Boral — Corporate Update (September 2019)
23 slides from Boral's corporate update, Sep 26, 2019
Slide 1: Boral Berrima Cement - Community Liaison Group meeting
Build something great™ BORAL BERRIMA CEMENT 26 September 2019 > Community Liaison Group meeting Berrima Cement Works New Berrima
Slide 2: Agenda
Agenda ˃ Welcome, administration and safety moment ˃ Environment ˃ Operations ˃ Planning ˃ Community ˃ General Business
Slide 3: Welcome, administration and 'safety moment'
Welcome, administration and ‘safety moment’ ˃ Welcome and re-introductions ˃ Safety moment ˃ Previous meeting of the Community Liaison Group ˃ 27 June 2019 ˃ Note: Presentations and meeting notes from previous meetings are also available from the Cement Works website – www.boral.com.au/berrimacement
Slide 4: Environment
Build something great™ BORAL BERRIMA CEMENT > Environment
Slide 5: June 2019: Dust 'event' background
June 2019: Dust ‘event’ background ˃ Between 23-28 June, 27 dust complaints were made directly to the site. ˃ Event believed to have occurred between 23-24 June. ˃ Majority of complaints from Brisbane and Melbourne Streets. ˃ Follow up inspections found the dust to be cement-like. ˃ Local weather du
Slide 6: June 2019: Dust 'event' source
June 2019: Dust ‘event’ source
Slide 7: June 2019: Dust 'event' mitigation - progress
June 2019: Dust ‘event’ mitigation - progress ˃ Measures to prevent or mitigate against recurrence. ˃ Modify DC fan and install dampener. ˃ Move DC maintenance from condition-based to predictive-based. ˃ Review Air Quality Management Plan to include Trigger Action Response Plan (TARP). ˃ Trial use o
Slide 8: June 2019: Dust 'event' mitigation – Draft TARP
June 2019: Dust ‘event’ mitigation – Draft TARP
Slide 9: June 2019: Dust 'event' follow-up communication
June 2019: Dust ‘event’ follow-up communication ˃ At the Whole of Community Meeting held on 25 July, we were asked to source information about methods/products which would help clean affected solar panels/roofs. ˃ Approached car detailer for name of product used on vehicles – ‘Congo’ Low Hazard Conc
Slide 10: Air Quality Management
Air Quality Management ˃ Recent Stack Monitoring ˃ Kiln 6: 31 July 2019 (SOx, metals, HFl, HCl) ˃ Kiln 6: 1 August 2019 (VOCs, dioxins & furans, NOx, CO, CO2, O) ˃ No 6 Cement Mill Duct 1: 30 July 2019 (Particulates) ˃ No 6 Cement Mill Duct 2: 30 July 2019 (Particulates) ˃ No 6 Kiln Cooler Stack: 7
Slide 11: Air Quality Management
Air Quality Management ˃ Dust Deposition – graph of historical results and gauge location map
Slide 12: Air Quality Management
Air Quality Management ˃ Ambient Air Monitoring Program - HVAS
Slide 13: Water Quality Management
Water Quality Management ˃ Lake Quality Overflow ˃ Two overflow event during last year’s reporting period (31 Dec 2018 & 8 Apr 2019). ˃ Results from water sampled from overflow point (EPA Point 9) were: ˃ Biochemical Oxygen Demand (mg/L): <2 (Guideline: 20) ˃ Oil and Grease (mg/L): <5 (Guideline: 10
Slide 14: Operations
Build something great™ BORAL BERRIMA CEMENT > Operations
Slide 15: Operations, People, Safety
Operations, People, Safety ˃ The Cement Works has been experiencing operational issues across recent weeks. ˃ Kiln 6 has spent time offline. ˃ A blockage occurred in the pre-heater which is being rectified. ˃ Fortunately this has not generated any impact upon our ability to serve customers and norma
Slide 16: Operations, People, Safety
Operations, People, Safety ˃ Our new Solid Waste Derived Fuels (SWDF) shed extension is almost complete. ˃ Expecting to become operational towards the end of October.
Slide 17: Planning
Build something great™ BORAL CEMENT BERRIMA > Planning
Slide 18: Planning
Planning ˃ Use of HiCal 50 as part of operations. ˃ Use of carbon-based by-product from aluminium smelting in blend with coal as kiln fuel energy. ˃ Seeking approval for use during start up and shut down sequence for kiln (can currently use ‘mid production’). ˃ Application remains under Department o
Slide 19: Community
Build something great™ BORAL CEMENT BERRIMA > Community
Slide 20: Community
Community ˃ A number of community initiatives and events have received support from the site since our last meeting. ˃ Southern Highlands Business Excellence Awards held 4 September. ˃ Bowral High School Year 12 graduation. ˃ Southern Highlands Kennel Obedience Club Annual Show – 18-20 October. ˃ Ha
Slide 21: General business
Build something great™ BORAL BERRIMA CEMENT > General business
Slide 22: General business and contacts
General business and contacts ˃ Items of general business ˃ Next meetings ˃ Community Liaison Group – 5 Dec 2019. ˃ Next ‘Whole of Community’ meeting – Jul-Aug 2020 unless needed earlier. ˃ Boral Berrima Cement contacts: ˃ Berrima Cement Works Reception 4860 2222 / madeline.westnidge@boral.com.au ˃
Slide 23: Thank you for your attendance
Build something great™ BORAL BERRIMA CEMENT > Thank you for your attendance