Platinum Group Metals Ltd. · TSX:PTM
Platinum Group Metals — Investor Presentation (2006)
15 slides from Platinum Group Metals's investor presentation, 2006
Slide 1: Mining Scorecard
Mining Scorecard 10 Criteria We Use For Our Mining Investment Strategy The Path to Production
Slide 2: 10 criteria we use for our mining investment strategy
10 criteria we use for More than a geologist – engineers and operators that our mining have found, financed, built and investment operated mines strategy Start early – key acquisitions made 2-3 years ago before the metal price moves The Path to Production
Slide 3: 10 criteria we use for our mining investment strategy
10 criteria we use for Focus on an area with a large scale position of more than 50 our mining square kilometres investment – accretive knowledge base strategy – major deposit scale Areas that have a proven history of large scale mines in close proximity The Path to Production
Slide 4: 10 criteria we use for our mining investment strategy
10 criteria we use for Look for new discoveries in our mining proven areas that “change the investment paradigm” and open a new strategy area Don’t rely on the premise: “the old guys missed it” The Path to Production
Slide 5: 10 criteria we use for our mining investment strategy
10 criteria we use for our mining investment Comparison of the key strategy characteristics against the peers and the producers - Tonnes that can be reached - Grade is king - Depth takes time in addition to money The Path to Production
Slide 6: 10 criteria we use for our mining investment strategy
10 criteria we use for Does the opportunity have our mining investment from the majors or is it an outright sale investment strategy Does the group have a track record of major company partnerships or sales What is the impact of the project or investment on shares outstanding The Path to Production
Slide 7: Platinum Group Metals Ltd (PTM-TSX) Scores Well on the Mining Score Card
PTM-TSX Platinum Group Metals Ltd (PTM –TSX) Scores Well on the Mining Score Card – but to be fair it is our Score Card The Path to Production
Slide 8: Management
Management • PTM includes a team in South Africa and Canada that has a track record of mine discovery, construction and operations: • A team that has track record of work at large scale + $100M financing backgrounds – Aber Diamonds – Cathedral Gold – Harmony – Anglo Platinum The Path to Production
Slide 9: Targeting 250,000 oz/yr
• Targeting 250,000 oz /yr – Scale Project 1 • Project 2 and 3 being drilled The Path to Production
Slide 10: Western Bushveld South Africa: Proven District
PLATINUM Proven – ANNUAL GLOBAL PRODUCTION – 6.5M Ozs District Russia (2 mines) 6% 850,000 Ozs 13% North America (3 mines) 390,000 Ozs Zimbabwe (2 mines) 2% 150,000 Ozs 70% Western Bushveld Eastern & Northern Bushveld South Africa (5 mines) South Africa (12 mines) 9% 580,000 Ozs 4,500,000 Ozs The Pa
Slide 11: 35,000 m drilled by PTM in 2005
New Discovery 35,000 m drilled by PTM in 2005 The Path to Production
Slide 12: Disclosure
This presentation is prepared by Platinum Group Metals Ltd (“PTM”) management and PTM is solely responsible for content and format. R. Michael Jones P.Eng is a non-independent Qualified Person and has compiled this presentation from industry information and 43-101 reports and new releases with speci
Slide 13: Starting at Surface: Grade, Tonnes and Depth
Tonnes Grade and Depth Starting at Surface Grade Highlights: The Path to Production
Slide 14: Western Bushveld Joint Venture Partners
Western Bushveld Joint Venture Partners • Western Bushveld Joint Venture (WBJV) is a large near-surface section of the high-yield Western Limb of the Bushveld Complex • 67 square kilometres 37% • Current Resources 40% of area and 4kms of 11km potential platinum reef strike length • PTM is operator a
Slide 15: Shares
Shares Shares Issued: 47,698,734 Warrants: 3,017,327 (@ C$1.50, to Oct ‘06) 1,100,000(@ C$1.75, to April ‘07) 850,0000 (@ C$ 1.75 to March ’08) Options: 3,314,875 (@ C$0.89 average) Fully Diluted: 55,980,936 Market Capitalization: US$ 81M On the basis of grade, depth and shares outstanding PTM is at