Escalera Resources Company

Escalera Resources — Double Eagle Petroleum — Investor Presentation (August 2012)

18 slides from Escalera Resources's investor presentation, Aug 14, 2012

  1. Slide 1: Double Eagle Petroleum Co

    1 Double Eagle Petroleum Co

  2. Slide 2: Corporate Information & Disclaimer

    2 Corporate Information & Disclaimer This presentation may contain projections and other forward-looking statements within the meaning of Section 21E of the Securities Exchange Act of 1934, as amended. Any such projections or statements reflect the Company's current views with respect to future even

  3. Slide 3: Double Eagle Petroleum Co. Overview

    3 Double Eagle Petroleum Co. Overview HIGHLIGHTS Proved Reserves (a) 136.6 Bcfe Proved Developed 81.6 Bcfe Proved Undeveloped 55.0 Bcfe Total Proved PV-10 ($ in Millions) $154.2 Current Production-6/30/2012, net ~28 Mmcfe/d Cash Flow from Operations (12/31/2011) $24.8M Three Year Avg Prod Costs/Mcfe

  4. Slide 4: Financial Summary

    4 Financial Summary Stong Financial Performance Stong Financial Performance Stong Financial Performance Stong Financial Performance Stong Financial Performance Stong Financial Performance Stong Financial Performance Stong Financial Performance Stong Financial Performance Stong Financial Performance

  5. Slide 5: Proven Execution

    5 Proven Execution 2003-2010 SEC Reserves Prepared by Netherland, Sewell & Associates, Inc. as of December 31 for each respective year. With a large inventory of drilling locations, we have been able to consistently grow proved developed reserves by converting our probable reserves to proved reserve

  6. Slide 6: Proven Execution: Low cost growth through the drill bit

    6 Proven Execution Low cost growth through the drill bit F&D Costs three year average of $0.75/ Mcfe; Production Costs, including taxes--$1.22 to $1.65 per Mcfe G&A Costs equals 9.4% of revenues; among lowest of peer group with revenues < $140 million

  7. Slide 7: Hedge Contracts

    Hedge Contracts Past Results of Hedging Hedging Revenue, cash % of total revenue from hedging 2008 $ 4,084 8% 2009 $ 19,244 37% 2010 $ 5,316 11% 2011 $ 10,525 21% 2012 YTD $ 7,061 34% $ 46,230 21% Current Hedging Positions-- 8/1/12 Current Hedging Positions-- 8/1/12 Current Hedging Positions-- 8/1/1

  8. Slide 8: Proven Execution: Global Hunter Securities 2011 Cost Study

    8 Proven Execution The Global Hunter Securities 2011 Finding and Development Cost Study of the 100 Largest domestic public Oil and Gas companies. Double Eagle performed very high in all key measurement matrix 2011 2011 3 Yr 3 Yr 5 Yr 5 Yr Rank Rank Rank Drillbit F&D Costs per BOE $ 4.83 3rd $ 5.71 7

  9. Slide 9: Building Blocks for Shareholder Value

    9 Building Blocks for Shareholder Value Atlantic Rim CBM Midstream Pipeline

  10. Slide 10: Growth Strategy: Development of Low Cost Assets

    10 Growth Strategy Development of Low Cost Assets Catalina CBM Unit (operated)-84 gross (60 net) wells producing 15 Mmcf/d, net; over 190 potential future drilling locations 2011 drilling program up-spaced to 160 spacing; best average production to date with average per well production greater than

  11. Slide 11: Exploration Play-Niobrara Shale

    11 Exploration Play-Niobrara Shale Niobrara Basins Double Eagle Acreage Powder River Basin Greater Green River Basin DJ Basin WR Basin Will begin completion Q3 2012 of assessment well in Atlantic Rim Shale thickness up to 1,500' in the Atlantic Rim Heavy natural fracturing based upon prior penetrati

  12. Slide 12: Exploration Play-Niobrara Shale Central Wyoming & Colorado

    12 Exploration Play-Niobrara Shale Central Wyoming & Colorado

  13. Slide 13: Exploration Play-Niobrara Shale DJ Basin

    13 Exploration Play-Niobrara Shale DJ Basin

  14. Slide 14: Double Eagle's Oil and Gas Asset Summary

    Double Eagle's Oil and Gas Asset Summary Value Component Description Proved Reserves (1) Proved Reserves (1) ~1,200 gross low risk and low cost future drilling location 136.6 Bcfe Proved ~1,200 gross low risk and low cost future drilling location -60% Proved Developed ~1,200 gross low risk and low c

  15. Slide 15: Exhibits

    Exhibits 15

  16. Slide 16: Historical drilling activity: The Atlantic Rim

    16 Historical drilling activity Catalina Unit 84 gross (60 net) wells ~120 future drilling permits approved ~190 total potential future drilling locations 56.5 Bcfe net proved reserves (12/31/2011) Spyglass Hill (formerly Sun Dog / Doty Mnt Units) 172 gross (37 net wells) ~800 total potential future

  17. Slide 17: Pinedale Anticline

    17 Pinedale Anticline QEP Operated Properties Interests in over 150 wells through 2011; Anticipate participating in 16 new wells in 2012 200+ Potential future locations Double Eagle Working Interests: 6-12.5% WI Well Economics EUR per well of ~230 Mmcfe (net) Lifting costs < $1.00 per Mcfe Estimated

  18. Slide 18: Midstream Infrastructure

    18 Midstream Infrastructure Growing source of fee-based revenue that is independent of gas prices Connects Catalina Unit to interstate pipeline 100% owned by Double Eagle 125 MMcf/d capacity; currently at ~30 MMcf/d Tie-in to third party production and transportation agreement in place Own permits t

Double Eagle Petroleum — Investor Presentation (August 2012) on 6ix