Stelco — Corporate Update (January 2021)
15 slides from Stelco's corporate update, Jan 27, 2021
Slide 1: Lake Erie Works Community Liaison Committee Meeting Q4 2020
Lake Erie Works Community Liaison Committee Meeting Q4 2020 January 2021
Slide 2: Agenda
Agenda 1. Introductions 2. Performance under O.Reg. 419/05 Site Specific Standard Order – Particulates 3. Action Item from Previous Meeting 4. Seasonal Fugitive Dust Management 5. Community Feedback 6. Adjournment
Slide 3: Site-Specific Standard Order (Particulates): Performance Review – Daily
Site-Specific Standard Order (Particulates): Performance Review – Daily During Rehabilitation Project (Oct – Dec 2020) Doors Lids Off-takes Date (% Leaks) (% Leaks) (% Leaks) 2015 Thresholds 54% 2% NA (July 2 start) 2016 Thresholds 32% 2% NA 2017-2019 Thresholds 10% 2% 5% 2020 Thresholds 5% 1% 4% Oc
Slide 4: Site-Specific Standard Order (Particulates): Performance Review – 30 Day Rolling Averages
Site-Specific Standard Order (Particulates): Performance Review – 30 Day Rolling Averages During Rehabilitation Project (Oct – Dec 2020) Charging Doors Lids Off-takes Date (sec) (% Leaks) (% Leaks) (% Leaks) (log avg) 2015 Limits 38% 0.8% 25% 12 sec (July 2 start) 2016 Limits 22.5% 0.8% 15% 12 s 201
Slide 5: Site-Specific Standard Order (Particulates): Performance Review – Daily Observations
Site-Specific Standard Order (Particulates): Performance Review – Daily Observations – During Rehabilitation Project (Oct - Dec 2020) Pushing Emission Date (opacity %) 2015 Threshold ≥ 50% (July 2 start) 2016 – 2018 ≥ 50% 2019 ≥ 40% 2020 ≥ 30% Oct 1 – Dec 31, 2020 0 – 40% Range (5.89%) (Average) Oct
Slide 6: Site-Specific Standard Order (Particulates): Performance Review – Additional Items
Site-Specific Standard Order (Particulates): Performance Review – Additional Items • There were no community complaints for the period of Q4 2020 related to the Site-Specific Standard • MECP to provide verbal comments
Slide 7: Action Item: 30 Day Rolling Average of Door Emissions
Action Item: 30 Day Rolling Average of Door Emissions 40 35 30 Percent Leaking Doors 25 20 15 10 5 0 2-Jul-15 13-Nov-16 28-Mar-18 10-Aug-19 22-Dec-20 Current Limit Battery Performance Rehab Start
Slide 8: Action Item: 30 Day Rolling Average of Lid Emissions
Action Item: 30 Day Rolling Average of Lid Emissions 1.2 1 0.8 Percent Leaking Lids 0.6 0.4 0.2 0 2-Jul-15 13-Nov-16 28-Mar-18 10-Aug-19 22-Dec-20 Current Limit Battery Performance Rehab Start
Slide 9: Action Item: 30 Day Rolling Average of Offtake Emissions
Action Item: 30 Day Rolling Average of Offtake Emissions 35 30 25 Percent Leaking Offtakes 20 15 10 5 0 2-Jul-15 13-Nov-16 28-Mar-18 10-Aug-19 22-Dec-20 Current Limit Battery Performance Rehab Start
Slide 10: Action Item: 30 Day Rolling Average of Charging Emissions
Action Item: 30 Day Rolling Average of Charging Emissions 14 12 10 Log Avg Seconds 8 6 4 2 0 2-Jul-15 2-Jul-16 2-Jul-17 2-Jul-18 2-Jul-19 2-Jul-20 Battery Performance Current Limit
Slide 11: Seasonal Fugitive Dust Management
Seasonal Fugitive Dust Management Background • Due to the seasonal changes in weather and storage requirements for raw materials, Stelco’s fugitive dust management needs to adapt to the conditions as well. Summer • Paved Roads – sweeping and vacuuming • Unpaved Roads – applying calcium chlorine, oil
Slide 12: Seasonal Fugitive Dust Management (2)
Seasonal Fugitive Dust Management (2) Winter • Paved Roads – snow removal, sweeping and vacuuming when feasible • Coal piles – water dust control reduced; inventory of coal is moved into storage piles that are oriented in the direction of the prevailing winds; storage piles sealed. Spring • Paved Ro
Slide 13: Community Feedback
Community Feedback STELCO (stexco]
Slide 14: Next Meeting Dates
Next Meeting Dates • Wed. April 28, 2021 • Wed. July 28, 2021 • Wed. Oct. 27, 2021