  1. Slide 1: PT Wijaya Karya Beton Tbk. Analyst Meeting FY2019

    Slide 1: PT Wijaya Karya Beton Tbk. Analyst Meeting FY2019

    PT Wijaya Karya Beton Tbk. Analyst Meeting FY2019

  2. Slide 2: Outline

    Slide 2: Outline

    OUTLINE Company Profile Business Line Projects Update Financial Highlight 2

  3. Slide 3: Company Profile

    Slide 3: Company Profile

    @uQBETON Innovetion and Trust yA OUO ssrA Xe) Vix 2e/AQUOTSREL t : OFA Sul 74 ren sit www. wikabeton.co.id

  4. Slide 4: Dewan Komisaris

    Slide 4: Dewan Komisaris

    DEWAN KOMISARIS Herry Trisaputra Zuna Bambang Pramujo Asfiah Mahdiani Korrisaris Korisaris Utama Kamisaris independen Priyo Suprobo Yohanes Babtista Priyatma Hadi Yustinus Prastowo Komisaris Independen Korisaris Korrisaris Independen

  5. Slide 5: Direksi

    Slide 5: Direksi

    DIREKSI 5

  6. Slide 6: Vision, Mission & Core Value

    Slide 6: Vision, Mission & Core Value

    VISION, MISSION & CORE VALUE V ISION M ISSION To be the foremost precast concrete ‣ Providing added value through business ‣ Continuously growing together with company in Engineering, process which meets the requirements & business partners. Production, and Installation (EPI) In expectation of the k

  7. Slide 7: Shareholders

    Slide 7: Shareholders

    SHAREHOLDERS (IPO) 31 Des 2019 8 April 2014 PT Wijaya Karya (Persero) Tbk 11,22% 6,01% Koperasi Karya Mitra Satya 0,99% Yayasan Wijaya Karya 0,99% 4,33% Treasury Stock 4,33% Public 60,00% 60,00% 28,67% Foreign 23,47% Local 22,1% 17,5% 19,5% 16,6% 19,3% 33% 25,4% 77,9% 82,5% 80,5% 83,4% 80,7% 67% 74,

  8. Slide 8: Business Portfolio

    Slide 8: Business Portfolio

    BUSINESS PORTFOLIO WTON WTON WTON 51.0% 99.5% 60.0% Associated Company : WTON 49.0% 8

  9. Slide 9: Coverage Area

    Slide 9: Coverage Area

    COVERAGE AREA 14 FACTORIES, 1 MOBILE PLANT 5 QUARRY PLANT 7 SALES AREA 3 SUBSIDIARIES, 1 ASSOCIATED COMPANY 4,05 mn ton/year Installed Capacities 9

  10. Slide 10: Sustainability Innovation

    Slide 10: Sustainability Innovation

    SUSTAINABILITY INNOVATION Applied Segmental Mouldings System to The first to produce The first company improve efficiency and whose passed PC Big PC Segmental effectivity of production. Box Girder. sleepers test track. 1984 1989 2004 1980 1985 1995 2007 The first PC Poles • The first precast concret

  11. Slide 11: Sustainability Innovation

    Slide 11: Sustainability Innovation

    SUSTAINABILITY INNOVATION • The first manufacturer PC Cylinder Piles with to produce PC Piles with diameter up to 2,000mm • Launching track slab for Launch PCCP (Prestress diameter of 800mm, and maximum length of 60 railway Concrete Cylinder Pipe) 1,000mm and 1,200mm. meter. Inner Boring System • La

  12. Slide 12: Business Line

    Slide 12: Business Line

    @uQBETON Irnoveion and Trust YA DUDS rmalu fA DUDS Fal LOA UIne Busi Li Ova RANA E | (Udteserc ALAN] Of) Leer PON usiness LIne PONS cl www. wikabeton.co.id

  13. Slide 13: Business Line

    Slide 13: Business Line

    BUSINESS LINE MATERIALS ENGINEERING PRODUCTION INSTALLATION QUARRY CIGUDEG DESIGN & CALCULATION CENTRIFUGAL POST-TENSIONING QUARRY SOUTH LAMPUNG LABORATORY RESEARCH NON CENTRIFUGAL INNER-BORING QUARRY DONGGALA READYMIX LAUNCHING GANTRY QUARRY CIBEBER QUARRY CIMALAKA 13

  14. Slide 14: Business Line: Materials

    Slide 14: Business Line: Materials

    BUSINESS LINE: MATERIALS QUARRY CIGUDEG QUARRY SOUTH LAMPUNG QUARRY DONGGALA Area: 63.6 Ha Area: 45.6 Ha Area: 35.3 Ha Cap.: 315 tons/hour Cap.: 343 tons/hour Cap.: 284 tons/hour 14

  15. Slide 15: Business Line: Materials (New)

    Slide 15: Business Line: Materials (New)

    BUSINESS LINE: MATERIALS (New) QUARRY CIBEBER, WEST JAVA QUARRY CIMALAKA, WEST JAVA Area: 1,5 Ha Area: 5,6 Ha Cap.: 150 tons/hour Cap.: 100 tons/hour 15

  16. Slide 16: Business Line: Engineering

    Slide 16: Business Line: Engineering

    BUSINESS LINE: ENGINEERING To provide the product design and calculation based on customers’ demand. 16

  17. Slide 17: Engineering: Patents and Laboratory

    Slide 17: Engineering: Patents and Laboratory

    BUSINESS LINE: ENGINEERING List of Patents in 2019 No. Patent Number Patent Modul Pracetak untuk Konstruksi Sabodam 1. S-00201901064 Modular Sistem Bangunan Pracetak dengen Kolom 2. S-00201909352 Berbentuk L dan T Sistem Sambungan Mekanis Pada Pertemuan 3. S-00201909363 Kolom dan Balok Pengikat Pada

  18. Slide 18: Engineering Research Results: Box Culvert

    Slide 18: Engineering Research Results: Box Culvert

    BUSINESS LINE: ENGINEERING Research Results : 1 Box Culvert is a rectangular precast concrete product with a large cavity in the centre which is commonly used as a drainage component. However, presently WIKA Beton has developed the Box Culvert with a larger dimension with a segmental system consisti

  19. Slide 19: Engineering Research Results: Cylinder Pile

    Slide 19: Engineering Research Results: Cylinder Pile

    BUSINESS LINE: ENGINEERING Research Results : 2 WIKA Beton recently supplied precast products in the form PC U Girder, Cylinder Pile, and PC Piles to Automated People Mover System project at Soekarno Hatta International Airport, Jakarta. Manufactured in WIKA Beton plant in Karawang and Bogor, these

  20. Slide 20: Engineering Research Results: Precast Pier Segmental

    Slide 20: Engineering Research Results: Precast Pier Segmental

    BUSINESS LINE: ENGINEERING Research Results : 3 Produced in Mobile Plant Kualanamu, North Sumatera the Precast Pier Segmental has been installed on Medan - Kualanamu Elevated Railway Project. It has 4 segments which are produced separately then assembled to be a Precast Pier. It shortens the time of

  21. Slide 21: Engineering Research Results: RWB 01

    Slide 21: Engineering Research Results: RWB 01

    BUSINESS LINE: ENGINEERING Research Results : 4 RWB 01 is a precast house with a frame structure type that is equipped with panel as the wall. It is designed as an earthquake resistant house. Products and installation methods implemented on RWB 01 are applicative, so that it only takes 1 week and 6

  22. Slide 22: Rumah WIKA Beton 01 Precast House

    Slide 22: Rumah WIKA Beton 01 Precast House

    BUSINESS LINE: ENGINEERING Research Results : 4 RUMAH WIKA BETON 01 (RWB 01) Precast House 22

  23. Slide 23: Production: 14 Factories, 1 Mobile Plant

    Slide 23: Production: 14 Factories, 1 Mobile Plant

    BUSINESS LINE: PRODUCTION PRECAST READY MIX CENTRIFUGAL NON-CENTRIFUGAL 14 FACTORIES 9 BATCHING PLANTS 1 MOBILE PLANT 57 PRODUCTION LINES 48 BATCHING PLANTS CAP. 4,05 mn TONS/YEAR 23

  24. Slide 24: Production: Centrifugal

    Slide 24: Production: Centrifugal

    BUSINESS LINE: PC PIPES PRODUCTION PC SPUN PILES PC WALL CENTRIFUGAL PC POLES PC CYLINDER PILE 24

  25. Slide 25: Production: Non-Centrifugal

    Slide 25: Production: Non-Centrifugal

    BRIDGE CONCRETE BUSINESS LINE: PRODUCTION BUILDING AND TUNNEL RAILWAY CONCRETE HOUSING NON-CENTRIFUGAL HOLLOW CORE SLAB RETAINING WALL MARINE CONCRETE 25

  26. Slide 26: Installation

    Slide 26: Installation

    E N S IONING BUSINESS LINE: POST-T INSTALLATION - B ORING INN ER 101 POST-TENSION TOOLS G GANTRY CHIN LAUN 5 INNER-BORING MACHINES 5 LAUNCHING GANTRIES 26

  27. Slide 27: Projects Update

    Slide 27: Projects Update

    @uQBETON Irnoveion and Trust ZOUAGUO Seal J 2/000} rm IVliX 74 ) fs = . ees UVIMVLIX 71 ON Mae Projects Update yn Sie ren sit www. wikabeton.co.id

  28. Slide 28: A.P. Pettarani Elevated Toll Road - Makassar

    Slide 28: A.P. Pettarani Elevated Toll Road - Makassar

    A.P. PETTARANI ELEVATED TOLL ROAD - MAKASSAR • Elevated Tollway based in Makassar, South Sulawesi. With the total length: 4,3 km. This construction build in existing road with bustle area. • Private Funding Project with total contract Rp1,6tn • Designed by WIKA Beton 28 • Started on May 2018 and fin

  29. Slide 29: High Speed Railway Project

    Slide 29: High Speed Railway Project

    HIGH SPEED RAILWAY PROJECT • High Speed Railway Project, length: 142 km with total contract Rp 1,5 tn • This Project has been started since 2018 and estimated to be finished on 2020 29 • WIKA Beton supply Ready Mix and Precast Product. • Progress up to Dec 2019 is 55%

  30. Slide 30: Terminal Kijing Mempawah

    Slide 30: Terminal Kijing Mempawah

    TERMINAL KIJING MEMPAWAH • Project located in Mempawah, West Kalimantan with total contract Rp527bn • This project is expected to be finished in 2020. 30 • WIKA Beton supply Precast Products

  31. Slide 31: Financial Highlight

    Slide 31: Financial Highlight

    @uQBETON Irnoveion and Trust ZOUAGUO Seal J 2/000} rm IVliX 74 ) fs = . . . . cee TAULIN 7d Sey. Financial Highlight ae a O10 | esat www. wikabeton.co.id

  32. Slide 32: Total Contract, Sales, Earning After Tax

    Slide 32: Total Contract, Sales, Earning After Tax

    TOTAL CONTRACT, SALES, EARNING AFTER TAX NEW CONTRACT Order Book 12.948.857 CARRY OVER Order Book 12.784.154 8.287.382 SALES 7.663.754 Order Book EARNING AFTER TAX 10.793.314 (by Millions Rp) 7.229.898 Order Book 7.517.708 7.083.384 5.996.988 6.930.628 Order Book 5.120.400 4.661.475 4.279.812 5.362.

  33. Slide 33: Income Statement Summary

    Slide 33: Income Statement Summary

    INCOME STATEMENT SUMMARY IN MILLION RUPIAH 8000000 1000000 882.422 950.717 6.930.628 7.083.384 6000000 5.362.263 750000 666.639 504.433 4000000 3.481.732 500000 REVENUE ,71% GROSS PROFIT % R 26 23,52 2000000 CAG 250000 CAG R 0 0 FY2016 FY2017 FY2018 FY2019 FY2016 FY2017 FY2018 FY2019 795.406 800000

  34. Slide 34: Consolidated Cash Flow

    Slide 34: Consolidated Cash Flow

    CONSOLIDATED CASH FLOW Description FY2015 FY2016 FY2017 FY2018 FY2019 Description 3Q 2018 Operation Activities 458.415 (79.247) 556.091 733.379 1.126.052 Investment Activities (472.119) (482.388) (531.585) (439.849) (379.292) Financing Activities (201.140) 80.216 270.985 (66.851) (9.377) Beginning B

  35. Slide 35: Profitability and Revenue Contribution

    Slide 35: Profitability and Revenue Contribution

    PROFITABILITY REVENUE CONTRIBUTION 54,5% 14,49% 13,42% 47,5% 12,73% 46,2% 12,43% 11,73% 41,6% 42,4% 42,6% 43,4% 41,4% 11,23% 10,57% 9,89% 8,10% 7,02% 7,21% 6,35% 14,0% 12,4% 10,1% 3,9% FY2016 FY2017 FY2018 FY2019 FY 2016 FY 2017 FY 2018 FY2019 Gross Profit Margin Operating Profit Margin Net Profit M

  36. Slide 36: Analyst Recommendation

    Slide 36: Analyst Recommendation

    Analyst Recommendation No Name Company Target Price Recommendation Date 1 Bayu Santoso Minna Padi Investama Sekuritas 680 buy 12-Des-19 2 Revita Dhiah Anggrainy BinaArtha Sekuritas 700 buy 4-Des-19 3 Maria Renata Danareksa 680 buy 27-Nov-19 4 Maxi Liesyaputra BNI Sekuritas 700 buy 8-Nov-19 Average 5

  37. Slide 37: Project Portfolio

    Slide 37: Project Portfolio

    PROJECT PORTFOLIO SIMPANG SUSUN SEMANGGI MASS RAPID TRANSIT (MRT) LIGHT RAPID TRANSIT (LRT) WIKA Beton generated the main It becomes the first high quality precast The Jakarta LRT line Corridor 1 connects component of two elevated ramp concrete tunnel segments in Indonesia Kelapa Gading to Velodrome

  38. Slide 38: Awards in 2019 (1/4)

    Slide 38: Awards in 2019 (1/4)

    AWARDS IN 2019 (1/4) The Most Strategic CFO 2019 Anak Usaha BUMN Terpopuler di Media Silver Winner Media Cetak Anak Usaha BUMN Bisnis Indonesia PR Indonesia PR Indonesia Pengembangan Talenta Terbaik III Anak Usaha BUMN Terbaik 2019 2nd Winner The Most Promising Company BUMN Track in Branding Campaig

  39. Slide 39: Awards in 2019 (2/4)

    Slide 39: Awards in 2019 (2/4)

    AWARDS IN 2019 (2/4) 2nd Winner The Most Promising Company Indonesia’s Most Valuable Brand in Strategic Marketing Ganesha Wirya Jasa Utama Brand Finance Plc, Majalah SWA & WIR Global Marketeers Institut Teknologi Bandung Top 10 Emiten Terbaik Kategori Top 5 Social Business Innovation Indonesia Best

  40. Slide 40: Awards in 2019 (3/4)

    Slide 40: Awards in 2019 (3/4)

    AWARDS IN 2019 (3/4) The Most Innovative and Affordable for Mass Best Equitable Treatment of Shareholders Salah Satu Emiten dalam Indeks SRI-KEHATI Building Material (Precast Tahan Gempa) Top 50 Emiten Mid Cap 2 Periode Berturut-turut Majalah Property & Bank, AJPK IICD Yayasan KEHATI & Majalah SWA 3

  41. Slide 41: Awards in 2019 (4/4)

    Slide 41: Awards in 2019 (4/4)

    AWARDS IN 2019 (4/4) Peringkat Emas 15th National Quality Award of Top Digital Implementation 2019 Top Leader on Digital Implementation 2019 Indonesia Majalah IT Works Majalah IT Works SNI Award 2019 41

  42. Slide 42: WTON in Index

    Slide 42: WTON in Index

    WTON IN INDEX IDX80 Februari - Juli 2020 Kompas100 Februari - Juli 2020 IDXValue30 Februari - Agustus 2020 IDXBUMN20 Februari - Juli 2020 Pefindo25 Februari - Juli 2020 SRIKEHATI November 2019 - April 2020 42

  43. Slide 43: Terima Kasih

    Slide 43: Terima Kasih

    THANK TERIMAYOU KASIH PT Wijaya Karya Beton Tbk. WIKA Tower 1 Lt. 2-4 Jl. D.I. Panjaitan Kav. 9-10 Jakarta 13340 (+62 21) 819 2802 Humas : sekper@wika-beton.co.id Pemasaran : marketing@wika-beton.co.id

Source: company website