TomaGold Corporation Class A · TSXV:LOT

TomaGold Corporation Class A — Investor Presentation (March 2023)

22 slides from TomaGold Corporation Class A's investor presentation, March 2023

  1. Slide 1: Investor Presentation March 2023

    TSXV: LOT OTCQB: TOGOF INVESTOR PRESENTATION MARCH 2023 www.tomagoldcorp.com

  2. Slide 2: Disclaimer

    DISCLAIMER This presentation contains certain “forward-looking statements”, including, but not limited to, statements regarding the Company’s strategic plans, timetables, the evolution of mineral reserves and resources, mine operating costs, capital expenditures, work programs, development plans, ex

  3. Slide 3: Diversified Exploration Company

    DIVERSIFIED EXPLORATION COMPANY ABOUT US CANADIAN EXPLORATION COMPANY VISION CHIBOUGAMAU MINING CAMP (QC) Gold-copper explorer with a bias for rare earth elements (REE) • Owns 100% of Obalski past producing Au-Ag-Cu project and lithium (Li) • Owns 3 projects adjacent to 433,500 oz Monster Lake depos

  4. Slide 4: Solid Mining and Financial Expertise

    SOLID MINING AND FINANCIAL EXPERTISE MANAGEMENT TEAM | BOARD OF DIRECTORS | ADVISORY BOARD www.tomagoldcorp.com

  5. Slide 5: Leadership

    LEADERSHIP MANAGEMENT TEAM David Grondin, President & CEO Martin Nicoletti, CPA CA, CFO André Jean, P.Eng., Director of Exploration, Quebec Caitlin Jeffs, P.Geo., Director of Exploration, Ontario and Rest of Canada BOARD OF DIRECTORS David Grondin Michel E. Labrousse Jean-Sébastien Jacquetin Caitlin

  6. Slide 6: Diversified Portfolio of Projects

    DIVERSIFIED PORTFOLIO OF PROJECTS OBALSKI (Au-Cu) | STAR LAKE (REE) | BRICK EXTENSION (Li-REE) www.tomagoldcorp.com

  7. Slide 7: Obalski

    OBALSKI PAST PRODUCING GOLD-SILVER-COPPER MINE • TomaGold owns 100% of the Obalski property, located south of Chibougamau, Quebec, a known mining camp and favourable mining jurisdiction • The Obalski property is comprised of 74 claims covering 2 724 hectares (27 km2), one mining concession and hosts

  8. Slide 8: Obalski: Previous Drilling Programs

    OBALSKI PREVIOUS DRILLING PROGRAMS 2021-22 drilling program (11,500 m) New large intersections at depth OBS-21-009: 1.41 g/t Au over 28.50 m, incl. 6.84 g/t Au over 1.50 m and 4.03 g/t Au over 4.50 m OBS-21-010A: 0.33 g/t Au over 54.80 m, incl. 1.44 g/t Au over 3.50 m OBS-21-010: 0.32 g/t Au over 45

  9. Slide 9: Obalski: 2021-22 3D IP Survey Results

    OBALSKI 2021-22 3D IP SURVEY RESULTS DECEMBER 2021 PHASE 1: Positive preliminary results • The DAS Vision3D IP survey preliminary report indicated the presence of large geophysical anomalies to the west and southwest of the Obalski deposit. • The Corporation has forwarded its full drilling database

  10. Slide 10: Obalski: 2021-22 3D IP Survey Results

    OBALSKI 2021-22 3D IP SURVEY RESULTS Chargeability anomalies at vertical depths of 105 m, 205 m and 305 m show strong potential at depth www.tomagoldcorp.com TSXV: LOT 10

  11. Slide 11: Obalski: 2021-22 3D IP Survey Results

    OBALSKI 2021-22 3D IP SURVEY RESULTS Chargeability anomalies show strong potential at depth www.tomagoldcorp.com TSXV: LOT 11

  12. Slide 12: Obalski: New Data Reveals 800 m Mineralized Corridor

    OBALSKI 2021-22 3D IP SURVEY RESULTS MARCH 2023: NEW DATA REVEALS AN 800 M MINERALIZED CORRIDOR CUT BY A PERPENDICULAR 500 M FAULT ZONE • Latest data, specifically from the new mineralization extensions, show an east-west mineralized corridor (“A” and “B”) with a strike length of nearly 800 m, cut b

  13. Slide 13: Obalski: 2022 Drilling Program Completed

    OBALSKI 2022 DRILLING PROGRAM COMPLETED (3,000 M) • 3D model shows clear chargeability and gold index targets • New south target is significantly large 600 m X 350 m at almost 300 m of vertical depth • Results pending following additional assay testing www.tomagoldcorp.com TSXV: LOT 13

  14. Slide 14: Star Lake: New REE Project

    STAR LAKE NEW REE PROJECT FAVORABLE GEOLOGY • In 2008, 5 pegmatites dykes were identified with no follow-up PEGMATITES ARE USUALLY THE HOST ROCKS OF REE AND LITHIUM DEPOSITS MULTI-MINERAL POTENTIAL • Historical work and compilation have shown showings of: Uranium/Thorium, Copper, Nickel, Rare Earth

  15. Slide 15: Star Lake: New REE Project

    STAR LAKE NEW REE PROJECT Since the Fall of 2022, TomaGold doubled the size of the property to: • 214 claims (10,906 ha or 109 km2) TOMAGOLD HOLDS THE LARGEST LAND POSITION IN THE AREA Multiple outcropping pegmatites www.tomagoldcorp.com TSXV: LOT 15

  16. Slide 16: Star Lake: High-Grade TREO Discovery

    STAR LAKE NEW REE PROJECT HIGH-GRADE TREO DISCOVERY • Grab sample of 3.95% TREO (18,974 ppm Ce2O3, 10,849 ppm La2O3, 5,369 ppm Nd2O3, 1,931 ppm Pr2O3, 902 ppm Sm2O3, 184 ppm Dy2O3, 15 ppm Eu2O3, 511 ppm Gd2O3, 27 ppm Ho2O3, 51 ppm Tb2O3, 4 ppm Tm2O3 and 608 ppm Y2O3) • Sample taken from a pegmatite

  17. Slide 17: Star Lake: High-Grade TREO Discovery

    STAR LAKE Sample TREO La203 Ce2o3 Pr2o3 Nd2o3 Sm2o3 Eu2O3 Gd2O3 Tb2O3 Dy2O3 Ho2O3 Tm2O3 Y2O3 (%) (ppm) (ppm) (ppm) (ppm) (ppm) (ppm) (ppm) (ppm) (ppm) (ppm) (ppm) (ppm) C00281802 0.0 2.8 4.7 0.6 2.1 0.5 0.5 0.7 0.2 1.3 0.4 0.3 12.1 NEW REE PROJECT C00281803 3.95 10849.2 18974.6 1931.0 5369.0 902.2 1

  18. Slide 18: Brisk Extension

    BRISK EXTENSION NEW LITHIUM/REE PROJECT PRIME LOCATION: • 107 claims (5,487 ha or 55 km2) located near Zones 1, 2, 3 and 6 of Monger Gold’s Brisk project, and on the same geological corridor as the Cancet (5.6% Li2O over 36.5 m) and Corvette (1.65% Li2O over 159.7 m) projects, held by Winsome Resour

  19. Slide 19: Projecting an Active 2023 Year

    PROJECTING AN ACTIVE 2023 YEAR NEXT STEPS | CAPITAL STRUCTURE www.tomagoldcorp.com

  20. Slide 20: Next Steps

    NEXT STEPS PROJECTING AN ACTIVE 2023 YEAR Obalski (Gold-Copper-Silver) • Pending drilling results from the 3,000-metre drilling program • Additional borehole IP SURVEY (currently underway) • Additional metallurgical and mineralogy analysis (currently underway) • Additional drilling planned on newly-

  21. Slide 21: Capital Structure

    CAPITAL STRUCTURE WELL-FINANCED AND LEAN OPERATIONAL STRUCTURE Shares outstanding 179.7 million Options 9.3 million Warrants 2.3 million Shares fully diluted 191.3 million Share price (as of March 3, 2023) $CA 0.03 High – low (52 weeks) $CA 0.07 - $CA 0.025 Market capitalization $CA 5.4 million 55%

  22. Slide 22: TomaGold Corporation

    TOMAGOLD DAVID GRONDIN, PRESIDENT & CEO CORPORATION david.grondin@tomagoldcorp.com TSXV: LOT 514-583-3490 www.tomagoldcorp.com

TomaGold — Investor Presentation (March 2023) on 6ix