simple mineralogy facilitates efficie

  7. Slide 7: Bannerman's leverage to the uranium price

    Bannerman’s leverage to the uranium price For personal use only 7

  8. Slide 8: Top Global Project Contained Resources of Pure Uranium Projects

    Top 15 Global Project For personal use only Contained Resources (Mlbs U3O8) Developing of Pure Uranium Projects Producing 1,000 856 Proposed bid by CGNPC 800 619 600 502 488 446 407 ARMZ acquisition completed 400 343 261 256 212 173 200 101 80 0 Lethlakane Etango Inkai Rössing Husab Elkon Ranger/Jab

  9. Slide 9: Namibia

    Namibia Premier uranium mining jurisdiction For personal use only  Stable democratic government. Etango Uranium  4th largest uranium producing Project Swakopmund Windhoek country – ambitions to grow. Walvis Bay  Established infrastructure.  35 years of uranium mining – Rio Tinto, Paladin & Areva

  10. Slide 10: Erongo Uranium Province

    Erongo Uranium Province 212Mlbs U3O8 (Etango), nearby infrastructure & 1,300km2 landholding For personal use only 10

  11. Slide 11: Proven Track Record of Resource Growth

    Proven Track Record of Resource Growth A consistent growth story at <US$0.25 per lb U3O8 For personal use only * * Bannerman holds an 80% interest in the Etango Project through its Namibian subsidiary. All details reported are for 100% of the Project. 11

  12. Slide 12: Etango – A Unique Deposit

    Etango – A Unique Deposit For personal use only  ~90% of mineralisation within alaskite.  70% of deposit within 200 metres of surface.  Low pre-strip and waste/ore ratio of 3.5 to 1.  Low in acid consuming carbonates.  Rapid and uniform leaching, with consistently high recoveries.  Little, if

  13. Slide 13: Etango – Project Layout

    Etango – Project Layout For personal use only Onkelo Substantial room for improvement: Oshiveli • Project layout. N West Waste Etango Deposit East Waste • Crusher feed strategy. Rock Dump Rock Dump • Leach residue storage. Anomaly A • Utilisation of Inferred Resources. Crushing Ondjamba Plant Deposi

  14. Slide 14: Plant Throughput & Material Movement

    Plant Throughput & Material Movement The pursuit of unit cost efficiencies For personal use only PFS DFS • 15Mtpa. • Up to 20Mtpa. • Stockpiling of 5-7Mt of feed Throughput • Resource doubled in the PFS. per year. • Optimised for location of waste • Centered on plant location. Project Layout rock du

  15. Slide 15: Material Movement Optimisation

    Material Movement Optimisation Deferral of waste strip on 20Mtpa throughput scenario For personal use only 15

  16. Slide 16: Material Movement Optimisation: Waste Dump Locations

    Material Movement Optimisation Comparison of Waste Dump Locations For personal use only PFS (December 2010) DFS – Work in Progress 16

  17. Slide 17: Heap Leach Column Tests

    7m column - Progressive U extraction and acid consumption 100% 25.0 90% Recovery & Acid Consumption kg/ t ore For personal use only 80% 20.0 70% acid leach stopped; Processing Costs U extraction -% water rinse commenced. 60% 15.0  Consistent leaching, rapid initial slow acid consumption relative to

  18. Slide 18: Favourable Nature of Feed

    Favourable Nature of Feed Granitic - sand & gravel like, with no clay For personal use only Benefits  High permeability.  Uniform leach results.  Geotechnical stability supports heap leaching and possibly co-disposal of coarse leach residue with waste rock. 18

  19. Slide 19: DFS Timetable

    For personal use only 19 DFS Timetable

  20. Slide 20: The Etango Advantage – Simple, Big & Accessible

    The Etango Advantage – Simple, Big & Accessible For personal use only Scale & Longevity  212Mlbs U3O8 deposit and 5-7 Mlbs per annum.  +20 year mine life. Low sovereign risk  Politically stable with established mining legislation.  35 year history of uranium mining and exporting.  Established i

  21. Slide 21: Scale, Simplicity, Investment Leverage

    www.bannermanresources.com For personal use only Scale, Simplicity, Investment Leverage

  22. Slide 22: Mineral Resource Statement

    APPENDIX Mineral Resource Statement As at July 2011 For personal use only Etango Project* Mineral Resource Estimate at a cut-off grade of 100ppm U3O8 Category Tonnes Grade Contained U3O8 (Mt) (ppm U3O8) (Mlbs) Measured 62.7 205 28.3 Indicated 273.5 200 120.4 Measured & Indicated 336.2 201 148.7 Infe

  23. Slide 23: Recent leaching testwork - Swakopmund

    APPENDIX Recent leaching testwork - Swakopmund For personal use only 23

  24. Slide 24: Dynamic on/off Heap Leach Pad

    APPENDIX Dynamic on/off Heap Leach Pad Proven in large, low grade copper operations in South America For personal use only Dynamic on/off pad Stacking and reclaiming “Racetrack” end Central conveyors Stacker Reclaim bucket wheel 24