Aker Bp Asa · OSL:AKRBP

Aker Bp Asa — Investor Day (January 2017)

85 slides from Aker Bp Asa's investor day presentation, Jan 16, 2017

  1. Slide 1: Capital Markets Day 2017

    CAPITAL MARKETS DAY 2017 AKER BP ASA January 16, 2017

  2. Slide 2: Disclaimer

    Disclaimer This Document includes and is based, inter alia, on forward-looking information and statements that are subject to risks and uncertainties that could cause actual results to differ. These statements and this Document are based on current expectations, estimates and projections about globa

  3. Slide 3: Agenda

    CAPITAL MARKETS DAY 2017 Agenda Session 1: 13:00 – 14:30  Corporate Strategy – Karl Johnny Hersvik, Chief Executive Officer  Finance – Alexander Krane, Chief Financial Officer  Exploration – Gro Gunleiksrud Haatvedt, SVP Exploration  Q&A  Coffee Break Session 2: 15:00 – 16:30  Development proj

  4. Slide 4: Today's speakers

    CAPITAL MARKETS DAY 2017 Today’s speakers Karl Johnny Hersvik, Chief Executive Officer Olav Henriksen, SVP Projects Karl Johnny Hersvik (born 1972) has been CEO of Aker BP since May 2014. Prior to joining Aker BP, he served as Olav Henriksen (born 1956) joined Det norske in January 2015. Prior to jo

  5. Slide 5: Corporate strategy

    Corporate strategy Karl Johnny Hersvik Chief Executive Officer 5

  6. Slide 6: 2016 achievements

    CORPORATE STRATEGY 2016 achievements Creation of Aker BP through merger  Diversified production base with BP Norge AS  Successful execution of integration process  83 mmboe (net) at a finding cost of ~0.7 USD/boe (post-tax) Discovered ¼ of total volumes on the NCS  Approximately 1.9x 2016 net pr

  7. Slide 7: Investment case

    CORPORATE STRATEGY Investment case  Well positioned in a continued challenging macro environment • Purely operating on the NCS: Low political risk and attractive fiscal regime • Robust balance sheet and capital flexibility: USD 2.5 billion in liquidity • Dividend floor of USD 250 million: To increa

  8. Slide 8: Solid footprint covering entire NCS

    CORPORATE STRATEGY Solid footprint covering entire NCS Skarv Solid base performance and upside potential Alvheim High production efficiency and low operating cost Ivar Aasen First oil December 2016 Skarv Johan Sverdrup World class development with break even price below 25 USD/bbl* Alvheim Ula/Tamba

  9. Slide 9: The E&P business is being challenged

    CORPORATE STRATEGY The E&P business is being challenged Pricing challenges Structural challenges Business model disruption Low cost oil & gas from the ME Lack of investments Low rate of discovery Energy efficiency Unconventionals Consumer behavior Electric vehicles Digitalization Competitive renewab

  10. Slide 10: Great savings are possible, but requires a new way of thinking

    CORPORATE STRATEGY Great savings are possible, but requires a new way of thinking Impact on costs/efficiency 20-30% Renegotiations and cancellations/tuning of activities Ease of implementation 30-50% Cultural change in how we look at improvements and cost >50% Revitalizing the business model – radic

  11. Slide 11: Three building blocks for success

    CORPORATE STRATEGY Three building blocks for success Execute Improve Grow  Deliver on improvement agenda  Be opportunistic and exploit  Deliver on existing projects  Strengthen improvement market opportunities  Realize value of resource capabilities  Achieve selective growth that is inventory

  12. Slide 12: Creating the leading independent offshore E&P company

    CORPORATE STRATEGY Creating the leading independent offshore E&P company Reorganising the value chain with Be at the forefront for digitizing E&P strategic partnerships and alliances Value chain based on a shared LEAN Flexible business model understanding, toolbox and culture ready for growth and vo

  13. Slide 13: Working together with suppliers through strategic partnerships

    CORPORATE STRATEGY Working together with suppliers through strategic partnerships  New project delivery model • Reduce engineering hours per ton platform by 50% • Cut total execution time by 25% Aker BP  Common KPIs and incentives • Long term frame agreements • Sharing of risk, both upside and dow

  14. Slide 14: Digital field models to attack inefficiencies

    CORPORATE STRATEGY Digital field models to attack inefficiencies Commercial Concept selection on FID on virtual First resources accurate field model oil production oil Semi automated Highly automated and Automated Semi automated Physical manufacturing value optimization/ robotized operations digital

  15. Slide 15: Vast business potential in focusing on flow efficiency

    CORPORATE STRATEGY Vast business potential in focusing on flow efficiency Exploration License Drilling PDO Asset block made Discovery First oil awarded decision approved decommissioned available 7-15 years AKER BP’S OPERATIONAL STRATEGY a) Understand our value streams and improve flow efficiency MAX

  16. Slide 16: Continuous improvement embedded in our culture

    CORPORATE STRATEGY Continuous improvement embedded in our culture Make Decisions S SØKENDE Drive based on Data ENQUIRING Performance and Analysis A ANSVARLIG RESPONSIBLE One team F FORUTSIGBAR PREDICTABLE Built on LEAN E ENGASJERT COMMITTED Develop People Always search for R RESPEKTFULL RESPECTFUL a

  17. Slide 17: Visible organic growth from existing portfolio

    CORPORATE STRATEGY Visible organic growth from existing portfolio Illustrative production potential, mboepd net  Strong production base of operated assets 300 Sanctioned Non-sanctioned   • ~80% liquids / ~20% gas  Alvheim Boa  Alvheim area infills/sidetracks Caterpillar  Boa infills 2017  Gar

  18. Slide 18: Ambition to grow through further M&A

    CORPORATE STRATEGY Ambition to grow through further M&A Building on our strong M&A track record Targeting new opportunities:  High asset quality Acquisition of Norwegian subsidiary for a cash Merger between Det norske and BP’s Norwegian  Operated assets consideration of USD 2.1 billion (2014) subs

  19. Slide 19: Year-end 2016 preliminary P50 reserves of 711 mmboe

    CORPORATE STRATEGY Year-end 2016 preliminary P50 reserves of 711 mmboe Development in P50 reserves (mmboe) Proven & probable reserves (P50), end 2016* 800 Other; 15 Alvheim area; 700 120 Johan Sverdrup; 300 600 Skarv area; 67 500 711 400 65% CAGR from 2007 to 2016 mmboe 300 Valhall-Hod 200 area; 84

  20. Slide 20: 274 mmboe added to the resource hopper in 2016

    CORPORATE STRATEGY 274 mmboe added to the resource hopper in 2016 Development in contingent resources Year-end 2016 mean contingent resources * Gohta +84% Other Garantiana Alvheim area 79 164 31 21 30 Skarv area Askja/Krafla 26 17 40 38 63 128 600 600 mmboe 112 Valhall area 326 160 North of Alvheim

  21. Slide 21: Finance

    Finance Alexander Krane Chief Financial Officer 21

  22. Slide 22: Financial strengths

    FINANCE Financial strengths Strong support of principal Cash generative with attractive owners Aker ASA (40%) and dividends BP plc (30%) Ownership Cash flow Financial Prudent hedging policies to Balance Robust balance sheet and risk protect downside management sheet diversified capital structure Tax

  23. Slide 23: Strong cash flow outlook and attractive dividends

    FINANCE Strong cash flow outlook and attractive dividends Illustrative production potential, mboepd net  Cash generative business from a diversified asset base 300 Sanctioned Non-sanctioned  Alvheim  Alvheim area infills/sidetracks  Boa  Caterpillar  Boa infills 2017  Garantiana  Sanctioned

  24. Slide 24: Robust balance sheet and diversified capital structure

    FINANCE Robust balance sheet and diversified capital structure Key features  7 years from 2014 USD 4,000* million RBL 1 000 2 095 1 831 uncommitted  20 banks (Secured, 1st lien) accordion option  NPV based, semi-annual redetermination  LIBOR + 3.25% (110 bps on unused amount) USD 550 million RCF

  25. Slide 25: Strong liquidity position provides flexibility

    FINANCE Strong liquidity position provides flexibility Accumulated CFFI* 2012 – 2016 (USDbn)  High investment program last five years amid a challenging macro environment  Company policy has been to retain a sufficient liquidity buffer to ensure capital flexibility 5,2 4,5 3,3  Significantly stre

  26. Slide 26: Tax regime supportive of growth

    FINANCE Tax regime supportive of growth NCS tax system and implications for Aker BP Tax-adjusted net debt (TAND) - USDbn  Key attractions of the NCS tax system • ~90% of investments recovered over 6 years 2,5 • Opex/exploration costs 78% immediate tax recovery • Financial costs recovered ~45%** • F

  27. Slide 27: Prudent financial risk management policies

    FINANCE Prudent financial risk management policies Hedging Overview of current hedges  Various hedging agreements for commodities, interest 2017 2018 2019 2020 rates and FX to mitigate financial risk when pricing and Foreign exchange rate hedges levels are viewed as attractive % hedged of total ~50

  28. Slide 28: 2017 guidance

    FINANCE 2017 guidance Item 2017 guidance 2017 production 128 – 135 mboepd 2017 Production cost USD ~11 per boe 2017 CAPEX USD 900 - 950 million 2017 EXPEX USD 280 – 300 million 2017 decommissioning USD 100 – 110 million expenditures Note: Guidance based on USD/NOK 8.5 28

  29. Slide 29: 2017 guidance - production and production cost

    FINANCE 2017 guidance - production and production cost Key activities Comparison of operated hubs, 2017  2017 production expected between 128 – 135 mboepd 50 • 78% liquids / 22% gas  2017 production cost expected to average ~11 USD/boe 40 Ula area 2017 Production cost (USD/boe) • Including tariffs

  30. Slide 30: 2017 guidance - CAPEX

    FINANCE 2017 guidance - CAPEX Key activities Split by main project  Johan Sverdrup • Engineering, procurement and construction of facilities Johan Sverdrup • Drilling & Completion of seven water injection wells Alvheim area • Concept studies phase 2 ~20%  Alvheim area • Drilling of Volund and Boa

  31. Slide 31: 2017 guidance – EXPEX and Decommissioning

    FINANCE 2017 guidance – EXPEX and Decommissioning Exploration expenditures Decommissioning expenditures  Drilling of 7 exploration wells (4 operated)  Continuous P&A activity on Valhall until 2020  Field evaluation costs (North of Alvheim, Askja/Krafla, others)  Decommissioning program for legac

  32. Slide 32: Cash flow outlook 2017

    FINANCE Cash flow outlook 2017 Illustrative 2017 cash flows *  2017 cash flow illustration based on mid-point of guidance Realised Hydrocarbon Price (USD/boe) 30 40 50 60 ranges Production cost (USD/boe) (11) (11) (11) (11) Other OPEX (USD/boe) (1) (1) (1) (1) Financial cost (USD/boe) ** (4) (4) (4

  33. Slide 33: Exploration

    Exploration Gro Gunleiksrud Haatvedt SVP Exploration 33

  34. Slide 34: Ambition to be a leading explorer on the Norwegian Continental Shelf

    EXPLORATION Loppa North Ambition to be a leading explorer on Barents Sea SE the Norwegian Continental Shelf Loppa South  Ensure long term reserve replacement and value creation  Establish new core areas Norwegian Sea NE  Discover 250 mmboe net to Aker BP in 2016 - 2020 Skarv  Continuous position

  35. Slide 35: Delivering on the exploration strategy

    EXPLORATION Delivering on the exploration strategy  Discovering the prognosed volumes on portfolio level • Securing new volumes to existing infrastructure • Enabling area development solutions • Integrated with high business development activity • New Play Innovation initiative to challenge the old

  36. Slide 36: Successful drilling in 2016

    EXPLORATION Loppa North Successful drilling in 2016 Barents Sea SE Loppa South Filicudi  2016 – North Sea campaign • Askja/Krafla: Drilling campaign with several discoveries • North of Alvheim: Discovery at Langfjellet  Additional discoveries made by extending field development wells • Kobra East

  37. Slide 37: Drilling schedule 2017

    EXPLORATION Loppa North Drilling schedule 2017 Barents Sea SE Loppa South Gohta 3 (NE)  Operated exploration wells North Sea: • Volund West • Hyrokkin • Planned campaign in the North of Alvheim (NOA) area  Partner operated wells: • Gohta (NE) – critical appraisal well to test NE segment Norwegian

  38. Slide 38: Volund West - exploring injectites

    EXPLORATION Volund West - exploring injectites SSW NNE Operated exploration well close to Alvheim infrastructure  Volund West (PL150B - 65% working interest, operator) Top Balder • Amplitude supported prospect in Hermod Formation sandstones, injected into overlying shales Top res  Clear similariti

  39. Slide 39: Imaging: Creating new opportunities in the greater Alvheim area

    EXPLORATION Imaging: Creating new opportunities in the greater Alvheim area  2016: Regional reprocessing pushing technical limits • Consistent data set over the Greater Alvheim area, outside own licenses  Result: Identification of new prospects • New candidates for tie-in accumulations to Alvheim

  40. Slide 40: Chasing anomalies near the Alvheim field

    EXPLORATION Chasing anomalies near the Alvheim field Hyrokkin (PL677 - 60%, operator) – Result of regional geophysical projects A  Hyrokkin is defined by an encouraging geophysical anomaly, comparable with the Vilje field • Vilje is an oil discovery in the Heimdal formation, within the same reservo

  41. Slide 41: Revitalizing a mature area: Langfjellet discovery/North of Alvheim

    EXPLORATION Revitalizing a mature area: Langfjellet discovery/North of Alvheim Exploration campaign overview Prospect and discovery map  Langfjellet 2016 exploration campaign • Discovery with large upside potential • Aker BP well positioned as operator in area  Langfjellet way forward Nordfjellet

  42. Slide 42: Exploring the northern extension of Johan Sverdrup

    EXPLORATION Exploring the northern extension of Johan Sverdrup Tonjer - prospect with attractive upside potential  Northern extension of Johan Sverdrup • Prospect that will trigger new opportunities given success TN Alvheim  Reservoir: Upper Jurassic Draupne Formation Tonjer well location sandston

  43. Slide 43: Gohta – critical appraisal well

    EXPLORATION Gohta – critical appraisal well Possible development project – Loppa South  First Gohta discovery was made in 2013 Gohta-Alta  2nd well on Gohta drilled in 2014 – discovery, but with remaining questions Snøhvit  3rd well on Gohta planned for 2017 • Northern part of structure • Targeti

  44. Slide 44: 2018: Moving north

    EXPLORATION Loppa North 2018: Moving north Barents Sea SE Loppa South Svanefjell Barents Sea drilling campaign  Long term strategy • Focus on Loppa High and Barents Sea SE • Awarded 3 blocks in 23rd Round, 1 as operator • Acquired exploration licenses to build portfolio with optionality • Maturing

  45. Slide 45: Vision: World leading basin integrator

    EXPLORATION Vision: World leading basin integrator Field geology – new approaches – digital integration  In depth understanding of the basins we are exploring  Basin analysis – fluid pressure, fluid flow and dynamic properties  Combine thorough and practical geoscience with machine learning from

  46. Slide 46: Q&A

    CAPITAL MARKETS DAY 2017 Q&A 46

  47. Slide 47: Development projects

    Development projects Olav Henriksen SVP Projects 47

  48. Slide 48: Projects delivered on schedule and budget in 2016

    DEVELOPMENT PROJECTS Projects delivered on schedule and budget in 2016 January March May July September November February April June August October December 48

  49. Slide 49: Upcoming milestones 2017

    DEVELOPMENT PROJECTS Upcoming milestones 2017 JAN 17 MAR 17 MAY 17 JUL 17 SEP 17 NOV 17 DEC 17 49

  50. Slide 50: 4 operated rigs in 2017

    DEVELOPMENT PROJECTS 4 operated rigs in 2017 Rig Q1 Q2 Q3 Q4 Maersk Ivar Aasen Ivar Aasen Hyrokkin NOA* Tambar* Interceptor (Accomodation) (Production wells) (Exploration) (Exploration) (Infill) Transocean Volund West Volund Boa Arctic (Infill) (Exploration) (Infill) Valhall Valhall Drilling (Produc

  51. Slide 51: Project inventory provides flexibility

    DEVELOPMENT PROJECTS Project inventory provides flexibility Plateau Sanctioned Aker BP Gross Estimated Project Operator production Equity mmboe first oil/gas Not sanctioned (gross) Gina Krog Statoil 3.3% 219 ~67 mboepd 2017 Volund infills 2017 Aker BP 65.0% 15 ~16 mboepd 2017 Valhall IP wells Aker B

  52. Slide 52: Ivar Aasen and Hanz

    DEVELOPMENT PROJECTS Ivar Aasen and Hanz Operated, ~35%* working interest  PDO for Ivar Aasen was approved on May 21, 2013  Gross P50 reserves of 199 mmboe  Production of ~67,000 boepd at plateau  Final processing and export of oil and gas at the Edvard Grieg platform  Oil export to Sture via t

  53. Slide 53: Ivar Aasen - Delivered on plan and cost

    DEVELOPMENT PROJECTS Ivar Aasen - Delivered on plan and cost Achievements Lessons learned and further improvement potential  No major HSE incidents – more than 17 million man hours  Sub optimization between individual contracts spent  Dis-aligned incentives, no risk sharing  Total cost and plan

  54. Slide 54: Johan Sverdrup

    DEVELOPMENT PROJECTS Johan Sverdrup Partner, 11.5733 % working interest  Johan Sverdrup is one of the largest oil fields on the NCS  PDO for Johan Sverdrup phase 1 was approved on August 21, 2015  Recoverable reserves of 1.9-3.0 billion boe  ~80% to be extracted from first phase investments  Pr

  55. Slide 55: Johan Sverdrup - Project progressing as planned

    DEVELOPMENT PROJECTS Johan Sverdrup - Project progressing as planned  Project progressing according to plan: • Most major contracts have been awarded • Platform construction ongoing on 22 engineering and construction sites • Pre-drilling of 8 production wells completed • Now drilling 4 pilot/apprai

  56. Slide 56: Valhall Flank West

    DEVELOPMENT PROJECTS Valhall Flank West Project Description  Infield Tor formation in West Flank RMU  1 unmanned wellhead platform (12 slots) tied back to Valhall  6 producers with option to convert 2 producers into water injection  Current reference case is depletion only with future phased wat

  57. Slide 57: Snadd project towards PDO

    DEVELOPMENT PROJECTS Snadd project towards PDO Phase 1 development  Develop discovered resources in Snadd for tie-in to Skarv FPSO in a phased development  3 wells tied in to Skarv A template, with electrically heat trace pipe-in-pipe flowline; static and dynamic umbilical tied back to FPSO  Chem

  58. Slide 58: North of Alvheim - Building a potential new core area

    DEVELOPMENT PROJECTS North of Alvheim - Building a potential new core area  North of Alvheim area holds gross mean contingent resources of 172* mmboe  Early-phase project established to assess possible concepts for area development  Two concepts for area hub are evaluated • PdQ topside + jacket •

  59. Slide 59: Alvheim - Continuing to find and develop infill targets

    DEVELOPMENT PROJECTS Alvheim - Continuing to find and develop infill targets Project status  Boa Infill – Sanctioned, two Boa infill wells planned  Detail engineering in progress at the Subsea Alliance  Volund infill – Sanctioned, commenced drilling in December 2016  Detail engineering in progre

  60. Slide 60: Partner Operated - Oda tie-in to Ula

    DEVELOPMENT PROJECTS Partner Operated - Oda tie-in to Ula Project Description  Drainage strategy - water injection pressure support  Two oil production wells and one water injector well  Subsea tie-back to Ula platform via Oselvar facilities (14 km) • Modifications on Ula • Re-use of Oselvar equi

  61. Slide 61: Brownfield Projects

    DEVELOPMENT PROJECTS Brownfield Projects Ula Tambar Valhall & Hod • Oda Tie-In to Ula • Tambar Artificial Lift • Topside modifications for tie-in of new West Flank platform • North Flank Water Injection (evaluate concepts) Skarv Alvheim Ivar Aasen • Turret mods for Snadd tie-back • Prepare for new s

  62. Slide 62: Decommissioning Projects

    DEVELOPMENT PROJECTS Decommissioning Projects Scope  P&A – Valhall DP* (30), Hod (8), Jette* (2) & Hamsun (1 expl) 2/4 G  Facilities – 2/4G*, OVD, Hod, Jette  OBO – Varg*, Jotun* & Tor  Additional scope after 2026 Hod QP DP PCP Jette * Execution ongoing 62

  63. Slide 63: Aker BP Business model principles

    DEVELOPMENT PROJECTS Aker BP Business model principles  Clear division of core  Tasks only done once competencies in the value chain  Best man for the job  Focus on efficient value creation  No overlaps in value chain  Efficient end-to-end work  Few handovers/interfaces/iterations Aker BP – w

  64. Slide 64: Long term strategic frame agreements and alliances

    Reorganising the value chain DEVELOPMENT PROJECTS Long term strategic frame agreements and alliances Alliance Traditional Time horizon Long-term From project to project No. of suppliers Minimum sufficient Several Aker BP Risk sharing & Aligned incentives and shared Dis-aligned incentives, no risk In

  65. Slide 65: Alliance Agreement and Contractual Architecture

    DEVELOPMENT PROJECTS Alliance Agreement and Contractual Architecture  The alliance is not a legal entity  The alliance agreement is a cooperation agreement to work together in a prescribed manner in the interest of the Alliance agreement parties to the alliance Articles of Agreement  Non-exclusiv

  66. Slide 66: One for all – All for one

    DEVELOPMENT PROJECTS One for all – All for one From three separate organizations to one integrated: Incentives – Shared risk and reward: Cost Cap for Overrun Contractor Overrun Most Likely Overrun Cost Saving Actual Cost Actual Cost Actual Cost Underrun shared between Overrun shared between Cost abo

  67. Slide 67: Operations

    Operations Eldar Larsen SVP Operations 67

  68. Slide 68: Production from diversified asset base

    OPERATIONS Production from diversified asset base  Total 2016 production of 118.2 mboepd • ~80% liquids and ~20% gas  2016 deliveries above target, including • Oil and gas production • Plant uptime for all Aker BP operated assets • Simplification and efficiency objectives Skarv  We have a diversi

  69. Slide 69: Strong HSE-performance

    OPERATIONS Strong HSE-performance  HSE performance stable during integration of the two companies • Overall performance better than industry average • Systematic follow up of risks related to integration activities • Close follow up from PSA during integration with no major findings reported • Acti

  70. Slide 70: Valhall / Hod hub: The chalk giant

    OPERATIONS Valhall / Hod hub: The chalk giant Operated, ~36%* working interest  The field center consists of six separate steel platforms, incl. the new process/accommodation platform (January 2013)  Two unmanned flank platforms (North and South)  Current well stock comprises 55 active wells out

  71. Slide 71: Valhall / Hod: Safe and profitable production for many years ahead

    OPERATIONS Valhall / Hod: Safe and profitable production for many years ahead Focus areas  Continue reducing cost and improving production efficiency  Injection Platform (IP) plan to restart drilling of production wells Q1-2017 • 7 wells drilling program of which 3 to be drilled in 2017  1 billio

  72. Slide 72: Ula / Tambar Hub: Area centre for several fields

    OPERATIONS Ula / Tambar Hub: Area centre for several fields Operated, ~80%* working interest  30 years of production reached in October 2016  Ula is an area hub handling production from three satellite fields: Tambar, Blane and Oselvar  The key to success have been the use of new technology, incl

  73. Slide 73: Ula / Tambar: Preparing for increased production

    OPERATIONS Ula / Tambar: Preparing for increased production Focus areas:  Deliver maximum value from base production • Continue to optimize the Ula cost base • Efficient execution of planned operational activities and facility projects • Secure base production protection through execution of requir

  74. Slide 74: Ivar Aasen and Hanz: First oil on time & budget

    OPERATIONS Ivar Aasen and Hanz: First oil on time & budget Operated, ~35%* working interest  First oil December 24, 2016: Four years after the Plan for Development and Operation (PDO) was submitted  First stage processing at Ivar Aasen, oil and gas exported to Edvard Grieg for further processing a

  75. Slide 75: Ivar Aasen: Ramp up of production

    OPERATIONS Ivar Aasen: Ramp up of production Status  Solid initial production from three wells, production limited by agreement with Edvard Grieg • Plan further ramp up of production in accordance with agreement  Safe, reliable and efficient production – no 1 priority • High uptime, secure technic

  76. Slide 76: Greater Alvheim Area

    OPERATIONS Greater Alvheim Area Operated, ~65%* working interest  2016 production increased compared to previous year due to new infill wells  Strong operational performance, with well embedded continuous improvement culture  Additional resources added with subsea tie-ins  More infill wells bein

  77. Slide 77: The Alvheim FPSO production and Alvheim area reserves

    OPERATIONS The Alvheim FPSO production and Alvheim area reserves Alvheim FPSO historical production (mboepd gross) Reserves vs. PDO (P50 gross), mmboe 400 160 350 140 Remaining reserves 300 120 Produced to end 2016 Arresting decline Reserves at PDO 250 +115% 100 200 80 60 150 40 100 +66% +76% 20 50

  78. Slide 78: Skarv Area

    OPERATIONS Skarv Area Operated, 23.84% working interest  Skarv FPSO is anchored to the seabed and has one of the world’s largest gas processing plants offshore  Field developed with subsea wells tied back to Skarv FPSO from five sub-sea templates  Transport solution: • 80 km long 26” line to Åsga

  79. Slide 79: Skarv: Efficient operations

    OPERATIONS Skarv: Efficient operations Focus areas  Continue Snadd test production to provide in depth reservoir knowledge, preparing for PDO delivery  Deliver value from low pressure production  Optimize maintenance and reduce vendor based maintenance by doing more work internally  Positional u

  80. Slide 80: Reducing cost and improving production efficiency

    OPERATIONS Reducing cost and improving production efficiency  Capture synergies across assets  Optimize maintenance and modifications  Continue the journey on simplification and efficiency incorporating lean implementation  Focus on increasing the improvement pace in Operations (incl. technology

  81. Slide 81: Concluding remarks

    Concluding remarks Karl Johnny Hersvik Chief Executive Officer 81

  82. Slide 82: Building the benchmark offshore E&P company

    CONCLUDING REMARKS Building the benchmark offshore E&P company Execute Improve Grow Reorganising the value chain with Be at the forefront for digitizing E&P strategic partnerships and alliances Value chain based on a shared LEAN Flexible business model understanding, toolbox and culture ready for gr

  83. Slide 83: Concluding remarks

    CAPITAL MARKETS DAY 2017 Concluding remarks  Strong current production base and operational cash flow  World-class project portfolio with low break even oil price levels  Identified potential within the portfolio to lift oil & gas production to 270 mboepd after 2020  Extensive improvement agenda

  84. Slide 84: Q&A

    CAPITAL MARKETS DAY 2017 Q&A 84

  85. Slide 85: Aker BP

    & AkerBP www.akerbp.com

Aker BP — Investor Day (January 2017) on 6ix